Letter Sequence Draft Other |
|---|
|
|
MONTHYEARTSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections Project stage: Request ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections Project stage: RAI ML20335A1732020-11-18018 November 2020 Electric Power Research Institute, Request for Withholding of the Following Commercial Document: Feasibility Study for Multi-Cycle 600TT Operational Assessments Project stage: Request ML21070A1972021-03-0202 March 2021 Electric Power Research Institute (EPRI) - Request for Withholding of the Commercial Document on Steam Generator Management Program Extended Inspection Interval Analyses of Axial ODSCC at Tube Support Plate Intersections on High Residual St Project stage: Request ML21068A3592021-03-24024 March 2021 Draft Traveler SE of TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections Project stage: Draft Other ML21069A1722021-03-24024 March 2021 Draft Model SE of TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections Project stage: Draft Other ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections Project stage: Draft Approval ML21097A1872021-03-30030 March 2021 Email: TSTF Review of Draft Safety Evaluations for TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspections Project stage: Draft Other ML21098A1882021-04-14014 April 2021 Final SE of Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections Project stage: Approval ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections Project stage: Approval ML21096A2742021-04-14014 April 2021 Final Model SE of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections Project stage: Other 2021-03-02
[Table View] |
Text
From:
Brian Mann To:
Honcharik, Michelle
Subject:
[External_Sender] TSTF Review of Draft Safety Evaluations for TSTF-577, Rev. 1, "Revised Frequencies for Steam Generator Tube Inspections" Date:
Tuesday, March 30, 2021 7:29:07 AM Attachments:
image001.png
- Michelle,
The TSTF has reviewed the draft Safety Evaluations for TSTF-577, Rev. 1, "Revised Frequencies for Steam Generator Tube Inspections" that were provided by the NRC on March 24.
The TSTF has no comments on the draft Safety Evaluations other than the two editorial comments we discussed last week:
In the traveler SE, page 10, there is a footnote that references the audit report (ML20216A673) which is not publicly available. On Page 8, the audit summary is referenced as ML20345A008 and that is available. We recommend revising the page 10 footnote to include the same accession number as the page 8 footnote and change Technical Specifications Task Force-577 to TSTF-577.
In the model SE, page 3, line 36, the bullet should be in bold and bracketed and be reworded to be appropriate for a plant-specific SE.
The TSTF does not intend to send a letter in response to the staffs March 24 letter and this email serves to document our comments.
Should you have any questions, please contact me.
Brian
Brian D. Mann Vice President of Licensing EXCEL Services Corporation (804) 339-7034 brian.mann@excelservices.com www.excelservices.com www.nukapedia.com