ML21056A249

From kanterella
Jump to navigation Jump to search
Calendar Year (Cy) 2020 Baseline Inspection Completion
ML21056A249
Person / Time
Issue date: 02/25/2021
From: Mark Miller
Division Reactor Projects II
To: Chris Miller
Office of Nuclear Reactor Regulation
References
Download: ML21056A249 (36)


Text

February 25, 2021 MEMORANDUM TO:

Chris G. Miller, Director Division of Reactor Oversight Office of Nuclear Reactor Regulation FROM:

Mark S. Miller, Director Division of Reactor Projects

SUBJECT:

CALENDAR YEAR (CY) 2020 BASELINE INSPECTION COMPLETION This memorandum documents, in accordance with Inspection Manual Chapter (IMC) 2515, Light -Water Reactor Inspection Program - Operations Phase, the results of Region IIs implementation of the Reactor Oversight Process (ROP) Baseline Inspection Program for Calendar Year (CY) 2020. IMC 2515 defines the baseline inspection program completion for the Reactor Oversight Process (ROP) annual inspection cycle as not more than four inspection procedures not completed, per Region (but not more than one procedure not done per plant).

Based on this definition, Region II did not meet the completion requirements as defined in IMC 2515 for the baseline inspection program for CY 2020. There were five instances in which all aspects of Inspection Procedure 71111.20, Refueling and Other Outage Activities, were not completed within the required frequency. Specifically, inspectors were not able to complete containment closeout walkdowns at Catawba, Hatch, McGuire, North Anna and Oconee due to the COVID-19 public health emergency. It should be noted that other portions of the IP 71111.20 were completed, subsequent containment closeout walkdowns were performed or are planned, and there were no known historical issues related to these licensees outage activities.

Therefore, risks related to the inability to conduct these walkdowns were minimal.

Reactor Program System Report 8a, which is enclosed, provides the completion status of baseline procedures for all Region II sites. Note that along with the status, some procedures have attached Notes as described in IMC 0306. In some cases, procedures are performed on a biennial or triennial frequency and were not required to be performed in CY2020. Also, in some cases, procedures were considered complete with less than the minimum samples because sufficient samples were not available for inspection. Lastly, in other cases, all requirements of the procedure were met by work done in another procedure.

RPS/IR Report 8a does not include security and safeguards inspection program status.

However, the baseline program for security and safeguards for all Region II sites was also completed for CY 2020.

If you have any questions or desire additional details, please contact the individual listed below.

Enclosure:

ROP Procedure Completion by Site (RPS/IR Report 8a)

CONTACT:

Shani Seaton, RII/DRP 404-997-4461

OFFICE RII/DRP RII/DRP RII/DRS RII/DRP NAME S. Seaton T. Inverso M. Franke M. Miller DATE 02/22/2021 02/22/2021 02/24/2021 02/25/2021

Region No: 2 Browns Ferry (BF)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

2 Complete Complete 71111.04 Equipment Alignment Annually 16 14 Complete Complete 71111.05 Fire Protection Annually 18 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 4

2 Complete Complete 71111.08G Inservice Inspection Activities (BWR)

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 22 22 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 21 18 Complete Complete 71111.18 Plant Modifications Annually 4

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 5

0 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 20 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle Page 1 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 10 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.04 Occupational Dose Assessment Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 Radiation Monitoring Instrumentation Biennial 0

17 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 9

8 Complete Complete 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Complete Complete - by reference iaw IMC 0306 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 35 35 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 6

5 Complete Complete Page 2 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Brunswick (BRU)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

2 Complete Complete 71111.04 Equipment Alignment Annually 14 14 Complete Complete 71111.05 Fire Protection Annually 23 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G Inservice Inspection Activities (BWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 20 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 27 18 Complete Complete 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 3

0 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 8

5 Complete Complete 71111.22 Surveillance Testing Annually 16 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.06 Drill Evaluation Annually 4

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle Page 3 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 10 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.04 Occupational Dose Assessment Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 Radiation Monitoring Instrumentation Biennial 0

17 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 11 9

Complete Complete 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Complete Complete - by reference iaw IMC 0306 71124.07 Radiological Environmental Monitoring Program Triennial 3

3 Complete Complete 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Complete Complete - by reference iaw IMC 0306 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 5

5 Complete Complete 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71153 Followup of Events and NOED Annually 7

5 Complete Complete Page 4 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Catawba (CAT)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 5

2 Complete Complete 71111.04 Equipment Alignment Annually 15 14 Complete Complete 71111.05 Fire Protection Annually 18 17 Complete Complete 71111.06 Flood Protection Measures Annually 2

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 10 8

Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 19 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 20 18 Complete Complete 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Incomplete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 17 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Complete Complete - by reference iaw IMC 0306 Page 5 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 11 10 Complete Complete - minimum sample not available iaw IMC 0306 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 4

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 19 17 Complete Complete 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 5

5 Complete Complete Page 6 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Farley (FAR)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

2 Complete Complete 71111.04 Equipment Alignment Annually 14 14 Complete Complete 71111.05 Fire Protection Annually 16 17 Complete Complete - minimum sample not available iaw IMC 0306 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 3

2 Complete Complete 71111.08P Inservice Inspection Activities (PWR)

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 19 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Complete Complete 71111.21M DBA (Teams)

Triennial 12 9

Complete Complete 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 15 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete - minimum sample not available iaw IMC 0306 Page 7 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 13 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 6

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 6

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 26 17 Complete Complete 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71153 Followup of Events and NOED Annually 1

5 Complete Complete - minimum sample not available iaw IMC 0306 Page 8 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Harris (HAR)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 6

2 Complete Complete 71111.04 Equipment Alignment Annually 15 14 Complete Complete 71111.05 Fire Protection Annually 21 17 Complete Complete 71111.06 Flood Protection Measures Annually 2

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 19 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Complete Complete - opportunity to apply full procedure not available iaw IMC 0306 71111.21M DBA (Teams)

Triennial 12 9

Complete Complete 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 17 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete Page 9 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 10 10 Complete Complete - minimum sample not available iaw IMC 0306 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.04 Occupational Dose Assessment Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 Radiation Monitoring Instrumentation Biennial 0

17 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 11 9

Complete Complete 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Complete Complete - by reference iaw IMC 0306 71124.07 Radiological Environmental Monitoring Program Triennial 3

3 Complete Complete 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 10 8

Complete Complete - minimum sample not available iaw IMC 0306 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Complete Complete - by reference iaw IMC 0306 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 Problem Identification and Resolution Annually 7

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 7

5 Complete Complete Page 10 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Hatch (HAT)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

2 Complete Complete 71111.04 Equipment Alignment Annually 15 14 Complete Complete 71111.05 Fire Protection Annually 19 17 Complete Complete 71111.06 Flood Protection Measures Annually 4

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08G Inservice Inspection Activities (BWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 19 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 2

0 Incomplete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 8

8 Complete Complete 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 22 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle Page 11 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 11 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.04 Occupational Dose Assessment Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 Radiation Monitoring Instrumentation Biennial 0

17 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 9

9 Complete Complete - minimum sample not available iaw IMC 0306 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Complete Complete - opportunity to apply full procedure not available iaw IMC 0306 71124.07 Radiological Environmental Monitoring Program Triennial 3

3 Complete Complete 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Complete Complete - by reference iaw IMC 0306 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 5

5 Complete Complete 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71153 Followup of Events and NOED Annually 1

5 Complete Complete - minimum sample not available iaw IMC 0306 Page 12 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 McGuire (MCG)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 3

2 Complete Complete 71111.04 Equipment Alignment Annually 14 14 Complete Complete 71111.05 Fire Protection Annually 19 17 Complete Complete 71111.06 Flood Protection Measures Annually 2

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities (PWR)

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 20 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Incomplete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 9

8 Complete Complete 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle Page 13 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 15 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 8

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 8

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 39 17 Complete Complete 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 1

5 Complete Complete - minimum sample not available iaw IMC 0306 Page 14 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 North Anna (NA)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

2 Complete Complete 71111.04 Equipment Alignment Annually 14 14 Complete Complete 71111.05 Fire Protection Annually 19 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 4

2 Complete Complete 71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 20 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 23 18 Complete Complete 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Incomplete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 16 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle Page 15 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 15 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 9

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 7

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 21 17 Complete Complete 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71153 Followup of Events and NOED Annually 1

5 Complete Complete - opportunity to apply full procedure not available iaw IMC 0306 Page 16 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Oconee (OCO)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

2 Complete Complete 71111.04 Equipment Alignment Annually 16 14 Complete Complete 71111.05 Fire Protection Annually 20 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities (PWR)

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 23 22 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Incomplete 71111.21M DBA (Teams)

Triennial 11 9

Complete Complete 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Complete Complete - by reference iaw IMC 0306 Page 17 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 14 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.04 Occupational Dose Assessment Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 Radiation Monitoring Instrumentation Biennial 0

17 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 12 9

Complete Complete 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Complete Complete - by reference iaw IMC 0306 71124.07 Radiological Environmental Monitoring Program Triennial 3

3 Complete Complete 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 10 8

Complete Complete 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Complete Complete - by reference iaw IMC 0306 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 35 35 Complete Complete 71152 Problem Identification and Resolution Annually 7

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71153 Followup of Events and NOED Annually 4

5 Complete Complete - minimum sample not available iaw IMC 0306 Page 18 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Robinson (ROB)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

2 Complete Complete 71111.04 Equipment Alignment Annually 16 14 Complete Complete 71111.05 Fire Protection Annually 21 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 15 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 24 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 9

8 Complete Complete 71111.21N.05 FPTI Triennial 8

5 Complete Complete 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle Page 19 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 10 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 6

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 6

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 22 17 Complete Complete 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 Problem Identification and Resolution Annually 8

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 1

5 Complete Complete - minimum sample not available iaw IMC 0306 Page 20 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Saint Lucie (STL)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 6

2 Complete Complete 71111.04 Equipment Alignment Annually 14 14 Complete Complete 71111.05 Fire Protection Annually 18 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 2

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 9

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 17 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 21 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 18 18 Complete Complete 71111.18 Plant Modifications Annually 4

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.06 Drill Evaluation Annually 3

3 Complete Complete Page 21 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 11 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.04 Occupational Dose Assessment Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 Radiation Monitoring Instrumentation Biennial 0

17 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Complete Complete - by reference iaw IMC 0306 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 5

5 Complete Complete 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Complete Complete - by reference iaw IMC 0306 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 2

2 Complete Complete 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Complete Complete - by reference iaw IMC 0306 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 5

5 Complete Complete 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 2

5 Complete Complete - minimum sample not available iaw IMC 0306 Page 22 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Sequoyah (SEQ)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 3

2 Complete Complete 71111.04 Equipment Alignment Annually 15 14 Complete Complete 71111.05 Fire Protection Annually 21 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 20 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 4

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 8

8 Complete Complete 71111.21N.05 FPTI Triennial 7

5 Complete Complete 71111.22 Surveillance Testing Annually 17 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle Page 23 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 11 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 5

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 22 17 Complete Complete 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 7

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71153 Followup of Events and NOED Annually 8

5 Complete Complete Page 24 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Summer (SUM)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 3

2 Complete Complete 71111.04 Equipment Alignment Annually 14 14 Complete Complete 71111.05 Fire Protection Annually 17 17 Complete Complete 71111.06 Flood Protection Measures Annually 2

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 15 15 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Complete Complete 71111.21M DBA (Teams)

Triennial 10 9

Complete Complete 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 18 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete - by reference iaw IMC 0306 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle Page 25 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 14 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 4

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 23 17 Complete Complete 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 13 13 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71153 Followup of Events and NOED Annually 5

5 Complete Complete Page 26 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Surry (SUR)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 4

2 Complete Complete 71111.04 Equipment Alignment Annually 14 14 Complete Complete 71111.05 Fire Protection Annually 18 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 3

2 Complete Complete 71111.08P Inservice Inspection Activities (PWR)

Biennial 1

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 9

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 19 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 5

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 20 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 1

0 Complete Complete 71111.21M DBA (Teams)

Triennial 14 9

Complete Complete 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 15 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle Page 27 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 15 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 5

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 4

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 23 17 Complete Complete 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 1

1 Complete Complete 71153 Followup of Events and NOED Annually 3

5 Complete Complete - opportunity to apply full procedure not available iaw IMC 0306 Page 28 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Turkey Point (TP)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 3

2 Complete Complete 71111.04 Equipment Alignment Annually 15 14 Complete Complete 71111.05 Fire Protection Annually 19 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 2

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities (PWR)

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 20 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 22 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 2

0 Complete Complete 71111.21M DBA (Teams)

Triennial 9

9 Complete Complete - minimum sample not available iaw IMC 0306 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 19 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete Page 29 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 11 10 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.04 Occupational Dose Assessment Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 Radiation Monitoring Instrumentation Biennial 0

17 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 5

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Complete Complete - by reference iaw IMC 0306 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 2

2 Complete Complete 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 9

8 Complete Complete 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Complete Complete - by reference iaw IMC 0306 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71153 Followup of Events and NOED Annually 7

5 Complete Complete Page 30 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Vogtle (VOG)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 3

2 Complete Complete - minimum sample not available iaw IMC 0306 71111.04 Equipment Alignment Annually 15 14 Complete Complete 71111.05 Fire Protection Annually 17 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 2

1 Complete Complete 71111.07T Heat Sink Performance Triennial 4

2 Complete Complete 71111.08P Inservice Inspection Activities (PWR)

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 19 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 3

0 Complete Complete 71111.21M DBA (Teams)

Triennial 1

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 8

8 Complete Complete 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 16 14 Complete Complete 71114.01 Exercise Evaluation Biennial 1

1 Complete Complete 71114.02 Alert and Notification System Testing Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.06 Drill Evaluation Annually 3

3 Complete Complete Page 31 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.08 Exercise Evaluation Scenario Review Biennial 1

1 Complete Complete 71124.01 Rad Haz Assess Exposure Controls Annually 14 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 4

4 Complete Complete 71124.04 Occupational Dose Assessment Biennial 4

4 Complete Complete 71124.05 Radiation Monitoring Instrumentation Biennial 23 17 Complete Complete 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 Radiological Environmental Monitoring Program Triennial 0

3 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 0

8 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71153 Followup of Events and NOED Annually 4

5 Complete Complete - minimum sample not available iaw IMC 0306 Page 32 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

Region No: 2 Watts Bar (WB)

Inspection Cycle: 2020 Procedure Title Frequency Sample Completed Minimum Sample Status Note 71111.01 Adverse Weather Protection Annually 3

2 Complete Complete 71111.04 Equipment Alignment Annually 14 14 Complete Complete 71111.05 Fire Protection Annually 18 17 Complete Complete 71111.06 Flood Protection Measures Annually 3

2 Complete Complete 71111.07A Heat Sink Performance Annually 1

1 Complete Complete 71111.07T Heat Sink Performance Triennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.08P Inservice Inspection Activities (PWR)

Biennial 2

1 Complete Complete 71111.11A Licensed Op Requal & Perform (Annual)

Annually 1

1 Complete Complete 71111.11B Licensed Op Requal & Perform (Biennial)

Biennial 1

1 Complete Complete 71111.11Q Licensed Op Requal & Perform (Quarterly)

Annually 8

8 Complete Complete 71111.12 Maintenance Effectiveness Annually 8

8 Complete Complete 71111.13 Maint Risk Assessments & Emer Wk Control Annually 17 14 Complete Complete 71111.15 Oper Determinations/Functionality Annually 19 19 Complete Complete 71111.17T Changes, Tests, and Experiments Triennial 0

18 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.18 Plant Modifications Annually 3

3 Complete Complete 71111.19 Post-Maintenance Testing Annually 21 20 Complete Complete 71111.20 Refueling and Other Outage Activities When required 3

0 Complete Complete 71111.21M DBA (Teams)

Triennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.21N.02 DB POV Under 10 CFR 50.55a Triennial 9

8 Complete Complete 71111.21N.05 FPTI Triennial 0

5 Not Applicable Not Applicable - completion not required during this inspection cycle 71111.22 Surveillance Testing Annually 19 14 Complete Complete 71114.01 Exercise Evaluation Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71114.02 Alert and Notification System Testing Biennial 1

1 Complete Complete 71114.03 Emergency Response Organizational Staffing/Augmentation Biennial 1

1 Complete Complete 71114.04 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 1

1 Complete Complete 71114.05 Maintenance of EP Biennial 1

1 Complete Complete 71114.06 Drill Evaluation Annually 3

3 Complete Complete 71114.07 Exercise Evaluation -Hostile Action (HA)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle Page 33 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a

71114.08 Exercise Evaluation Scenario Review Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.01 Rad Haz Assess Exposure Controls Annually 14 10 Complete Complete 71124.02 Occupational ALARA Biennial 0

9 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.03 Airborne Radioactivity Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.04 Occupational Dose Assessment Biennial 0

4 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 Radiation Monitoring Instrumentation Biennial 0

17 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.05 - 2019 2019 Radiation Monitoring Instrumentation Biennial 0

2 Not Applicable Not Applicable - completion not required during this inspection cycle 71124.06 Radioactive Gaseous and Liquid Effluent Treatment Triennial 13 9

Complete Complete 71124.06 - 2019 2019 Rad Gas & Liquid Treatment Biennial 0

5 Complete Complete - by reference iaw IMC 0306 71124.07 Radiological Environmental Monitoring Program Triennial 3

3 Complete Complete 71124.07 - 2019 2019 Radiological Environmental Monitoring Program Biennial 0

2 Complete Complete - by reference iaw IMC 0306 71124.08 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Biennial 7

8 Complete Complete - minimum sample not available iaw IMC 0306 71124.08 - 2019 2019 Solid Waste Proc, Handling, Stor, Transp Biennial 0

5 Complete Complete - by reference iaw IMC 0306 71151 Performance Indicator Verification Annually 3

3 Complete Complete 71151 Performance Indicator Verification Annually 24 24 Complete Complete 71152 Problem Identification and Resolution Annually 6

6 Complete Complete 71152B Problem Identification and Resolution (Biennial)

Biennial 0

1 Not Applicable Not Applicable - completion not required during this inspection cycle 71153 Followup of Events and NOED Annually 7

5 Complete Complete - by reference iaw IMC 0306 Page 34 of 34 2/12/2021 11:16:09 AM Note: Biennial samples completed are the total of 2020 and 2021. Triennial samples completed are the total between 2020 and 2022.

Baseline Inspection Completion By Site IR Report 8a