Letter Sequence Request |
|---|
EPID:L-2020-LLA-0164, Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML20255A218, ML20255A239, ML20255A242, ML20255A253, ML20255A257, ML20258A071, ML20258A087, ML20258A088, ML20258A091, ML20258A092, ML21084A255, ML21091A147, ML21160A057, ML21160A085
|
MONTHYEARML20255A2182018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2392018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2422018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2532018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 12, Radiation Protection (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0922019-09-11011 September 2019 11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0912019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 12 - Radiation Protection (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0882019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0872019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0712019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted Project stage: Other W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request ML20239B0552020-08-26026 August 2020 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford U3 Digital Upgrade LAR Project stage: Acceptance Review ML20288A7292020-09-22022 September 2020 Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 Project stage: Request ML20289A2672020-09-22022 September 2020, 22 October 2020 Summary of September 22, 2020, Category 1 Public Meeting Di&C License Amendment Request Project stage: Request ML20265A2872020-10-0101 October 2020 Request for Withholding Information from Public Disclosure Submittals for a Digital Upgrade Project stage: Withholding Request Acceptance ML20268B3242020-10-0101 October 2020 Regulatory Audit in Support of Review of Digital Upgrade License Amendment Request Project stage: Approval PMNS20201184, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-0707 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting ML20288A7422020-10-22022 October 2020 Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) Project stage: Meeting PMNS20201234, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting PMNS20201233, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting PMNS20201232, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting PMNS20201195, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting ML20315A2672020-12-17017 December 2020 Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) Project stage: Meeting ML20325A3212020-12-17017 December 2020 Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) Project stage: Meeting ML20325A2412020-12-17017 December 2020 Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes Project stage: Meeting W3F1-2021-0002, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-22022 January 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-29029 January 2021 Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request PMNS20201419, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32021-02-0505 February 2021 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting ML21032A0132021-02-19019 February 2021 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station Project stage: Meeting ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 Project stage: Meeting W3F1-2021-0025, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-03-0505 March 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0026, Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-03-19019 March 2021 Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request ML21084A2552021-03-22022 March 2021 NRR E-mail Capture - Supplement to Audit Plan Dated October 1, 2020 (Waterford 3, L-2020-LLA-0164) Project stage: Other ML21071A2862021-04-0101 April 2021 Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY Project stage: Meeting ML21091A1472021-04-0101 April 2021 Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to Project stage: Other ML21075A0322021-04-0202 April 2021 Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes Project stage: Meeting ML21095A1932021-04-0707 April 2021 Request for Withholding Information from Public Disclosure, Project stage: Withholding Request Acceptance ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non Project stage: Meeting ML21090A0022021-04-12012 April 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21112A2542021-04-29029 April 2021 Request for Additional Information Digital Upgrade to the Core Protection and Control Element Assembly Calculator System (EPID L 2020 Lla 0164) - Redacted Version Project stage: RAI ML21112A2492021-05-0707 May 2021 Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro Project stage: Meeting W3F1-2021-0032, Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-05-21021 May 2021 Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0041, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator System2021-06-0202 June 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator System Project stage: Request ML21160A0852021-06-0404 June 2021 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Louisiana Regarding a Waterford Steam Electric Station, Unit 3 Amendment - Digital Upgrade I&C Project stage: Other W3F1-2021-0047, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-06-21021 June 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0051, Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator2021-07-19019 July 2021 Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator Project stage: Request W3F1-2021-0054, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 20202021-07-29029 July 2021 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020 Project stage: Request ML21203A3532021-08-0909 August 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21160A0572021-08-16016 August 2021 Summary of Regulatory Audit in Support of Digital Upgrade License Amendment Request (EPID L-2020-LLA-0164)Non-Proprietary Project stage: Other ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System Project stage: Approval 2021-03-22
[Table View] |
Text
Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5138 Ron Gaston Director, Nuclear Licensing Proprietary Information - Withhold from Public Disclosure Under 10 CFR 2.390 The balance of this letter may be considered non-proprietary upon removal of Enclosures 1 and 2.
10 CFR 50.90 W3F1-2021-0002 January 22, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (CEAC) System Waterford Steam Electric Station, Unit 3 NRC Docket No. 50-382 Renewed Facility Operating License No. NPF-38
References:
- 1)
Entergy Operations, Inc. letter to U.S. Nuclear Regulatory Commission (NRC), "License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) system and Control Element Assembly Calculator (CEAC) system," dated July 23, 2020, (ADAMS Accession No. ML20205L587)
- 2)
NRC Meeting Summary, "Summary Of September 22, 2020, Category 1 Public Meeting With Entergy Operations, Inc. Regarding License Amendment Request To Install Digital Upgrade In Accordance With Digital Instrumentation And Control Interim Staff Guidance No. 06, Revision 2,
'Licensing Processes' (EPID L-2020-LLA-0164)," dated October 22, 2020, (ML20288A742)
In Reference 1, Entergy Operations, Inc. (Entergy) submitted a proposed amendment to Appendix A, "Technical Specifications" (TS) of Renewed Facility Operating License No. NPF-38 for Waterford Steam Electric Station, Unit 3 (Waterford). The proposed change would revise the Waterford TS in order to implement a planned digital instrumentation and control (DI&C) modification at Waterford. The DI&C modification will replace the existing digital minicomputers of the Core Protection Calculator (CPC) system and Control Element Assembly Calculator (CEAC) system with the more reliable, digital system based on the Westinghouse Electric Company (Westinghouse) Common Qualified (Common Q) Platform.
W3F1-2021-0002 Page 2 of 3 On September 22, 2020, the NRC conducted a virtual Category 1 public meeting with representatives from Entergy and Westinghouse Electric Company, LLC. (Westinghouse). The purpose of the meeting was to discuss Entergys license amendment request (Reference 1).
The results of that meeting are summarized in Reference 2.
During the meeting, as summarized in Reference 2, the NRC discussed a proposed process for dispositioning open items (OIs). The OIs are NRC questions regarding the LAR which the NRC would track and eventually disposition as requests for additional information, requests for confirmation of information, audits, or as needing no additional action. The OI list is an informal tool for increasing the efficiency of the NRC review, as well as promoting communication with Entergy. Enclosure 5 of the Reference 2 meeting summary provided a non-proprietary version of preliminary OIs. Enclosures 1 and 2 to this letter provide additional design documents concerning two of the OIs (i.e., OI No. 17 and OI No. 25).
Enclosures 1 and 2 contain information proprietary to Westinghouse and are supported by an Affidavit signed by Westinghouse, the owner of the information. The Affidavit is provided as, and sets forth the basis on which the information may be withheld from public disclosure by the NRC and addresses, with specificity, the considerations listed in paragraph (b)(4) of Section 2.390 of the Commissions regulations. Accordingly, Entergy respectfully requests that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commissions regulations.
Correspondence with respect to the copyright or proprietary aspects of Enclosures 1 and 2, or the supporting Westinghouse Affidavit should reference CAW-20-5117 and should be addressed to Zachary S. Harper, Manager, Licensing Engineering, Westinghouse Electric Company, 1000 Westinghouse Drive, Suite 165, Cranberry Township, Pennsylvania 16066.:
provides Westinghouse Specification WNA-DS-04517-CWTR3, Revision 5, System Requirements Specification for the Core Protection Calculator System. This attachment contains information proprietary to Westinghouse and is supported by an Affidavit signed by Westinghouse, the owner of the information.
provides Westinghouse Specification EQ-QR-412-CWTR3, Revision 1, Core Protection Calculator System Upgrade Project Equipment Qualification Summary Report for Waterford Unit 3. This attachment contains information proprietary to Westinghouse and is supported by an Affidavit signed by Westinghouse, the owner of the information. Due to ongoing review and refinement of engineering analyses associated with EQ-QR-412-CWTR3, Revision 1, Entergy anticipates that this specification will be revised again. Entergy plans to complete this revision in April 2021.
provides Westinghouse Affidavit CAW-20-5117 in support of Enclosures 1 and 2. The Affidavit sets forth the basis on which the information may be withheld from public disclosure by the NRC and addresses, with specificity, the considerations listed in paragraph (b)(4) of Section 2.390 of the Commission's regulations.
The No Significant Hazards Consideration determination provided in the Reference 1 submittal is not altered by the information provided in this letter.
W3F1-2021-0002 Page 3 of 3 There are no new regulatory commitments included in this letter.
In accordance with 10 CFR 50.91(b)(1), "Notice for public comment; State consultation," a copy of this letter, without the proprietary attachments, is being provided to the designated State Official.
Should you have any questions or require additional information, please contact Paul Wood, Regulatory Assurance Manager, Waterford, at (504) 464-3786 or pwood1@entergy.com.
I declare under penalty of perjury, that the foregoing is true and correct. Executed on January 21, 2021.
Respectfully, Ron Gaston RWG/jls
Enclosures:
- 1.
Westinghouse Specification WNA-DS-04517-CWTR3, Revision 5, System Requirements Specification for the Core Protection Calculator System, Proprietary
- 2.
Westinghouse Specification EQ-QR-412-CWTR3, Revision 1, Core Protection Calculator System Upgrade Project Equipment Qualification Summary Report for Waterford Unit 3, Proprietary
- 3.
Westinghouse Affidavit CAW-20-5117, Proprietary Information Notice, and Copyright in support of WNA-DS-04517-CWTR3, Revision 5 and EQ-QR-412-CWTR3, Revision 1, (Enclosures 1 and 2) cc:
NRC Region IV Regional Administrator NRC Senior Resident Inspector - Waterford Steam Electric Station, Unit 3 Louisiana Department of Environmental Quality NRC Project Manager Waterford Steam Electric Station, Unit 3
$%&'"(
W3F1-2021-0002 Westinghouse Affidavit CAW-20-5117, Proprietary Information Notice, and Copyright in support of WNA-DS-04517-CWTR3, Revision 5 and EQ-QR-412-CWTR3, Revision 1 (Enclosures 1 and 2)
Westinghouse Non-Proprietary Class 3 CAW-20-5117 Page 1 of 3 COMMONWEALTH OF PENNSYLVANIA:
COUNTY OF BUTLER:
(1)
I, Zachary S. Harper, have been specifically delegated and authorized to apply for withholding and execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse).
(2)
I am requesting the proprietary portions of EQ-QR-412-CWTR3, Revision 1 and WNA-DS-04517-CWTR3, Revision 5 be withheld from public disclosure under 10 CFR 2.390.
(3)
I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged, or as confidential commercial or financial information.
(4)
Pursuant to 10 CFR 2.390, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i)
The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse and is not customarily disclosed to the public.
(ii)
The information sought to be withheld is being transmitted to the Commission in confidence and, to Westinghouses knowledge, is not available in public sources.
(iii)
Westinghouse notes that a showing of substantial harm is no longer an applicable criterion for analyzing whether a document should be withheld from public disclosure. Nevertheless, public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation justifications and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable
- This record was final approved on 12/10/2020 1:03:50 PM. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3 CAW-20-5117 Page 2 of 3 others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
(5)
Westinghouse has policies in place to identify proprietary information. Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a)
The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b)
It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage (e.g., by optimization or improved marketability).
(c)
Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d)
It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e)
It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f)
It contains patentable ideas, for which patent protection may be desirable.
- This record was final approved on 12/10/2020 1:03:50 PM. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3 CAW-20-5117 Page 3 of3 (6)
The attached submittal contains proprietary information throughout, for the reasons set forth in Sections S(a) and (c) of this Affidavit. Accordingly, a redacted version would be of no value to the public.
I declare that the averments of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief.
I declare under penalty of perjury that the foregoing is true and correct.
Licensing Engineering
- This record was final approved on 12/10/2020 1:03:50 PM. (This statement was added by the PRIME system upon its validation)