ML20322A452

From kanterella
Jump to navigation Jump to search

Notice of Meeting with Framatome, Inc. to Discuss the Pre-Application for the Model Nos. MAP-12 and MAP-13 Packages
ML20322A452
Person / Time
Site: 07109319
Issue date: 11/17/2020
From: Pierre Saverot
Division of Fuel Management
To: Flanagan B
Framatome
Saverot P, 301-415-7505
References
EPID L-2020-LLA-0247
Download: ML20322A452 (3)


Text

Enclosure UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 17, 2020 MEETING NOTICE Organization:

FRAMATOME INC.

Date:

December 7, 2020 1:00 p.m. - 2:30 p.m. (EST)

Location:

By Videoconference

Purpose:

Pre-Application Meeting for the Model Nos. MAP-12 and MAP-13 Packages (agenda enclosed).

Participants:

NRC/NMSS/STLB Framatome, Inc.

Pierre Saverot, et al.

Bryan Flanagan, et al.

Meeting Category:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. The NRCs Policy Statement, Enhancing Public Participation on NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

If you need the meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meeting contact.

Contact:

Pierre Saverot pierre.saverot@nrc.gov Please contact Pierre Saverot to receive the information to join the meeting via teleconference.

Docket No.:

71-9319 EPID:

L-2020-LLA-0247

Enclosure:

Agenda

ML20322A452

  • concurrence via email OFFICE NMSS/DFM E

NMSS/DFM NAME PSaverot WWheatley*

DATE 11/17/2020 11/17/2020

Enclosure AGENDA Meeting between Framatome Inc. and the Nuclear Regulatory Commission December 7, 2020 1:00 p.m. - 2:30 p.m.

1.

==

Introduction:==

Framatome Inc. Team.

2.

Meeting Objectives and Project Description.

3.

Contents above 5% U235 enrichment.

4.

17x17 Type 3 Fuel Assembly Details.

5.

Criticality Evaluation.

5.1 Methods of Analysis.

5.2 Benchmarking.

5.3 Preliminary results.

6.

Structural Evaluation: Type 3 Fuel Assembly Discussion.

7.

Thermal, Containment, and Shielding Discussions.

8.

Proposed Schedule.

9.

Opportunity for Public Comment.

10.

Conclusion.