Similar Documents at Perry |
---|
Category:Letter type:L
MONTHYEARL-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report L-24-083, Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification2024-04-15015 April 2024 Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification L-24-066, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency2024-04-15015 April 2024 Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency L-24-057, Submittal of the Decommissioning Funding Status Report2024-03-28028 March 2024 Submittal of the Decommissioning Funding Status Report L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage L-24-076, Independent Spent Fuel Storage Installation - Supplemental Information for Request for Specific Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142024-03-22022 March 2024 Independent Spent Fuel Storage Installation - Supplemental Information for Request for Specific Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 L-24-053, Independent Spent Fuel Storage Installation, Request for Specific Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142024-02-27027 February 2024 Independent Spent Fuel Storage Installation, Request for Specific Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 2024-09-09
[Table view] Category:Technical Specification
MONTHYEARL-23-052, Enclosure C - PNPP Technical Specification Bases, Revision 182023-10-27027 October 2023 Enclosure C - PNPP Technical Specification Bases, Revision 18 L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21307A2072021-10-28028 October 2021 2 to Updated Safety Analysis Report, Revision 13 Technical Specifications Bases TS Bases L-21-176, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-10-19019 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-20-185, License Amendment Request for Adoption of Tech Spec Task Force Traveler TSTF-230 Rev. 12021-02-17017 February 2021 License Amendment Request for Adoption of Tech Spec Task Force Traveler TSTF-230 Rev. 1 L-21-053, Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-02-0202 February 2021 Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-20-291, Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602020-11-19019 November 2020 Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-19-274, License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-3602020-04-24024 April 2020 License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-360 L-19-213, Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR2019-12-18018 December 2019 Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR L-18-174, Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control2018-07-24024 July 2018 Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control L-17-247, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602017-12-20020 December 2017 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control.2017-12-0606 December 2017 Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. ML17305A2382017-10-23023 October 2017 Technical Specification Bases, Rev. 11 L-17-108, Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules2017-08-11011 August 2017 Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules L-17-042, Request for Licensing Action to Revise the Technical Specifications2017-06-0808 June 2017 Request for Licensing Action to Revise the Technical Specifications L-15-235, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-4252015-08-24024 August 2015 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-425 L-12-064, Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process2012-02-22022 February 2012 Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process L-11-038, License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation2011-04-12012 April 2011 License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 12010-12-15015 December 2010 License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 L-09-218, Submittal of Technical Specification Bases, Revision 72009-10-0505 October 2009 Submittal of Technical Specification Bases, Revision 7 L-09-031, Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control2009-03-11011 March 2009 Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control ML0906306722009-03-0909 March 2009 Enclosure 14: Case Study 10: Perry Inability to Follow the RHR-SDC Required - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf L-08-325, License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 4972008-11-18018 November 2008 License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497 ML0729102222007-10-12012 October 2007 Submittal of Technical Specification Bases, Revision 6 ML0711401262007-04-19019 April 2007 Technical Specification Pages, Deleting License Condition 2.F ML0630502502006-10-27027 October 2006 Issuance of Technical Specification Page Clarify Wording of Emergency Closed Cooling Water SR 3.7.10.2 ML0616700762006-06-0606 June 2006 License Amendment Requests to Revise Technical Specification 5.5.7, Ventilation Filter Test Program to Correct Referenced Flow Units ML0519402052005-07-0505 July 2005 License Amendment Request Pursuant to 10CFR50.90: Revision of Technical Specification Surveillance Requirement 3.3.1.3.5 Which Revises the Enabled Region for the Oscillation Power Range Monitors ML0500700132005-01-0606 January 2005 Tech Spec Pages for Amendment 131 Regarding Increase Flexibility in Mode Restraint ML0425300872004-08-31031 August 2004 License Amendment Request Pursuant to 1OCFR50.90: Revision of Technical Specification 3.4.1, 'Recirculation Loops Operating Associated with Single Recirculation Loop Operation ML0411701652004-04-23023 April 2004 Technical Specifications, Approve Administrative Procedures and Offsite Dose Calculation Manual ML0432202062004-04-0505 April 2004 License Amendment Request Pursuant to 10CFR50.90: Revision of the Minimum Critical Power Ratio Safety Limit ML0312200312003-04-29029 April 2003 Issuance of Amendment, Technical Specifications ML0309808202003-04-0808 April 2003 Issuance of Amendment, Technical Specification Page RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing2003-03-14014 March 2003 Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing ML0231004072002-10-30030 October 2002 License Amendment Request Pursuant to 10 CFR 50.90: Elimination of Requirements for Post Accident Sampling System Using Consolidated Line Item Improvement Process 2023-06-05
[Table view] Category:Bases Change
MONTHYEARL-23-052, Enclosure C - PNPP Technical Specification Bases, Revision 182023-10-27027 October 2023 Enclosure C - PNPP Technical Specification Bases, Revision 18 L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21307A2072021-10-28028 October 2021 2 to Updated Safety Analysis Report, Revision 13 Technical Specifications Bases TS Bases L-20-185, License Amendment Request for Adoption of Tech Spec Task Force Traveler TSTF-230 Rev. 12021-02-17017 February 2021 License Amendment Request for Adoption of Tech Spec Task Force Traveler TSTF-230 Rev. 1 L-21-053, Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-02-0202 February 2021 Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-20-291, Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602020-11-19019 November 2020 Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-19-213, Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR2019-12-18018 December 2019 Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control.2017-12-0606 December 2017 Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. ML17305A2382017-10-23023 October 2017 Technical Specification Bases, Rev. 11 L-12-064, Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process2012-02-22022 February 2012 Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process L-11-038, License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation2011-04-12012 April 2011 License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 12010-12-15015 December 2010 License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 L-09-218, Submittal of Technical Specification Bases, Revision 72009-10-0505 October 2009 Submittal of Technical Specification Bases, Revision 7 ML0906306722009-03-0909 March 2009 Enclosure 14: Case Study 10: Perry Inability to Follow the RHR-SDC Required - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf L-08-325, License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 4972008-11-18018 November 2008 License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497 ML0729102222007-10-12012 October 2007 Submittal of Technical Specification Bases, Revision 6 ML0519402052005-07-0505 July 2005 License Amendment Request Pursuant to 10CFR50.90: Revision of Technical Specification Surveillance Requirement 3.3.1.3.5 Which Revises the Enabled Region for the Oscillation Power Range Monitors ML0425300872004-08-31031 August 2004 License Amendment Request Pursuant to 1OCFR50.90: Revision of Technical Specification 3.4.1, 'Recirculation Loops Operating Associated with Single Recirculation Loop Operation 2023-06-05
[Table view] |
Text
Energy Harbor Nuclear Corp.
Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 44081 Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear February 17, 2021 L-20-185 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-230 Rev.1, Add new Condition B to LCO 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling.
Pursuant to 10 CFR 50.90, Energy Harbor Nuclear Corp. is requesting an amendment to the Perry Nuclear Power Plant Technical Specifications (TSs). The proposed license amendment would add new Condition B to LCO 3.6.2.3 Residual Heat Removal (RHR)
Suppression Pool Cooling, to allow two RHR Suppression Pool Cooling subsystems to be inoperable for eight hours.
An evaluation of the proposed amendment is enclosed. Energy Harbor Nuclear Corp. is requesting NRC staff approval by February 28, 2022, and an implementation period of 120 days following issuance of the amendment.
There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager - Fleet Licensing, at (330) 696-7208.
Perry Nuclear Power Plant L-20 -185 Page2 I declare under penalty of perjury that the foregoing is true and correct. Executed on February J.]_, 2021.
Enclosure:
Evaluation of Proposed License Amendment cc: NRC Region Ill Administrator NRC Resident Inspector NRC Project Manager Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)
Utility Radiological Safety Board
EVALUATION OF PROPOSED LICENSE AMENDMENT Page 1 of 7
Subject:
License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-230 Rev.1, Add new Condition B to LCO 3.6.2.3, Residual Heat Removal (RHR) Suppression Pool Cooling
- 1.
SUMMARY
DESCRIPTION
- 2. DETAILED DESCRIPTION 2.1 System Design and Operation 2.2 Current Technical Specifications Requirements 2.3 Reason for the Proposed Change 2.4 Description of the Proposed Change
- 3. TECHNICAL EVALUATION
- 4. REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 No Significant Hazards Consideration Analysis 4.4 Conclusion
- 5. ENVIRONMENTAL CONSIDERATION
- 6. REFERENCES ATTACHMENTS:
- 1. Technical Specification Page Markup
- 2. TS Bases Page Markup (for information only)
Evaluation of Proposed License Amendment Perry Nuclear Power Plant Page 2 of 7
- 1.
SUMMARY
DESCRIPTION Limiting Condition for Operation (LCO) 3.6.2.3, Residual Heat Removal (RHR)
Suppression Pool Cooling, is revised to add a new ACTION (ACTION B) to allow two RHR suppression pool cooling subsystems to be inoperable for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Due to this change, the second part of existing CONDITION B is deleted, and the entire ACTION B is renumbered as ACTION C. This change is considered to be less restrictive than current requirements. provides the existing Technical Specification (TS) pages marked to indicate the proposed amendment. Attachment 2 provides the existing TS Bases pages annotated to indicate the proposed changes and is provided for information only.
- 2. DETAILED DESCRIPTION 2.1. System Design and Operation The RHR system consists of three motor-driven pumps, four heat exchangers, and the valves and piping necessary to support operations. These components are divided into three independent closed loops, A, B, and C. All loops contain a motor-driven pump and the necessary valves and piping. Only loops A and B, however, contain heat exchangers. Emergency service water (ESW) is used as the cooling medium for the RHR heat exchangers. Each RHR subsystem contains a flow path capable of recirculating water from the suppression pool through the RHR heat exchanger and is manually initiated and independently controlled.
During normal plant operation, the suppression pool water must be kept less than 95 degrees Fahrenheit (°F) to ensure adequate condensation of the steam resulting from a design basis loss of cooling accident (LOCA) to prevent over pressurizing the containment. The suppression pool cooling mode is used to maintain proper suppression pool temperature during reactor core isolation cooling (RCIC) or safety relief valve operation, and to reduce suppression pool temperature in accident conditions. Both RHR loops A and B can be used for this mode. The two RHR subsystems perform suppression pool cooling function by circulating water from the suppression pool through the RHR heat exchangers and returning it to the suppression pool. ESW circulating through the tube side of the heat exchangers, exchanges heat with the suppression pool water and discharges this heat to the external heat sink.
The heat removal capability of one RHR subsystem is sufficient to meet the overall design basis accident (DBA) pool cooling requirement to limit peak temperature to 185°F for LOCAs and transient events such as a turbine trip without bypass or a stuck open safety relief valve (SRV). SRV leakage and RCIC system testing increase suppression pool temperature more slowly. The RHR suppression pool cooling system is also used to lower the suppression pool average water temperature following such events.
Evaluation of Proposed License Amendment Perry Nuclear Power Plant Page 3 of 7 2.2. Current Technical Specification Requirements TS 3.6.2.3, Residual Heat Removal (RHR) Suppression Pool Cooling System, requires two RHR suppression pool cooling subsystems to be OPERABLE in Modes 1,2, and 3.
The required action for one RHR suppression pool cooling subsystem inoperable (Condition A) of TS 3.6.2.3, requires the operators to restore the RHR suppression pool cooling subsystem to OPERABLE status within 7 days (Required Action A.1).
The required actions and associated completion time of Condition A not met or two RHR suppression pool cooling subsystems inoperable (Condition B) of TS 3.6.2.3, requires the unit to be in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (Required Action B.1) and be in Mode 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (Required Action B.2).
2.3. Reason for the Proposed Change Per the current TS 3.6.2.3, the action and completion time for two RHR suppression pool cooling subsystems inoperable (Condition B) requires the unit to be in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and be in Mode 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The immediate plant shutdown (which is what is currently required) has the potential for resulting in a unit scram and discharge of steam to the suppression pool, when both suppression pool cooling subsystems are inoperable and incapable of removing the generated heat.
2.4. Description of the Proposed Change The proposed change will revise TS 3.6.2.3, Residual Heat Removal (RHR)
Suppression Pool Cooling. This change proposes a new Condition B when two RHR suppression pool cooling subsystems are inoperable. The new Required Action B.1 requires operators to restore one RHR suppression pool cooling subsystem to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Current Condition B and its required actions were renamed C, C.1, and C.2, respectively since new condition B was added. New Condition C is applicable to current Condition A and new Condition B. Required Action C.1 requires the unit to be in MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and Required Action C.2 requires the unit to be in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
- 3. TECHNICAL EVALUATION Following a DBA, the RHR suppression pool cooling system removes heat from the suppression pool. The suppression pool is designed to absorb the sudden input of heat from the primary system. In the long term, the pool continues to absorb residual heat generated by fuel in the reactor core. The capability to remove heat from the
Evaluation of Proposed License Amendment Perry Nuclear Power Plant Page 4 of 7 suppression pool must be provided in order to maintain the temperature inside the primary containment within design limits.
The current TS requires a unit shutdown in the event both RHR suppression pool cooling subsystems become inoperable. This change would allow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore one RHR suppression pool cooling subsystem to OPERABLE status before initiating a unit shutdown. The proposed 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> limit is considered appropriate since an immediate plant shutdown, which is currently required, has the potential to result in a unit scram and discharge of steam to the suppression pool. With both suppression pool cooling subsystems inoperable, there would be no available means to remove heat from the suppression pool. The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> limit provides time to restore one of the subsystems prior to requiring the unit to shut down yet is short enough that it does not significantly increase the time that the subsystems would be unavailable in the event of an accident.
This proposed change also serves to provide consistency between the requirements for RHR suppression pool cooling and LCO 3.6.1.7, Residual Heat Removal (RHR)
Containment Spray System, required action B.1 which currently allows 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore one containment spray subsystem OPERABLE status.
This proposed change is consistent with TSTF-230, Revision 1.
- 4. REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria The following regulatory requirements and criteria were reviewed during development of the proposed license amendment:
- 10 CFR 50.36, Technical Specifications Energy Harbor Nuclear Corp. has determined that the proposed amendment is consistent with the regulatory requirements and criteria described in the above cited documents.
4.2 Precedent TSTF-230 has previously been approved for incorporation in the TS for River Bend Station, Unit 1, by license amendment dated August 11, 2009 (Reference 2).
4.3 No Significant Hazards Consideration Analysis TSTF-230 modifies LCO 3.6.2.3 to be less restrictive. However, the LCO continues to assure that the necessary quality of systems and components is maintained, and that facility operation will be within safety limits. Therefore, the proposed less restrictive
Evaluation of Proposed License Amendment Perry Nuclear Power Plant Page 5 of 7 change still affords adequate assurance of safety when judged against current regulatory standards.
Energy Harbor Nuclear Corp. has evaluated if a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change relaxes the Required Actions of LCO 3.6.2.3 by allowing 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to restore one RHR suppression pool cooling subsystem to OPERABLE status when both subsystems have been determined to be inoperable. Required Actions and their associated Completion Times are not initiating conditions for any accident previously evaluated. The proposed 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time provides time to restore required subsystem(s) to OPERABLE status yet is short enough that operating an additional 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is not a significant risk. The Required Actions in the proposed change have been developed to provide assurance that appropriate remedial actions are taken in response to the degraded condition, considering the operability status of the RHR suppression pool cooling system and the capability of minimizing the risk associated with continued operation. As a result, neither the probability nor the consequences of any accident previously evaluated are significantly increased.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed change does not involve a physical modification or alteration of plant equipment (no new or different type of equipment will be installed) or a change in the methods governing normal plant operation. The Required Actions and associated Completion Times in the proposed change have been evaluated to ensure that no new accident initiators are introduced.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Evaluation of Proposed License Amendment Perry Nuclear Power Plant Page 6 of 7 Response: No The relaxed Required Actions do not involve a significant reduction in a margin of safety. The proposed change has been evaluated to minimize the risk of continued operation with both RHR suppression pool cooling subsystems inoperable. The operability status of the RHR suppression pool cooling system, a reasonable time for repair or replacement of required features, and the low probability of a design basis accident occurring during the repair period have been considered in the evaluation.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, Energy Harbor Nuclear Corp. concludes that the proposed amendment does not involve a no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
4.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or a significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
Evaluation of Proposed License Amendment Perry Nuclear Power Plant Page 7 of 7
6.0 REFERENCES
- 1. Final Safety Evaluation of TSTF-230, Revision 1, "Add new Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling, June 15, 1999 (ADAMS Accession No. ML040570110)
- 2. River Bend Station, Unit 1, License Amendment No.165, Modify Technical Specifications to Adopt NRC-approved Generic Changes TS Task Force (TSTF)-
163, TSTF-220, TSTF-230, and TSTF-306, August 11, 2009 (ADAMS Accession No. ML092010370)
Attachment 1 Evaluation of Proposed License Amendment Proposed Technical Specification Page Markup (1 page follows)
RHR Suppression Pool Cooling System 3.6.2.3 3.6 CONTAINMENT SYSTEMS 3.6.2.3 Residual Heat Removal (RHR) Suppression Pool Cooling System LCO 3.6.2.3 Two RHR suppression pool cooling subsystems shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR suppression A.1 Restore RHR suppression 7 days pool cooling subsystem pool cooling subsystem to inoperable. OPERABLE status.
B. Two RHR suppression B.1 Restore one RHR 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> pool cooling subsystems suppression pool cooling inoperable. subsystem to OPERABLE status.
CB. Required Action and CB.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not AND met.
CB.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Two RHR suppression pool cooling subsystems inoperable.
PERRY - UNIT 1 3.6-40 Amendment No. 69
Attachment 2 Evaluation of Proposed License Amendment Technical Specification Bases Page Mark-Up (for information only)
(1 page follows)
RHR Suppression Pool Cooling System FOR INFORMATION ONLY B 3.6.2.3 BASES ACTIONS B.1 (continued)
With two RHR suppression pool cooling subsystems inoperable, one subsystem must be restored to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. In this condition, there is a substantial loss of the primary containment pressure and temperature mitigation function. The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time is based on this loss of function and is considered acceptable due to the low probability of a DBA and the potential avoidance of a plant shutdown transient that could result in the need for the RHR suppression pool cooling subsystems to operate.
CB.1 and CB.2 If the Required Action and associated Completion Time of Condition A cannot be met or if two RHR suppression pool cooling subsystems are inoperable, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.6.2.3.1 REQUIREMENTS Verifying the correct alignment for manual, power operated, and automatic valves, in the RHR suppression pool cooling mode flow path provides assurance that the proper flow path exists for system operation.
This SR does not apply to valves that are locked, sealed, or otherwise secured in position since these valves were verified to be in the correct position prior to being locked, sealed, or secured. A valve that receives an initiation signal is allowed to be in the nonaccident position, provided the valve will automatically reposition in the proper stroke time. This is acceptable, since the RHR suppression pool cooling mode is manually initiated. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
(continued)
PERRY - UNIT 1 B 3.6-81 Revision No. 11