IR 05000335/2020006
| ML21061A244 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/03/2021 |
| From: | Booma Venkataraman Division Reactor Projects II |
| To: | Moul D Florida Power & Light Co |
| References | |
| IR 2020006 | |
| Download: ML21061A244 (6) | |
Text
March 3, 2021
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR ST. LUCIE NUCLEAR PLANT, UNIT 1 AND UNIT 2 - REPORT 05000335/2020006 AND 05000389/2020006
Dear Mr. Moul:
The Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of St. Lucie Nuclear Plant Unit 1 and Unit 2, reviewing performance indicators (PIs),
inspection results, and enforcement actions from January 1, 2020, through December 31, 2020.
This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at St. Lucie Nuclear Plant Unit 1 and Unit 2 during the most recent quarter, was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
In the 2019 Annual Assessment Letter (ADAMS Accession No. ML20063N712) the NRC identified a cross-cutting theme in the Safety Conscious Work Environment (SCWE) area. The licensee met this criterion because the NRC issued a severity level II enforcement action on September 12, 2019, that involved discrimination (ADAMS Accession No. ML19234A332). The inspectors reviewed the licensees response to the notice of violation (NOV) and determined that the reason, corrective actions taken and planned to address recurrence, for this violation were adequately addressed and captured on the docket. This NOV was closed in the St. Lucie integrated inspection report 05000335/2020002 and 05000389/2020002 (ADAMS Accession No. ML20212L728). The NRC has determined that the licensee no longer meets the criteria for continued monitoring of the SCWE cross-cutting theme.
The enclosed inspection plan lists the inspections scheduled through December 31, 2022.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
Additionally, during this period the NRC will perform inspections per Temporary Instruction (TI)
2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01).
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
Please contact me at 301-415-2934 with any questions you have regarding this letter.
Sincerely,
/RA/
Booma Venkataraman, Acting Chief
Reactor Projects Branch 3
Division of Reactor Projects
Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
Enclosure:
St Lucie Inspection/Activity Plan (03/01/2021 - 12/31/2022)
cc Distribution via ListServ SUBJECT:
ANNUAL ASSESSMENT LETTER FOR ST. LUCIE NUCLEAR PLANT, UNIT 1 AND UNIT 2 - REPORT 05000335/2020006 AND 05000389/2020006, DATED: March 3, 2021 DISTRIBUTION:
M. Kowal, RII L. Gibson, RII S. Price, RII OE MAIL RIDSNRRDRO PUBLIC RidsNrrPMStLucie Resource ROPassessment Resource ROPreports Resource ADAMS Accession No.
OFFICE RII: DRP RII: DRP RII: DRP NAME J. Hamman A. Wilson B. Venkataraman DATA 2/24/21 2/24/21 3/3/21 OFFICAL RECORD COPY ML21061A244
Saint Lucie 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count MATERIAL CONTROL & ACCOUNTING
1, 2 01/01/2021 12/31/2021 IP 71130.11 000742 Material Control and Accounting (MC&A)
TI-194, OPEN PHASE CONDITION, REV 2
1, 2 03/01/2021 03/05/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
UNIT 1 IN-SERVICE INSPECTION +SG
1 04/12/2021 04/16/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
CORPORATE OFFICE AA/FFD INSPECTION
1, 2 04/19/2021 04/23/2021 IP 71130.01 000733 Access Authorization 1, 2 04/19/2021 04/23/2021 IP 71130.08 000740 Fitness For Duty Program SECURITY BASELINE INSPECTION
1, 2 05/10/2021 05/14/2021 IP 71130.01 000733 Access Authorization 1, 2 05/10/2021 05/14/2021 IP 71130.02 000734 Access Control 1, 2 05/10/2021 05/14/2021 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 05/10/2021 05/14/2021 IP 71130.07 000739 Security Training 1, 2 05/10/2021 05/14/2021 IP 71130.08 000740 Fitness For Duty Program 1, 2 05/10/2021 05/14/2021 IP 71130.09 001656 Security Plan Changes 1, 2 05/10/2021 05/14/2021 IP 71151 001338 Performance Indicator Verification TARGET SET INSPECTION
1, 2 05/17/2021 05/21/2021 IP 71130.14 000743 Review of Power Reactor Target Sets UNIT 2 IN-SERVICE INSPECTION +SG
2 08/30/2021 09/03/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1, 2 08/30/2021 09/03/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 08/30/2021 09/03/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/30/2021 09/03/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 08/30/2021 09/03/2021 IP 71124.04 000728 Occupational Dose Assessment 1, 2 08/30/2021 09/03/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation Page 1 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Saint Lucie 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
1, 2 08/30/2021 09/03/2021 IP 71151 000746 Performance Indicator Verification DESIGN BASES ASSURANCE INSPECTION (TEAMS)
1, 2 10/18/2021 10/22/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1, 2 11/01/2021 11/05/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
SAINT LUCIE REQUAL INSPECTION
1, 2 11/01/2021 11/05/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EMERGENCY PREPAREDNESS EXERCISE INSPECTION
1, 2 02/07/2022 02/11/2022 IP 71114.01 000716 Exercise Evaluation 1, 2 02/07/2022 02/11/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 02/07/2022 02/11/2022 IP 71151 001397 Performance Indicator Verification DESIGN BASES ASSURANCE INSPECTION (PROGRAMS)
1, 2 02/28/2022 03/04/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 03/14/2022 03/18/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements SECURITY BASELINE INSPECTION
1, 2 04/11/2022 04/15/2022 IP 71130.02 000734 Access Control 1, 2 04/11/2022 04/15/2022 IP 71130.09 001656 Security Plan Changes 1, 2 04/11/2022 04/15/2022 IP 71151 001338 Performance Indicator Verification PROBLEM IDENTIFICATION AND RESOLUTION
1, 2 05/02/2022 05/20/2022 IP 71152B 000747 Problem Identification and Resolution TRIENNIAL HEAT SINK PERFORMANCE
1, 2 07/18/2022 07/22/2022 IP 71111.07T 000700 Heat Sink Performance UNIT 1 IN-SERVICE INSPECTION +SG
1 09/05/2022 09/09/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY INSPECTION
1, 2 09/12/2022 09/16/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 09/12/2022 09/16/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation Page 2 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Saint Lucie 03/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count RP OCCUPATIONAL RAD SAFETY INSPECTION
1, 2 09/12/2022 09/16/2022 IP 71151 000746 Performance Indicator Verification NFPA 805 TRIENNIAL FIRE PROTECTION INSPECTION
1, 2 10/17/2022 10/21/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1, 2 10/31/2022 11/04/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Page 3 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report