Crystal River 3 1Q/2000 Performance Summary Page 1 of 2 1Q/2000 - Crystal River 3
Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 1Q/2000 - Crystal River 3 Initiating Events 1012000!=.:
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings Miscellaneous findings Addition a I I nsp e cti on & Assessment Info rm ati on I Nofndllngs ttis..-ter
+ List of Inspection Reports Safeguards Physical Protection No'lh:tlgs ttis~
+ Assessment Rep o rts/1 nsp e cti on PI ans:
10/2000
+ List of Assessment Letters/I nsp e cti on PI ans
+ Cross Reference Of Assessment Reports Last Modified: April 1, 2002
Crystal River 3 2Q/2000 Performance Summary Page 1 of 2 2Q/2000 - Crystal River 3
Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 2Q/2000 - Crystal River 3 Initiating Events 2012000!=.:
10!20001~=
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings I
No fi"ldilgs this IJB'ter" Miscellaneous findings I Nofndllngs ttis..-ter 1 No fildirgs thls~r Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguards Physical Protection No'lh:tlgs ttis~
+ Assessment Rep o rts/1 nsp e cti on PI ans:
20/2000
+ List of Assessment Letters/I nsp e cti on PI ans 10/2000
+ Cross Reference Of Assessment Reports Last Modified: April 1, 2002
Crystal River 3 3Q/2000 Performance Summary Page 1 of 2 3Q/2000 - Crystal River 3
Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 3Q/2000 - Crystal River 3 Initiating Events 30!20001=-=
20!20001~=
1oi2oool=.=
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings 1=-=
1:s:
1=-=
I No'ltldngs this..-ter I
No fi"ldilgs this IJB'ter" I No'ltldngs thls..-ter Miscellaneous findings I
Nofndllngs ttis..-ter I No1nrgs this CJ.Brier I
No fildirgs thls~r I
No1na"Qs this IJ,larblr I
Nofndllngs thls..-mr Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguards Physical Protection
+ Assessment Rep o rts/1 nsp e cti on PI ans:
30/2000
+ List of Assessment Letters/I nsp e cti on PI ans 20/2000 10/2000
+ Cross Reference Of Assessment Reports Last Modified: March 29, 2002
Crystal River 3 4Q/2000 Performance Summary Page 1 of 2 4Q/2000 - Crystal River 3 Initiating Events Inspection Findings y
Current Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
~ Mitigating...
Barrier Emergency Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators y
Safeguards Physical Protection last Modified: April 8, 2002 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 1lpp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 4Q/2000 - Crystal River 3
Crystal River 3 1Q/2001 Performance Summary Page 1 of 2 1Q/2001 - Crystal River 3 Initiating Events Inspection Findings y
Current Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
~ Mitigating...
Barrier Emergency Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators y
Safeguards Physical Protection last Modified: April 9, 2002 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 1lpp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 1Q/2001 - Crystal River 3
Crystal River 3 2Q/2001 Performance Summary Page 1 of 2 2Q/2001 - Crystal River 3 Initiating Events Inspection Findings y
Current Action Matrix Column:
Regulatory Response Assessment Reports Reactor Radiation
~ Mitigating Systems Safety
~~
Barrier Emergency Integrity Preparedness Performance Indicators Reactor Coolant System Leakage 0N)
Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators y
Safeguards Physical Protection last Modified: April 9, 2002 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 1lpp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 2Q/2001 - Crystal River 3
Crystal River 3 3Q/2001 Performance Summary Page 1 of 2 3Q/2001 - Crystal River 3 Initiating Events Inspection Findings y
Current Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
~ Mitigating...
Barrier Emergency Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators y
Safeguards Physical Protection last Modified: April 9, 2002 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 1lpp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 3Q/2001 - Crystal River 3
Crystal River 3 4Q/2001 Performance Summary Page 1 of 2 4Q/2001 - Crystal River 3 Initiating Events Inspection Findings y
Current Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
~ Mitigating...
Barrier Emergency Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators y
Safeguards Physical Protection last Modified: March 1, 2002 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 1lpp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 4Q/2001 - Crystal River 3
Crystal River 3 1Q/2002 Performance Summary Page 1 of 2 1Q/2002 - Crystal River 3 Initiating Events Current Action Matrix Column:
Inspection Findings y
Reactor Safety Mitigating Systems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency Preparedness Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators y
Safeguards Physical Protection last Modified: May 3, 2002 Legend: R=Red W=White T=Thresho1ds Wlder deve1opment N=Not ilpp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 1Q/2002 - Crystal River 3 Initiating Events Nofidlp 10/2002 lhls q..ter 40/2001 30/20011 =. =
2012001 I:.=
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings Nofh:tlgs Nofidlp No fi"ldilgs Nofidlp Nofndiras ttaq..ter lhlsq..ter this qlB1er lhls CJ.Brier thls~r 1=-=
I No'ltldngs this....
I No1na"Qs this IJ,Brter I
Nofndllngs ttis..-ter Findings without I No'ltldngs 1No1hqs I
Nofhdllrgs color designation this IJB'ler this IJ,llrter thls~r 1:.: 1=-=
I No'ltldngs this....
I No1n*"Qs this IJ,Brter I
Nofndllngs thls..-mr Miscellaneous findings Addition a I I nsp e cti on & Assessment Info rm ati on
+ List of Inspection Reports Safeguards Physical Protection Nofh:tlgs lhls"8ter No'lh:tlgs this~
No'lh:llgs lhlslJBter No'lh:tlgs this~
+ Assessment Rep o rts/1 nsp e cti on PI ans:
10/2002
+ List of Assessment Letters/I nsp e cti on PI ans 40/2001 30/2001 20/2001
+ Cross Reference Of Assessment Reports Last Modified: July 22, 2002
Crystal River 3 2Q/2002 Performance Summary Page 1 of 4 2Q/2002 - Crystal River 3 07/03/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html
Page 2 of 4 2Q/2002 - Crystal River 3 07/03/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators Radiation Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Safeguards Physical Protection Last Modified: July 31, 2002 Legend: R=Red W=White T=Thresho1ds Wl.der deve1opment Y=Ye11ow G=Green I=Insuf ficient data to ca1cu1ate PI N=Not App1icab1e U=Unique Design
Page 3 of 4 2Q/2002 - Crystal River 3 07/03/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html 20!2002 Initiating Events 10!20021~=
40!2001 30!20011=-=
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings 1=-=
I No'ltldngs this..-ter I No1na"Qs this CJ,arter I
Nofndllngs ttis..-ter 1~= 1:s:
I No fi"ldilgs this IJB'ter" I Nomcrgs this CJ.Brier I
No fildirgs thls~r 1=-=
I No'ltldngs thls..-ter I No1na"Qs this CJ,arter I
Nofndllngs thls..-mr Findings without I No'ltldngs I No1ha"Qs I
Nofndllngs color designation thlslJB'ler this IJ,llrter thls~r Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc Physical Protectio1 No'lh:tlgs this~
No1h:tlgs thls"8ter No'lh:tlgs this~
No'lh:tlgs thls(JBter
+ Assessment Rep o rts/1 nsp e cti on PI ans:
20/2002
+ List of Assessment Letters/I nsp e cti on PI ans 10/2002 40/2001 30/2001
+ Cross Reference Of Assessment Reports Last Modified: August 29, 2002
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 4 of 4 2Q/2002 - Crystal River 3 07/03/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html
Crystal River 3 3Q/2002 Performance Summary Page 1 of 3 3Q/2002 - Crystal River 3 Inspection Findings
¥ Current Action Matrix Co I um n:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
Initiating Mitigating
~
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators last Modified: October 22, 2002 Performance Indicators
¥ Safeguards Physical Protection
Page 2 of 3 3Q/2002 - Crystal River 3 30/2002 20/2002 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Initiating Events Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings Nofh:tlgs Nofidlgs No fi"ldilgs Nofidlgs Nofndiras
'lta~ster 1ta1J81:er
'ltaq..ter ttaq..ter
'ltaq..ter 1:m=
I No'ltldngs ttisq..ter I
No1na"Qs ttisq..ter I
Nofndllngs ttisq..ter Safeguarc Physical Protectio1 Nofh:tlgs thls~ster No fh:tlJas this~--
1012002 I=*= I Noitdlg*
1:s= I No'ltldngs 1:s= 1=-'=
Noitdlgs tta:~ster tta: qlB'ter thls~ster 40/2001 1:s= I No'ltldngs 1:s= l:S':
No fh:tlJas Nsq..ter this~--
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Rep o rts/1 nsp e cti on PI ans:
30/2002 20/2002 10/2002 40/2001
+ Cross Reference Of Assessment Reports Last Modified: December 2, 2002
+ List of Inspection Reports
+ List of Assessment Letters/I nsp e cti on PI ans
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 3 of 3 3Q/2002 - Crystal River 3
Crystal River 3 4Q/2002 Performance Summary Page 1 of 3 4Q/2002 - Crystal River 3 Inspection Findings y
Current Action Matrix Co I um n:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
Initiating Mitigating
~
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators last Modified: January 30, 2003 Performance Indicators y
Safeguards Physical Protection
Page 2 of 3 4Q/2002 - Crystal River 3 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Initiating Events Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings Safeguarc Physical Protectio1 40!20021=*=
I Noih:t"G*
l:m=
I No'ltldngs I No1na"Qs I
Nofndllngs No1h:h;as ttis-..ister ttisq..ter ttisq..ter ttisq..ter lhis-..ister 30!2002 I
Nom:tlg*
1:s= I No fi"ldilgs 1:s= I:.':
Nom:tlgs tta-..ister
'ltaq..ter lhls-..ister 20!2002 1:m=
I No'ltldngs 1=-=
1=-'=
No1h:h;as tisq..ter lhls-..ister 1oi2002lt:.=
I Noih:t"G*
1:a= I No'ltldngs 1=-=
1=-'=
No1h:h;as
'IN&:-..iarter
'INsqlB'ter this -..iarter Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Rep o rts/1 nsp e cti on PI ans:
40/2002 30/2002 20/2002 10/2002
+ Cross Reference Of Assessment Reports Last Modified: March 25, 2003
+ List of Inspection Reports
+ List of Assessment Letters/I nsp e cti on PI ans
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 3 of 3 4Q/2002 - Crystal River 3
Crystal River 3 1Q/2003 Performance Summary Page 1 of 4 1Q/2003 - Crystal River 3 07/22/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html
Page 2 of 4 1Q/2003 - Crystal River 3 07/22/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators Radiation Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Safeguards Physical Protection Last Modified: April 2 2, 2003 Legend: R=Red W=White T=Thresho1ds Wl.der deve1opment Y=Ye11ow G=Green I=Insuf ficient data to ca1cu1ate PI N=Not App1icab1e U=Unique Design
Page 3 of 4 1Q/2003 - Crystal River 3 07/22/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html Initiating Events 10!20031=*=
40!20021 =*=
30!2002 20!2002 Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings I
No1h:h;a*
ttis-..ister 1=-=
I No'ltldngs ttisq..ter I No1na"Qs ttisq..ter I
Nofndllngs ttisq..ter I
Nom:tlg*
tta-..ister 1:.= I No fi"ldilgs
'ltaq..ter 1:s=
I:.':
I No1h:h;as ttis-..ister 1=-=
I No'ltldngs ttisq..ter 1=-=
1=-'=
I No1h:h;a*
'IN&:-..iarter 1:a=
I No'ltldngs
'INsqlB'ter 1=-=
1=-'=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc Physical Protectio1 No1h:h;as lhis-..ister Nom:tlgs lhls-..ister No1h:h;as lhls-..ister No1h:h;as this -..iarter
+ Assessment Rep o rts/1 nsp e cti on PI ans:
10/2003
+ List of Assessment Letters/I nsp e cti on PI ans 40/2002 30/2002 20/2002
+ Cross Reference Of Assessment Reports Last Modified: May 30, 2003
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 4 of 4 1Q/2003 - Crystal River 3 07/22/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html
Crystal River 3 2Q/2003 Performance Summary Page 1 of 4 2Q/2003 - Crystal River 3 10/08/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html
Page 2 of 4 2Q/2003 - Crystal River 3 10/08/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators Radiation Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Safeguards Physical Protection Last Modified: July 22, 2003 Legend: R=Red W=White T=Thresho1ds Wl.der deve1opment Y=Ye11ow G=Green I=Insuf ficient data to ca1cu1ate PI N=Not App1icab1e U=Unique Design
Page 3 of 4 2Q/2003 - Crystal River 3 10/08/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html Initiating Events 20!20031=*=
10!20031 =*=
40!20021 =*=
30!2002 Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings 1=-=
I No'ltldngs ttisq..ter I No1na"Qs ttisq..ter I
Nofndllngs ttisq..ter I
Nom:tlg*
tta-..ister 1:.= I No fi"ldilgs
'ltaq..ter 1:s=
I:.':
I No'lh:tlgs ttis-..ister 1=-=
I No'ltldngs ttisq..ter 1=-=
1=-'=
I No'lh:tlg*
'IN&:-..iarter 1:a=
I No'ltldngs
'INsqlB'ter 1=-=
1=-'=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc Physical Protectio1 No'lh:tlgs lhis-..ister Nom:tlgs lhls-..ister No'lh:tlgs lhls-..ister No'lh:tlgs this -..iarter
+ Assessment Rep o rts/1 nsp e cti on PI ans:
20/2003
+ List of Assessment Letters/I nsp e cti on PI ans 10/2003 40/2002 30/2002
+ Cross Reference Of Assessment Reports Last Modified: September 4, 2003
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 4 of 4 2Q/2003 - Crystal River 3 10/08/2003 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html
Crystal River 3 3Q/2003 Performance Summary Page 1 of 4 3Q/2003 - Crystal River 3 01/12/2004 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html
Page 2 of 4 3Q/2003 - Crystal River 3 01/12/2004 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators Radiation Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Safeguards Physical Protection Last Modified: October 22, 2003 Legend: R=Red W=White T=Thresho1ds Wl.der deve1opment Y=Ye11ow G=Green I=Insuf ficient data to ca1cu1ate PI N=Not App1icab1e U=Unique Design
Page 3 of 4 3Q/2003 - Crystal River 3 01/12/2004 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html Initiating Events 30!20031=*=
20!20031 =*=
10!20031 =*=
40!20021 =*=
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings 1=-=
I No'ltldngs ttisq..ter I No1na"Qs ttisq..ter I
Nofndllngs ttisq..ter 1:.= I No fi"ldilgs ttaq..ter 1:s= I:.':
I No'lh:tlgs ttis-..ister 1=-=
I No'ltldngs ttis q..ter 1=-=
1=-'=
I No'lh:tlg*
'IN&:-..iarter 1:a= I No'ltldngs
'INsqlB'ter 1=-=
1=-'=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc Physical Protectio1 No'lh:tlgs lhis-..ister No1h:tlgs lhls-..ister No'lh:tlgs lhls-..ister No'lh:tlgs this -..iarter
+ Assessment Rep o rts/1 nsp e cti on PI ans:
30/2003
+ List of Assessment Letters/I nsp e cti on PI ans 20/2003 10/2003 40/2002
+ Cross Reference Of Assessment Reports Last Modified: December 1, 2003
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 4 of 4 3Q/2003 - Crystal River 3 01/12/2004 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html
Crystal River 3 4Q/2003 Performance Summary Page 1 of 4 4Q/2003 - Crystal River 3 04/22/2004 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html
Page 2 of 4 4Q/2003 - Crystal River 3 04/22/2004 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators Radiation Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Safeguards Physical Protection Last Modified: Jam.1a,y 23, 2004 Legend: R=Red W=White T=Thresho1ds Wl.der deve1opment Y=Ye11ow G=Green I=Insuf ficient data to ca1cu1ate PI N=Not App1icab1e U=Unique Design
Page 3 of 4 4Q/2003 - Crystal River 3 04/22/2004 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html 40!2003 Initiating Events 30!20031
- 's=
20!20031 =*=
10!20031 =*=
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings I
No1h:h;as ttis-..ister I
No'ltldngs ttisq..ter I No1na"Qs ttisq..ter I
Nofndllngs ttisq..ter 1:.= I No fi"ldilgs ttaq..ter 1:s= I:.':
1=-=
I No'ltldngs tisq..ter 1=-=
1=-'=
I Noih:t"G*
'IN&:-..iarter 1:a= I No'ltldngs
'INsqlB'ter 1=-=
1=-'=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc Physical Protectio1 No1h:h;as lhis-..ister No1h:tlgs lhls-..ister No1h:h;as lhls-..ister No1h:h;as this -..iarter
+ Assessment Rep o rts/1 nsp e cti on PI ans:
40/2003
+ List of Assessment Letters/I nsp e cti on PI ans 30/2003 20/2003 10/2003
+ Cross Reference Of Assessment Reports Last Modified: March 2, 2004
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 4 of 4 4Q/2003 - Crystal River 3 04/22/2004 file://C:\\RROP\\NRR\\OVERSIGHT\\ASSESS\\CR3\\cr3_chart.html
Crystal River 3 1Q/2004 Performance Summary Page 1 of 2 1Q/2004 - Crystal River 3 07/14/2004 Inspection Findings y
Current Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
Initiating...
Mitigating
~
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Last Modified: April 22, 2004 Performance Indicators y
Safeguards Physical Protection
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 1Q/2004 - Crystal River 3 07/14/2004 1012004 4012003 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Initiating Events Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design Reactor Safety Mitigating Barrier Systems Integrity Emergency Preparedness Radiation Safety Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings I
No'ltldngs ttisq..ter I No1na"Qs ttisq..ter I
Nofndllngs ttisq..ter 1:.=
l:m=
I No fi"ldilgs ttaq..ter I:.': 1:.=
1:s=
Safeguarc Physical Protectio1 No'ltldngs ttisq..ter No fi"ldilgs ttaq..ter 30120031 No fh*igs 1=-=
1=-'=
1:.=
1:m=
No'ltldngs tHs..-ter tlisq..ter 20120031 No fh*Gs 1=-=
1=-'=
1:.=
1:a=
No'ltldngs 1111 IJBl:er tNsqlB'ter Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
10/2004 40/2003 30/2003 20/2003
+ Cross Reference Of Assessment Reports Last Modified: May 5, 2004
+ List of Inspection Reports
+ List of Assessment Letters/I nsp e cti on PI ans
Crystal River 3 2Q/2004 Performance Summary Page 1 of 2 2Q/2004 Performance Summary - Crystal River 3 Initiating Events Inspection Findings y
Current Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
~ Mitigating Barrier Emergency Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators y
Safeguards Physical Protection (NOT PUBLIC)
Last Modified: September 8, 2004 Legend: R=Red W=White T=Thresho1ds Wlder deve1opment N=Not Jlpp1icab1e Y-='re11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unigue Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 2Q/2004 Performance Summary - Crystal River 3
Crystal River 3 3Q/2004 Performance Summary Page 1 of 2 3Q/2004 Performance Summary - Crystal River 3 Initiating Events Inspection Findings
¥ Current Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
Mitigating
~
Barrier Emergency Systems Integrity Preparedness Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protection (NOT PUBLIC)
Last Modified: October 25, 2004 Legend: R=Red W=White T=Thresho1ds under deve1op:ment N=Not 1lpp1icab1e Y~e11ow G=Green I=Insuf ficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 3Q/2004 Performance Summary - Crystal River 3 Initiating Events 3Qf2004 I:::
2Qf2004 1Qf2004 4Qf2003 Reactor Safety Mitigating Barrier Systems Integrity Emergency Preparedness Radiation Safety Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings I
No1na"Qs ttis CJ,arter I
Nofndllngs ttis..-ter 1=-=
1=-=
I No fi"ldilgs this IJB'ter" I
No1nrgs this IJ,llrter I
No fildirgs thlsipner 1~= 1:s:
I No 'ltldngs this IJ,larter I
No1na"Qs this CJ,arter I
Nofndllngs thls..-mr 1=-=
1=-=
I No 'ltldngs thls..-ter I
Nofndllngs thls~r 1~=
1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc Physical Protectio1 (NOT PUBL
+ Assessment Reports/Inspection Plans:
30/2004
+ List of Assessment Letters/I nsp e cti on PI ans 20/2004 10/2004 40/2003
+ Cross Reference Of Assessment Reports Last Modified: December 29, 2004
Crystal River 3 4Q/2004 Performance Summary Page 1 of 2 4Q/2004 Performance Summary - Crystal River 3 Initiating Events Inspection Findings
¥ Current Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
Mitigating
~
Barrier Emergency Systems Integrity Preparedness Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protection (NOT PUBLIC)
Last Modified: March 9, 2005 Legend: R=Red W=White T=Thresho1ds under deve1op:ment N=Not 1lpp1icab1e Y~e11ow G=Green I=Insuf ficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 4Q/2004 Performance Summary - Crystal River 3 Initiating Events 4Qf2004 I:::
3Qf2004 I No film-gs this IJ8ter" 2Qf2004 1Qf2004 Reactor Safety Mitigating Barrier Systems Integrity Emergency Preparedness Radiation Safety Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings I
No'ltldngs this..-ter I
No1na"Qs this CJ,arter I
Nofndllngs ttis..-ter 1=-= 1=-=
I Nomcrgs this IJ,llrter I
No fildirgs thlsipner 1~= 1:s:
I No'ltldngs thls..-ter I
No1na"Qs this CJ,arter I
Nofndllngs thls..-mr 1=-= 1=-=
I No'ltldngs thls..-ter I
No1na"Qs this IJ,llrter I
Nofndllngs this cplrter 1~= 1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc Physical Protectio1 (NOT PUBL
+ Assessment Reports/Inspection Plans:
40/2004
+ List of Assessment Letters/I nsp e cti on PI ans 30/2004 20/2004 10/2004
+ Cross Reference Of Assessment Reports Last Modified: March 9, 2005
Crystal River 3 1Q/2005 Performance Summary Page 1 of 2 1Q/2005 Performance Summary - Crystal River 3 Initiating Events Inspection Findings
¥ Current Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
Mitigating
~
Barrier Emergency Systems Integrity Preparedness Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protection (NOT PUBLIC)
Last Modified: June 17, 2005 Legend: R=Red W=White T=Thresho1ds under deve1op:ment N=Not 1lpp1icab1e Y~e11ow G=Green I=Insuf ficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 1Q/2005 Performance Summary - Crystal River 3 Initiating Events 1Qf2005 I:::
4Qf2004 I No film-gs this IJ8ter" 3Qf2004 I No fh*igs thls..-ter 2Qf2004 Reactor Safety Mitigating Barrier Systems Integrity Emergency Preparedness Radiation Safety Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings I
No'ltldngs this..-ter I
No1na"Qs this CJ,arter I
Nofndllngs ttis..-ter 1=-= 1=-=
I No fi"ldilgs this IJ8ter" I
No1nrgs this IJ,llrter I
No fildirgs thlsipner 1~= 1:s:
I No1na"Qs this CJ,arter I
Nofndllngs thls..-mr 1=-= 1=-=
I No'ltldngs thls..-ter I
No1na"Qs this IJ,llrter I
Nofndllngs this cplrter 1~= 1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc Physical Protectio1 (NOT PUBL
+ Assessment Reports/Inspection Plans:
10/2005
+ List of Assessment Letters/I nsp e cti on PI ans 40/2004 30/2004 20/2004
+ Cross Reference Of Assessment Reports Last Modified: June 17, 2005
Crystal River 3 2Q/2005 Performance Summary Page 1 of 2 2Q/2005 Performance Summary - Crystal River 3 Initiating Events Inspection Findings
¥ Current Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
Mitigating
~
Barrier Emergency Systems Integrity Preparedness Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protection (NOT PUBLIC)
Last Modified: Al)gl)st 3, 2005 Legend: R=Red W=White T=Thresho1ds under deve1op:ment N=Not 1lpp1icab1e Y~e11ow G=Green I=Insuf ficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 2Q/2005 Performance Summary - Crystal River 3 Initiating Events 20!20051 :S':
10!20051 No film,gs 111s IJJSl:er 40f2004 I No,niavs 111s..-t*
30!20041 No fhdllngs 1111 IJBl:er Reactor Safety Mitigating Barrier Systems Integrity Emergency Preparedness Radiation Safety Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings I
Nofld'Vs ttis~
I Nofhdllrvs ttis~
1:.=
1:a=
I Nomdilgs 111s q..ter 1:s=
I:.': 1:.=
1:s=
I No 'ltldhgs tisq..ter 1=-= 1=-'=
1:.=
1:m=
1=-= 1=-'=
1:.=
1:a=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc.
Physical Protectio1 (NOT PUBL
+ Assessment Reports/Inspection Plans:
20/2005
+ List of Assessment Letters/I nsp e cti on PI ans 10/2005 40/2004 30/2004
+ Cross Reference Of Assessment Reports Last Modified: A1Jg1Jst 24, 2005
Crystal River 3 3Q/2005 Performance Summary Page 1 of 2 3Q/2005 Performance Summary - Crystal River 3 Initiating Events Inspection Findings
¥ Current Action Matrix Column:
Regulatory Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
Mitigating
~
Barrier Emergency Systems Integrity Preparedness Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protection (NOT PUBLIC)
Last Modified: November 3, 2005 Legend: R=Red W=White T=Thresho1ds under deve1op:ment N=Not 1lpp1icab1e Y~e11ow G=Green I=Insuf ficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 3Q/2005 Performance Summary - Crystal River 3 Initiating Events 30!20051 :S':
20!20051 No film,gs 111s IJJSl:er 1or2005 I No,niavs 111s..-t*
40!20041 No fhdllngs 1111 IJBl:er I
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety Occupational Radiation Safety Public Radiation Safety Most Significant Inspection Findings I
W (1)
I Nofhdllrvs ttis..-ter 1:.= 1:a=
1:s= I:.':
1:.= 1:s=
I No 'ltldhgs tis q..ter 1=-=
1=-'=
1:.= 1:m=
I No 'ltldhgs tNs qlB'ter 1=-=
1=-'=
1:.= 1:a=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc.
Physical Protectio1 (NOT PUBL
+ Assessment Reports/Inspection Plans:
30/2005
+ List of Assessment Letters/I nsp e cti on PI ans 20/2005 10/2005 40/2004
+ Cross Reference Of Assessment Reports Last Modified: November 30, 2005
Crystal River 3 4Q/2005 Performance Summary Page 1 of 2 4Q/2005 Performance Summary - Crystal River 3 Initiating Events Inspection Findings
¥ Current Action Matrix Column:
Regulatory Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
Mitigating
~
Barrier Emergency Systems Integrity Preparedness Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protection (NOT PUBLIC)
Last Modified: Jan1Jary 30, 2006 Legend: R=Red W=White T=Thresho1ds under deve1op:ment N=Not 1lpp1icab1e Y~e11ow G=Green I=Insuf ficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 4Q/2005 Performance Summary - Crystal River 3 4012005 Initiating Events 30120051 No film,gs 111s IJJSl:er 2012005 I No,niavs 111s..-t*
10120051 No fhdllngs 1111 IJBl:er I
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety Occupational Radiation Safety Public Radiation Safety Most Significant Inspection Findings I No'ltldhgs ttis q..ter I Nofld'Vs ttisq..ter I Nofhdllrvs ttisq..ter 1:.= l:m=
I W (1) l:S'=
1:.= 1:s=
1=-= 1=-'= 1:.= 1:m=
1 No'ltldhgs tNs qlB'ter 1=-= 1=-'= 1:.= 1:a=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc.
Physical Protectio1 (NOT PUBL
+ Assessment Reports/Inspection Plans:
40/2005
+ List of Assessment Letters/I nsp e cti on PI ans 30/2005 20/2005 10/2005
+ Cross Reference Of Assessment Reports Last Modified: March 3, 2006
Crystal River 3 1Q/2006 Performance Summary Page 1 of 2 1Q/2006 Performance Summary - Crystal River 3 Initiating Events Inspection Findings
¥ Current Action Matrix Column:
Regulatory Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
Mitigating
~
Barrier Emergency Systems Integrity Preparedness Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protection (NOT PUBLIC)
Last Modified: May 5, 2006 Legend: R=Red W=White T=Thresho1ds under deve1op:ment N=Not 1lpp1icab1e Y~e11ow G=Green I=Insuf ficient data to ca1cu1ate PI U=Unique Design
Inspection & Assessment Information l Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 1Q/2006 Performance Summary - Crystal River 3 Initiating Events 10!20061 :S':
40!2005 30f2005 I No,niavs tHs..-ter I 20!20051 No fhdllngs 1111 IJBl:er Reactor Safety Mitigating Barrier Systems Integrity Emergency Preparedness Radiation Safety Occupational Public Radiation Radiation Safety Safety Most Significant Inspection Findings I
No 'ltldhgs ttis q..ter I
Nofld'Vs ttisq..ter I
Nofhdllrvs ttisq..ter 1:.= 1:a=
I Nomdilgs ttaq..ter 1:s= I:.':
1:.= 1:s=
I W (1) 1=-'=
1:.= 1:m=
1=-=
1=-'=
1:.= 1:a=
Miscellaneous findings Additional Inspection & Assessment Information
+ List of Inspection Reports Safeguarc.
Physical Protectio1 (NOT PUBL
+ Assessment Reports/Inspection Plans:
10/2006
+ List of Assessment Letters/I nsp e cti on PI ans 40/2005 30/2005 20/2005
+ Cross Reference Of Assessment Reports Last Modified: May 25, 2006
Crystal River 3 2Q/2006 Performance Summary Page 1 of 2 2Q/2006 Performance Summary - Crystal River 3 Initiating Events Inspection Findings
¥ Current Action Matrix Column:
Regulatory Response Assessment Reports Reactor Radiation Safety Safety
~~
T T
~ Mitigating
~
Barrier Emergency Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protection (NOT PUBLIC)
Last Modified: A1.Jg1.Jst 2, 2006 Legend : R=Re d W=Wh.i t e T=Thres holds under de ve loprnen t N=No t 11.ppl ic able Y=Ye11ow G=Green I=Insufficient data to calculate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 2Q/2006 Performance Summary - Crystal River 3
Crystal River 3 3Q/2006 Performance Summary Page 1 of 2 3Q/2006 Performance Summary - Crystal River 3 Initiating Events Current Action Matrix Column:
Inspection Findings y
Reactor Safety Mitigating Systems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency Preparedness Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators y
Safeguards Physical Protection (NOT PUBLIC)
Last Modified: November 6, 2006 Legend : R=Red W=Wh.ite T=Thresho1ds under development N=Not Jl.pp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 3Q/2006 Performance Summary - Crystal River 3 Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Safeguards Physical Protection (NOT PUBLIC)
Most Significant Inspection Findings 30120061 :. =
I No flrdlgs ttis CJ,arter 1=*=
I Noih:t"G*
ttis-..ister l:m= 1:.:
20120061 :1s =
1:.:
I Nom:tlg*
tta-..ister 1:s: 1:1s:
10120061 :. =
1 No flrdlJilS ttis CJ,arter 1:.: 1 No1h:h;as ttws-..ister 1:a: 1:.:
4012005 1
No flrdlgs
'* IJ,llrter 1:.: 1 Noih:t"G*
Ws-..iarter 1:a: 1:.:
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
30/2006 20/2006 10/2006 40/2005
+ Cross Reference Of Assessment Reports Last Modified: December 13, 2006
+ List of Inspection Reports
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Crystal River 3 4Q/2006 Performance Summary Page 1 of 2 4Q/2006 Performance Summary - Crystal River 3 Initiating Events Current Action Matrix Column:
Inspection Findings y
Reactor Safety Mitigating Systems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency Preparedness Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators y
Safeguards Physical Protection (NOT PUBLIC)
Last Modified: Febwary 6, 2007 Legend : R=Red W=Wh.ite T=Thresho1ds under development N=Not Jl.pp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Page 2 of 2 4Q/2006 Performance Summary - Crystal River 3 Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Safeguards Physical Protection (NOT PUBLIC)
Most Significant Inspection Findings 40120061 :. =
I No flrdlgs ttis CJ,arter 1=*=
I Noih:t"G*
ttis-..ister l:m=
30120061 :1s =
1 Nofirdlgs
'* CJ.Brier 1:.: 1 Nom:tlg*
tta-..ister 1:s: 1:1s:
20120061 :. =
1:.: 1 No1h:h;as ttis-..ister 1:a: 1:.:
10120061 :1s =
1 No flrdlgs
'* IJ,llrter 1:.: 1 Noih:t"G*
Ws-..iarter 1:a: 1:1s:
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
40/2006 30/2006 20/2006 10/2006
+ Cross Reference Of Assessment Reports Last Modified: March 1, 2007
+ List of Inspection Reports
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Crystal River 3 1Q/2007 Performance Summary Initiating Events Current Action Matrix Column:
Inspection Findings
¥ Reactor Safety Mitigating Sy.stems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency P reparedne.s.s Safety i
i Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protection (NOT PUBLIC)
Last Modified: Ji.me 1, 2007 Legend : R=R.e d W=Wh.i t e T=Thres ho1 ds Wlder de ve 1oprnen t N=No t llpp1 ic ab1 e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 2Q/2007 Performance Summary Initiating Events Current Action Matrix Column:
Inspection Findings
¥ Reactor Safety Mitigating Sy.stems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency P reparedne.s.s Safety i
i Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protect ion!
Security Last Modified: A/../g/../st 6, 2007 Legend : R=R.e d W=Wh.i t e T=Thres ho1 ds Wlder de ve 1oprnen t N=No t llpp1 ic ab1 e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Safeguards Physical Protectiorl Security Most Significant Inspection Findings 20!20071 :1s =
1:.: 1 Noitdlg*
tta:~ster 1:s: 1:11:
10!2007 1:.: 1 No1nh;as ttis~ster 1:s: 1:.:
40!20061 :. = 1 No flrdlgs ttis CJ,arter 1:.: 1 No1nh;a*
ttis~ster 1:a:
30!20061 :1s = 1 Nofirdlgs
'* CJ.Brier 1:.: 1 Nom:tlg*
tta~ster 1:s: 1:1s:
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2007 10/2007 40/2006 30/2006
+ Cross Reference Of Assessment Reports Last Modified: August 24, 2007
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Crystal River 3 3Q/2007 Performance Summary Initiating Events Current Action Matrix Column:
Inspection Findings
¥ Reactor Safety Mitigating Sy.stems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency P reparedne.s.s Safety i
i Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protect ion!
Security Last Modified: December 7, 200 7 Legend : R=R.e d W=Wh.i t e T=Thres ho1 ds Wlder de ve 1oprnen t N=No t llpp1 ic ab1 e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Safeguards Physical Protectiorl Security Most Significant Inspection Findings 30!20071 :1s =
I Noflrdlgs
'* IJ,llrter 1:.:
I Noitdlg*
tta~ster 1:s: 1:11:
2012001 I :is=
1:.:
I No1nh;as ttis~ster 1:s: 1:1s:
10!2007 1=*=
I No1nh;a*
ttis~ster l:m= 1:.:
40!20061 :1s =
I Nofirdlgs
'* CJ.Brier 1:.:
I Nom:tlg*
tta~ster 1:s:
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
30/2007 20/2007 10/2007 40/2006
+ Cross Reference Of Assessment Reports Last Modified: December 7, 2007
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Crystal River 3 4Q/2007 Performance Summary Initiating Events Current Action Matrix Column:
Inspection Findings
¥ Reactor Safety Mitigating Sy.stems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency P reparedne.s.s Safety i
i Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protect ion!
Security Last Modified: Febwari; 4, 2008 Legend : R=R.e d W=Wh.i t e T=Thres ho1 ds Wlder de ve 1oprnen t N=No t llpp1 ic ab1 e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Safeguards Physical Protectiorl Security Most Significant Inspection Findings 40120071 :. =
1:.:
I Noitdlg*
tta:~ster 1:s: 1:.:
30120071 :. = I No flrdlgs tis IJ,llrter 1:.:
I No1nh;as tis~ster 1:s: 1:.:
2012001 I:.=
1=*=
I No1nh;a*
ttis~ster l:m=
1:.:
1012007 1:.:
I Nom:tlg*
'lta~ster 1:s: l:m=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
40/2007 30/2007 20/2007 10/2007
+ Cross Reference Of Assessment Reports Last Modified: February 4, 2008
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Crystal River 3 1Q/2008 Performance Summary Initiating Events Current Action Matrix Column:
Inspection Findings
¥ Reactor Safety Mitigating Systems Barrier Integrity Licensee Response Assessment Reports Emergency Preparedness Radiation Safety 0cc upat ional Radiation Safety Public Radiation Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protectiorl Security Last Modified: April 30, 2008 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Y-=fe11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 2Q/2008 Performance Summary Initiating Events Current Action Matrix Column:
Inspection Findings
¥ Reactor Safety Mitigating Systems Barrier Integrity Licensee Response Assessment Reports Emergency Preparedness Radiation Safety 0cc upat ional Radiation Safety Public Radiation Safety Performance Indicators Performance Indicators
¥ Safeguards Physical Protectiorl Security Last Modified: Al)gl)st 4, 2008 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Y-=fe11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 3Q/2008 Performance Summary Initiating Events Current Action Matrix Column:
Inspection Findings y
Reactor Safety Mitigating Systems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency Preparedness Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators y
Safeguards Security Last Modified: November 26, 2008 Legend: R=Red W=White T=Thresho1ds Wlder deve1opment N=Not il.pp1icab1e Y~e11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating
~ Mitigating....
Barrier Emergency Events Systems Integrity Preparedness Occupational Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings I
No ft'ldngs 30!2008 this qumter 1
Noitdlg*
tta:~ster 1:s= 1 No ft'ldngs tta: qumter 1:s= 1:.=
I No ft'ldngs 20!2008 this quster 1
No1nh;as ttis~ster 1:s= 1 No ft'ldngs ttisquster 1:s= 1:.=
10!2008 1:.= 1 No ft'ldngs ttis quster I
No1na"Qs ttisquster 1:.=
40!2007 1:s= 1 No fi"ldilgs ttaqiater 1:s= 1:.=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
30/2008 20/2008 10/2008 40/2007
+ Cross Reference Of Assessment Reports Last Modified: November 26, 2008
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Crystal River 3 4Q/2008 Performance Summary Initiating Events Current Action Matrix Column:
Inspection Findings y
Reactor Safety Mitigating Systems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency Preparedness Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Last Modified: Febrnary 4, 2009 Performance Indicators y
Safeguards Security
Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 1lpp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating f-)
Mitigating _.,
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings INoftld~
40!2008 ttis quster I
No1h:h;as ttis-..ister l:m=
I Noftldngs ttis quster INo~
ttisquster 1=*=
30!2008 : this qU::.
I No fi"ld" I
Nom:tlg*
tta-..ister 1:s=
I No fi"ldilgs
'ltaq..ter 1:s=
lt:s=
I Noftldngs 20!2008 this quster I
No1h:h;as ttis-..ister 1:m=
I Noftldngs ttisquster 1=-=
1=*=
10!2008 1:a=
I Noftldngs tNsqlB'ter 1=-=
1=*=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
40/2008 30/2008 20/2008 10/2008
+ Cross Reference Of Assessment Reports Last Modified: April 7, 2009
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 1Q/2009 Performance Summary Initiating Events Current Action Matrix Column:
Inspection Findings y
Reactor Safety Mitigating Systems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency Preparedness Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Last Modified: May 1, 2009 Performance Indicators y
Safeguards Security
Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 1lpp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating f-)
Mitigating _.,
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings 10!2009 l:m=
I No'ltldngs ttisq..ter I
No1na"Qs ttisq..ter 1=*=
40!2008 : this qU::.
I No fi"ld" I
Nom:tlg*
'lta~ster 1:s=
I No fi"ldilgs
'ltaq..ter 1:s=
1=*=
I No'ltldngs 30!2008 : this quster I
No1h:h;as 1Hs~--
1:m=
I No'ltldngs 1Hsq..ter 1=-=
1=*=
I No'ltldngs 20!2008 this qu.ter I
No1h:h;a*
'IN&:~arter 1:a=
I No'ltldngs
'IN&:qu.ter 1=-=
1=*=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
10/2009 40/2008 30/2008 20/2008
+ Cross Reference Of Assessment Reports Last Modified: May 28, 2009
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 2Q/2009 Performance Summary Initiating Events Current Action Matrix Column:
Inspection Findings y
Reactor Safety Mitigating Systems Barrier Integrity Licensee Response Assessment Reports Radiation Emergency Preparedness Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators Last Modified: August 25, 2009 Performance Indicators y
Safeguards Security
Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 1lpp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating f-)
Mitigating _.,
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings INoftldngs 20!2009 ttis quster I
No1h:h;as ttis-..ister l:m=
I Noftldngs ttis quster INo~
ttisquster 1=*=
10!2009 1:s=
I No fi"ldilgs ttaq..ter 1:s=
lt:s=
I Noftldngs 40!2008 : this quster I
No1h:h;as ttis-..ister 1:m=
I Noftldngs ttisquster 1=-=
1=*=
I Noftldngs 30!2008 this qu.ter I
Noih:t"G*
'IN&:-..iarter 1:a=
I Noftldngs
'IN&:qu.ter 1=-=
1=*=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2009 10/2009 40/2008 30/2008
+ Cross Reference Of Assessment Reports Last Modified: A1.Jg1.Jst 31, 2009
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 3Q/2009 Performance Summary Initiating Events Inspection Findings
¥ Reactor Safety Mitigating Systems Barrier Integrity Action Matrix Column:
Licensee Response Assessment Reports Radiation Emergency Preparedness Safety T
T Occupational Public Radiation Radiation Safety Safety Performance Indicators Performance Indicators
¥ Safeguards Security Last Modified: November 30, 2009 Legend: R=Red W=White T=Thresho1ds under deve1op:ment N=Not 1lpp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unigue Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process Initiating Events Reactor Safety Mitigating Barrier Systems Integrity Emergency Preparedness Radiation Safety Occupational Public Radiation Radiation Safety Safety Safeguarc.
Security Most Significant Inspection Findings 30!20091 :S':
I No1na"Qs ttis~
I Nofndllngs ttis~ 1:.= 1:a=
20!20091 No fildirgs 111s IJJSl:er I
No fi"ldilgs 111s q..ter 1:s= I:.':
1:.= 1:s=
10!2009 1=-= 1=-'= 1:.= 1:m=
4or2000 I No fndlln;s 1111 IJBl:er I
No 'ltldngs tNs qlB'ter 1=-= 1=-'= 1:.= 1:a=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
30/2009 20/2009 10/2009 40/2008
+ Cross Reference Of Assessment Reports Last Modified: December 10, 2009
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Crystal River 3 4Q/2009 Performance Summary Initiating Events Inspection Findings
¥ Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation
~ Mitigating Systems Safety
~~
Barrier Emergency Integrity Preparedness Performance Indicators RHotor Cool1nt Symm Aotlvltv (N)
RHotor Cool1nt Symm Llilk1g1 (N)
Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators
¥ Safeguards Security Last Modified: March 5, 2010 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 1Q/2010 Performance Summary Initiating Events Inspection Findings
¥ Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation
~ Mitigating Systems Safety
~~
Barrier Emergency Integrity Preparedness Performance Indicators RHotor Cool1nt Symm Aotlvltv (N)
RHotor Cool1nt Symm Llilk1g1 (N)
Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators
¥ Safeguards Security Last Modified: April 26, 2010 Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 2Q/2010 Performance Summary Inspection Findings
¥ Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Initiating Events Unpl1nn1d S0r1m1(N)
Unpl1nn1d Pow1r Ch1ng11(N)
~ Mitigating Systems Last Modified: JIJ/y 26, 2010 Safety
~~
Barrier Emergency Integrity Preparedness Performance Indicators R11otor Cool1nt Symm Aotlvltv (N)
R11otor Cool1nt Symm Lllk1g1 (N)
Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators
¥ Safeguards Security Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 3Q/2010 Performance Summary Inspection Findings
¥ Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Initiating Events Unpl1nn1d S0r1m1(N)
Unpl1nn1d Pow1r Ch1ng11(N)
~ Mitigating Systems Last Modified: October 25, 2010 Safety
~~
Barrier Emergency Integrity Preparedness Performance Indicators R11otor Cool1nt Symm Aotlvltv (N)
R11otor Cool1nt Symm Lllk1g1 (N)
Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators
¥ Safeguards Security Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 4Q/2010 Performance Summary Inspection Findings
¥ Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Initiating Events Unpl1nn1d S0r1m1(N)
Unpl1nn1d Pow1r Ch1ng11(N)
~ Mitigating Systems Last Modified: Jamaty 24, 2011 Safety
~~
Barrier Emergency Integrity Preparedness Performance Indicators R11otor Cool1nt Symm Aotlvltv (N)
R11otor Cool1nt Symm Lllk1g1 (N)
Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators
¥ Safeguards Security Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 1Q/2011 Performance Summary Inspection Findings
¥ Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Initiating Events Unpl1nn1d S0r1m1(N)
Unpl1nn1d Pow1r Ch1ng11(N)
~ Mitigating Systems Last Modified: May 4, 2011 Safety
~~
Barrier Emergency Integrity Preparedness Performance Indicators R11otor Cool1nt Symm Aotlvltv (N)
R11otor Cool1nt Symm Lllk1g1 (N)
Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators
¥ Safeguards Security Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 2Q/2011 Performance Summary Crystal River 3 has been shutdown since September 2009. Because the Unplanned Scrams with Complications (USwC) and Mitigating Systems Performance Index (MSPI) performance indicators (PIs) are heavily influenced by the operational status of the reactor, NRC staff has evaluated the validity of these PIs. The NRC also discussed the question of PI validity with NEI and other external stakeholders during the July 13, 2011, ROP working group meeting. Because the reactor has not been critical for two years, there have been no opportunities for a scram that would count in the USwC indicator. Similarly, the MSPI values are skewed because of the very low number of critical hours in three years. For these reasons, the staff has determined that these PIs no longer provide valid indications of performance.
Initiating Events Unpl1nn1d S0r1m1(N)
Unpl1nn1d Pow1r Ch1ng11(N)
Unpl1nn1d S0r1m1wlth Compllo1tlon1 (N)
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators Em1rg1noy AC Pow1r s*m (N)
High PIIIIUl'II lnJ1otlon Syltlim (N)
H11t R1mow1I S}S1:1m (N)
R11ldu1I Hilt R1mov1I Syltlim (N)
Coollng Wltlr S}Sl:1 m1 (N)
R11otor Cool1nt Syltlim Aotlvltv (N)
R11otor Cool1nt Syltlim Lla1111 (N)
Last Modified: JI.J/y 22, 2011 Radiation Safety Safeguards T
T 0cc upat ional Public Radiation Radiation Security Safety Safety Legend: R=Red W=White T=Thresho1ds under deve1opment N=Not 11.pp1icab1e U=Unique Design Y=Ye11ow G=Green I=Insufficient data to ca1cu1ate PI
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 3Q/2011 Performance Summary Crystal River 3 has been shutdown since September 2009. Because the Unplanned Scrams with Complications (USwC) and Mitigating Systems Performance Index (MSPI) performance indicators (PIs) are heavily influenced by the operational status of the reactor, NRC staff has evaluated the validity of these PIs. The NRC also discussed the question of PI validity with NEI and other external stakeholders during the July 13, 2011, ROP working group meeting. Because the reactor has not been critical for two years, there have been no opportunities for a scram that would count in the USwC indicator. Similarly, the MSPI values are skewed because of the very low number of critical hours in three years. For these reasons, the staff has determined that these PIs no longer provide valid indications of performance.
Initiating Events Unpl1nn1d S0r1m1(N)
Unpl1nn1d Pow1r Ch1ng11(N)
Unpl1nn1d S0r1m1wlth Compllo1tlon1 (N)
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators Em1rg1noy AC Pow1r s*m (N)
High PIIIIUl'II lnJ1otlon Syltlim (N)
H11t R1mow1I S}S1:1m (N)
R11ldu1I Hilt R1mov1I Syltlim (N)
Coollng Wltlr S}Sl:1 m1 (N)
R11otor Cool1nt Syltlim Aotlvltv (N)
R11otor Cool1nt Syltlim Lla1111 (N)
Last Modified: October 24, 2011 Radiation Safety Safeguards T
T 0cc upat ional Public Radiation Radiation Security Safety Safety Legend: R=Red W=White Y=Ye11ow G=Green T=Thres ho1 ds under de ve 1opmen t I=Insuf ficient data to ca1cu1ate PI N=Not 11.pp1icab1e U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 4Q/2011 Performance Summary Crystal River 3 has been shutdown since September 2009. Because the Unplanned Scrams with Complications (USwC) and Mitigating Systems Performance Index (MSPI) performance indicators (PIs) are heavily influenced by the operational status of the reactor, NRC staff has evaluated the validity of these PIs. The NRC also discussed the question of PI validity with NEI and other external stakeholders during the July 13, 2011, ROP working group meeting. Because the reactor has not been critical for two years, there have been no opportunities for a scram that would count in the USwC indicator. Similarly, the MSPI values are skewed because of the very low number of critical hours in three years. For these reasons, the staff has determined that these PIs no longer provide valid indications of performance.
Initiating Events Unpl1nn1d S0r1m1(N)
Unpl1nn1d Pow1r Ch1ng11(N)
Unpl1nn1d S0r1m1wlth Compllo1tlon1 (N)
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators Em1rg1noy AC Pow1r s*m (N)
High PIIIIUl'II lnJ1otlon Syltlim (N)
H11t R1mow1I S}S1:1m (N)
R11ldu1I Hilt R1mov1I Syltlim (N)
Coollng Wltlr S}Sl:1 m1 (N)
R11otor Cool1nt Syltlim Aotlvltv (N)
R11otor Cool1nt Syltlim Lla1111 (N)
Last Modified: Febniary 2, 2012 Radiation Safety Safeguards T
T 0cc upat ional Public Radiation Radiation Security Safety Safety Legend: R=Red W=White Y=Ye11ow G=Green T=Thres ho1 ds under de ve 1opmen t I=Insuf ficient data to ca1cu1ate PI N=Not 11.pp1icab1e U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 1Q/2012 Performance Summary Crystal River 3 has been shutdown since September 2009. Because the Unplanned Scrams with Complications (USwC) and Mitigating Systems Performance Index (MSPI) performance indicators (PIs) are heavily influenced by the operational status of the reactor, NRC staff has evaluated the validity of these PIs. The NRC also discussed the question of PI validity with NEI and other external stakeholders during the July 13, 2011, ROP working group meeting. Because the reactor has not been critical for two years, there have been no opportunities for a scram that would count in the USwC indicator. Similarly, the MSPI values are skewed because of the very low number of critical hours in three years. For these reasons, the staff has determined that these PIs no longer provide valid indications of performance.
Initiating Events Unpl1nn1d S0r1m1(N)
Unpl1nn1d Pow1r Ch1ng11(N)
Unpl1nn1d S0r1m1wlth Compllo1tlon1 (N)
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators Em1rg1noy AC Pow1r s*m (N)
High PIIIIUl'II lnJ1otlon Syltlim (N)
H11t R1mow1I S}S1:1m (N)
R11ldu1I Hilt R1mov1I Syltlim (N)
Coollng Wltlr S}Sl:1 m1 (N)
R11otor Cool1nt Syltlim Aotlvltv (N)
R11otor Cool1nt Syltlim Lla1111 (N)
Last Modified: Febniary 2, 2012 Radiation Safety Safeguards T
T 0cc upat ional Public Radiation Radiation Security Safety Safety Legend: R=Red W=White Y=Ye11ow G=Green T=Thres ho1 ds under de ve 1opmen t I=Insuf ficient data to ca1cu1ate PI N=Not 11.pp1icab1e U=Unique Design
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 2Q/2012 Performance Summary Crystal River 3 has been shutdown since September 2009. Because the Unplanned Scrams with Complications (USwC) and Mitigating Systems Performance Index (MSPI) performance indicators (PIs) are heavily influenced by the operational status of the reactor, NRC staff has evaluated the validity of these PIs. The NRC also discussed the question of PI validity with NEI and other external stakeholders during the July 13, 2011, ROP working group meeting. Because the reactor has not been critical for two years, there have been no opportunities for a scram that would count in the USwC indicator. Similarly, the MSPI values are skewed because of the very low number of critical hours in three years. For these reasons, the staff has determined that these PIs no longer provide valid indications of performance.
Initiating Events Unpl.1nnad Sor.ams: (N)
Unpl.1nnadP-1 Ch.1ng*(N)
Unpl.1nnad Sor.11n1Nlh Compllodons(N)
~
Reactor Safety
~~
Mitigating
~
Barrier Emergency Systems Integrity Preparedness Performance Indicators EmarganoyAC P-rSystlim (N)
HlghP-rt1 lnJ*otlon Systlim (N)
H*.ll:R*mow,11 Systlim(N)
RllllldU.11 H*.11:
R*mow,11 Systlim CoollngW.11:ar Systlims RHotor Cool.1nt S}Slam Aottwtt, (N)
RHotor Cool.1nt Systam l.11-..g*
(N)
Last Modified: August 2, 2012 Radiation Safety Safeguards T
T 0 cc upat ional Public Radiation Radiation Security Safety Safety Legend : R=Red H=fflli te C'li'G=Creater Than Creen I=Inauffi c i ent Data *to Cal cul.ate. PI U=Ooique Deeign Y=Yel I OY C=Creen T=Ttnre ahol.de unde r deve.1opmen t N=Jifot Ap1pl i c.abl.e IJ:=Discrepant
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process
Crystal River 3 3Q/2012 Performance Summary Crystal River 3 has been shutdown since September 2009. Because the Unplanned Scrams with Complications (USwC) and Mitigating Systems Performance Index (MSPI) performance indicators (PIs) are heavily influenced by the operational status of the reactor, NRC staff has evaluated the validity of these PIs. Because the reactor has not been critical for two years, there have been no opportunities for a scram that would count in the USwC indicator.
Similarly, the MSPI values are skewed because of the very low number of critical hours in three years. For these reasons, the staff has determined that these PIs no longer provide valid indications of performance.
3Q/2012 Performance Summary - Crystal River 3 Page 1 of 3
3Q/2012 Performance Summary - Crystal River 3 Page 2 of 3 Initiating Events Unpl1nn1d S0r1m1(N)
Unpl1nn1d Pow1r Ch1ng11(N)
Unpl1nn1d S0r1m1wlth Compllo1tlon1(N)
~
Reactor Safety
~*~
Mitigating _.
Barrier Emergency Systems Integrity Preparedness Performance Indicators Em1rg1noy AC Pow1r s*m (N)
High PIIIIUl'II lnl1otlon Syltlim (N)
H11t R1mow1I S}S1:1m (N)
R11ldu1I Hilt R1mov1I Syltlim (N)
Coollng Wltlr S}Sl:1 m1 (N)
R11otor Cool1nt Syltlim Aotlvltv (N)
R11otor Cool1nt Syltlim Lla1111 (N)
Last Modified: October 24, 2012 Radiation Safety Safeguards T
T 0cc upat ional Public Radiation Radiation Security Safety Safety Legend : R=Red W=Whi t e G'l"G=Creabe r Than Gre en
! = I n suffi c i ent Da ta to Cal culat e PI U=Uni que Dea i,gn D=Di acrep ant Y=Yell ow G=Cre en
'l'=Threahol d a under d ev el opment N=Not Applicable
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 3Q/2012 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 4Q/2012 Performance Summary 4Q/2012 Performance Summary - Crystal River 3 Page 1 of 2 Inspection Findings
¥ Action Matrix Column:
Licensee Response Assessment Reports Reactor Radiation Initiating Events Unpl1nn1d S0r1m1(N)
Unpl1nn1d Pow1r Ch1ng11(N)
~ Mitigating Systems Last Modified: Febr1Jaty 19, 2013 Safety
~~
Barrier Emergency Integrity Preparedness Performance Indicators R11otor Cool1nt Symm Aotlvltv (N)
R11otor Cool1nt Symm Lllk1g1 (N)
Safety T
T 0cc upat ional Public Radiation Radiation Safety Safety Performance Indicators
¥ Safeguards Security CT-Oi-Oraater Than Ora1t1n I*In1u r ri c:i.n t Data to Calculate PI U-Unique Dali,qn
~
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 4Q/2012 Performance Summary - Crystal River 3 Page 2 of 2
Crystal River 3 1Q/2013 Performance Summary Crystal River 3 has been shutdown since September 2009. Because the Unplanned Scrams with Complications (USwC) and Mitigating Systems Performance Index (MSPI) performance indicators (PIs) are heavily influenced by the operational status of the reactor, NRC staff has evaluated the validity of these PIs. The NRC also discussed the question of PI validity with NEI and other external stakeholders during ROP working group meetings. Because the reactor has not been critical for over three years, there have been no opportunities for a scram that would count in the USwC indicator. Similarly, the MSPI values are skewed because of the very low number of critical hours in three years. For these reasons, the staff has determined that these PIs no longer provide valid indications of performance.
1Q/2013 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2013 Performance Summary - Crystal River 3 Page 2 of 3 Initiating Events
"' :. ":- ', ~.....................
1*'('1*.*:*.,,',.. :.................
"' :. ":- ', ~.....................
- *1::.:;y*:**.:******:~***~;.::::::::::::::::.
- ,,,.,
- ,:::*::::::::,r~::::r:.::,~:,:, 'I *~
~
Reactor Safety
~*~
Mitigating _.
Barrier Emergency Systems Integrity Preparedness Performance Indicators
-::t.:::~,.. :~.. ~: ~,r':i.',',',',',',',',',','
1111,.,,,,
(-
- .. :.. :~"~:':':::"~-':,*.,.,.,,,..,r
'r-*''''''''''''''''''''''''''''''''
- ~;
- *~. 1... *~
- .; ~.:,::/ ** /.:.:.:.:.:.:.:.:.:
- ... -*',11.';11,..................
~.... : '."= ' -...... "':'*"'..........
~~',"'.',"'.'.r :.. [:: "" !," * '"",".'"'
,.,_.::.1.1.'*'.:":"::..,.1"..:.1.. 1..........
..... :'.'.'.'.'.. *j''''''''''''''''''*
' : " ' ~...... ::.:~ * - " ' i. ""
,,r,., _
- [ '::::::::::::.:... :... ::.:*~:::........
... ~::,... *.*********************************************************************
- \\*{r ' "' ""~::: *.i... 1.':'.,,1.'1::*:*:*:
"' ~-*;i.. -. ', '"' ":":"' '~ J~ ;*....
- rl,*,.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.*.L**r Last Modified: April 23, 2013 Radiation Safety Safeguards T
T 0cc upat ional Public Radiation Radiation Security Safety Safety Legend : R=Red W=Whi t e G'l"G=Creabe r Than Gre en
! =I n suffi c i ent Da ta to Calculat e PI U=Uni que Oeai,gn Y=Yell ow G=Cre en
'l'=Threahol d a under d ev el opment N=Not Applicable D=Oi acrep ant
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2013 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 2Q/2013 Performance Summary 2Q/2013 Performance Summary - Crystal River 3 Page 1 of 3
2Q/2013 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W==Whi t e G'l"G=Gr,eat e r 'l'han Gr,een I = I n auffi c i ent Data t o Ca l cul a t e PI U=Un i q ue Dea i,gn Y=Yell ow G=Gr een T'='l'hreah o l d a unde r d ev e l opment N=Not Applicabl e D=Di a cre p ant Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating _.
Mitigating _.
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings 2012013 No findings I No ft'dlp Noft'ldlnp 1=-=
1=-=
1:.1=
1=-=
this quarter thls..-ter tHsquarter 1=-=
1=-=
1:.1=
1=-=
1012013 No findings I No ft'dlp Noft'ldlnp this quarter thls..-ter tHsquarter 1=-=
1=-=
1:.1=
1=-=
4012012 No findings I No ft'dlp Noft'ldlnp this quarter
- thls..-ter tHsquarter 3012012 No findings I No ft'dlp Noft'ldlnp 1=-=
1=-=
1:.1=
1=-=
this quarter thls..-ter tHsquarter Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: September 3, 2013
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 2Q/2013 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 3Q/2013 Performance Summary 3Q/2013 Performance Summary - Crystal River 3 Page 1 of 3
3Q/2013 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W==Whi t e G'l"G=Gr,eat e r 'l'han Gr,een I = I n auffi c i ent Data t o Ca l cul a t e PI U=Un i q ue Dea i,gn Y=Yell ow G=Gr een T'='l'hreah o l d a unde r d ev e l opment N=Not Applicabl e D=Di a cre p ant Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating _.
Mitigating _.
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings 2012013 No findings I No ft'dlp Noft'ldlnp 1=-=
1=-=
1:.1=
1=-=
this quarter thls..-ter tHsquarter 1=-=
1=-=
1:.1=
1=-=
1012013 No findings I No ft'dlp Noft'ldlnp this quarter thls..-ter tHsquarter 1=-=
1=-=
1:.1=
1=-=
4012012 No findings I No ft'dlp Noft'ldlnp this quarter
- thls..-ter tHsquarter 3012012 No findings I No ft'dlp Noft'ldlnp 1=-=
1=-=
1:.1=
1=-=
this quarter thls..-ter tHsquarter Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: December 3, 2013
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 3Q/2013 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 4Q/2013 Performance Summary 4Q/2013 Performance Summary - Crystal River 3 Page 1 of 3
4Q/2013 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W==Whi t e G'l"G=Gr,eat e r 'l'han Gr,een I = I n auffi c i ent Data t o Ca l cul a t e PI U=Un i q ue Dea i,gn Y=Yell ow G=Gr een T'='l'hreah o l d a unde r d ev e l opment N=Not Applicabl e D=Di a cre p ant Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating _.
Mitigating _.
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings 2012013 No findings I No ft'dlp Noft'ldlnp 1=-=
1=-=
1:.1=
1=-=
this quarter thls..-ter tHsquarter 1=-=
1=-=
1:.1=
1=-=
1012013 No findings I No ft'dlp Noft'ldlnp this quarter thls..-ter tHsquarter 1=-=
1=-=
1:.1=
1=-=
4012012 No findings I No ft'dlp Noft'ldlnp this quarter
- thls..-ter tHsquarter 3012012 No findings I No ft'dlp Noft'ldlnp 1=-=
1=-=
1:.1=
1=-=
this quarter thls..-ter tHsquarter Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: Febr1Jaty 24, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 4Q/2013 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W==Whi t e G'l"G=Gr,eat e r 'l'han Gr,een I = I n auffi c i ent Data t o Ca l cul a t e PI U=Un i q ue Dea i,gn Y=Yell ow G=Gr een T'='l'hreah o l d a unde r d ev e l opment N=Not Applicabl e D=Di a cre p ant Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating _.
Mitigating _.
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings 2012013 No findings I No ft'dlp Noft'ldlnp 1=-=
1=-=
1:.1=
1=-=
this quarter thls..-ter tHsquarter 1=-=
1=-=
1:.1=
1=-=
1012013 No findings I No ft'dlp Noft'ldlnp this quarter thls..-ter tHsquarter 1=-=
1=-=
1:.1=
1=-=
4012012 No findings I No ft'dlp Noft'ldlnp this quarter
- thls..-ter tHsquarter 3012012 No findings I No ft'dlp Noft'ldlnp 1=-=
1=-=
1:.1=
1=-=
this quarter thls..-ter tHsquarter Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Le gend : R=Red W=Whi te G'l'G=Gr,eater 'l'han Gr,een I = I n auffi ci ent Da ta to Ca l cul a t e PI U=Un i que Dea i,gn Y=Ye ll ow G=Gre en
'l'='l'hreahol d a unde r d e v e l opm=ll.t N=Not Applicabl e D=Di a cre p ant Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety Safeguards T
T 0cc upat ional Public Radiation Radiation Security Safety Safety Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Liilst Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/Inspection Plans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Le gend : R=Red W=Whi te G'l'G=Gr,eater 'l'han Gr,een I = I n auffi ci ent Da ta to Ca l cul a t e PI U=Un i que Dea i,gn Y=Ye ll ow G=Gre en
'l'='l'hreahol d a unde r d e v e l opm=ll.t N=Not Applicabl e D=Di a cre p ant Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety Safeguards T
T 0cc upat ional Public Radiation Radiation Security Safety Safety Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Liilst Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/Inspection Plans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Le gend : R=Red W=Whi te G'l'G=Gr,eater 'l'han Gr,een I = I n auffi ci ent Da ta to Ca l cul a t e PI U=Un i que Dea i,gn Y=Ye ll ow G=Gre en
'l'='l'hreahol d a unde r d e v e l opm=ll.t N=Not Applicabl e D=Di a cre p ant Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety Safeguards T
T 0cc upat ional Public Radiation Radiation Security Safety Safety Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Liilst Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/Inspection Plans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W=Wh i t e G~Gr eat e r 'l'han Gr,een I =I n auffi c i ent Data to Calculat e PI U=Uni que Deai,gn O=Diacrep ant Y=Yellow G=Green
'l'='l'hreahol d a unde r devel opment N=Not Applicable Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety Safeguards T
T Occupational Public Radiation Radiation Security Safety Safety Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/Inspection Plans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W=Wh i t e G~Gr eat e r 'l'han Gr,een I =I n auffi c i ent Data to Calculat e PI U=Uni que Deai,gn O=Diacrep ant Y=Yellow G=Green
'l'='l'hreahol d a unde r devel opment N=Not Applicable Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety Safeguards T
T Occupational Public Radiation Radiation Security Safety Safety Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/Inspection Plans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W=Wh i t e G~Gr eat e r 'l'han Gr,een I =I n auffi c i ent Data to Calculat e PI U=Uni que Deai,gn O=Diacrep ant Y=Yellow G=Green
'l'='l'hreahol d a unde r devel opment N=Not Applicable Initiating Events Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Radiation Safety Safeguards T
T Occupational Public Radiation Radiation Security Safety Safety Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-=
1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/Inspection Plans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W=Whi t e G'l"G=Gr,eat e r 'l'han Gr,e en I = I n auffi c i ent Da ta to Ca l cul a t e PI U=Uni que Dea i,gn Y=Ye ll ow G=Green
'l'='l'hre ahol d a unde r d e v e l opment N=Not Applicabl e D=Di acrepant Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating _.
Mitigating _.
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W=Whi t e G'l"G=Gr,eat e r 'l'han Gr,e en I = I n auffi c i ent Da ta to Ca l cul a t e PI U=Uni que Dea i,gn Y=Ye ll ow G=Green
'l'='l'hre ahol d a unde r d e v e l opment N=Not Applicabl e D=Di acrepant Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating _.
Mitigating _.
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W=Whi t e G'l"G=Gr,eat e r 'l'han Gr,e en I = I n auffi c i ent Da ta to Ca l cul a t e PI U=Uni que Dea i,gn Y=Ye ll ow G=Green
'l'='l'hre ahol d a unde r d e v e l opment N=Not Applicabl e D=Di acrepant Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating _.
Mitigating _.
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W=Whi t e G'l"G=Gr,eat e r 'l'han Gr,e en I = I n auffi c i ent Da ta to Ca l cul a t e PI U=Uni que Dea i,gn Y=Ye ll ow G=Green
'l'='l'hre ahol d a unde r d e v e l opment N=Not Applicabl e D=Di acrepant Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating _.
Mitigating _.
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
Crystal River 3 1Q/2014 Performance Summary 1Q/2014 Performance Summary - Crystal River 3 Page 1 of 3
1Q/2014 Performance Summary - Crystal River 3 Page 2 of 3 Legend : R=Red W=Whi t e G'l"G=Gr,eat e r 'l'han Gr,e en I = I n auffi c i ent Da ta to Ca l cul a t e PI U=Uni que Dea i,gn Y=Ye ll ow G=Green
'l'='l'hre ahol d a unde r d e v e l opment N=Not Applicabl e D=Di acrepant Reactor Safety Radiation Safety Safeguards
~~
T T
Initiating _.
Mitigating _.
Barrier Emergency Events Systems Integrity Preparedness 0cc upat ional Public Radiation Radiation Safety Safety Security Most Significant Inspection Findings 20!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
10!20131=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
40!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
30!20121=-= 1=-= 1=-= 1=-= 1=-= 1=-= 1=-=
Miscellaneous findings Additional Inspection & Assessment Information
+ Assessment Reports/Inspection Plans:
20/2013 10/2013 40/2012 30/2012
+ Cross Reference Of Assessment Reports Last Modified: May 30, 2014
+ List of Inspection Reports (IR)
+ List of Security IR Cover Letters
+ List of Assessment Letters/I nsp e cti on PI ans
+ Baseline Inspection Completion Information
Action Matrix Summary l Inspection Findings Summary l PI Summary l Reactor Oversight Process 1Q/2014 Performance Summary - Crystal River 3 Page 3 of 3
[an error occurred while processing this directive]
Home > Nuclear Reactors > Operating Reactors > Reactor Oversight Process > Plant Summaries > Crystal River 3 -
Quarterly Performance Summary Crystal River 3 - Quarterly Performance Summary 1Q/2014 Performance Summary Page 1 of 3 NRC: Crystal River 3 - Quarterly Performance Summary 10/19/2017 https://www.nrc.gov/reactors/operating/oversight/cr3/cr3-chart.html
Page 2 of 3 NRC: Crystal River 3 - Quarterly Performance Summary 10/19/2017 https://www.nrc.gov/reactors/operating/oversight/cr3/cr3-chart.html Initiating Events Unpl.1nnad 8or,11n1(1)
Unpl.1nnadP_,
Ch.1nga(I)
Unpl.1nnad 8or,11n1111111h Compllodons (I)
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators 8,lfq'Symm Funolon.11 f,1llura(I)
HlghP-111 lnJ*olon Symm (I)
H*.ll:R*mow,11
&ymm(I)
Rllllldu..l H*.11:
R*mow,11 Symm (I)
CoollngWnr Symms(I)
RHotor Cool.1nt
&ymm Aottwtt, RHotor Cool.1nt Symm Lli-..11*
(I)
DIIIIIExilrolN P*lformHH (I)
ERODIIII P.1lllolpdon (I)
Al*ll:.1nd NotHlodon Symm(I)
Last Modified: April 23, 2014 Radiation Safety T
0cc upat ional Radiation Safety Oooupdon.11 ElicpOIUIII Control Efltiotlnn- (I)
T Public Radiation Safety RETSIODCM R.1dlologlHI Efflu.nt(I)
Safeguards Security Protllotlld ArH Equlpm*nt (I)
Legend : R=Red W'=Whi t e G'l'IG=Gr eat e r Than Gr een
! =I n suffi c i ent Data to Ca l cul ate PI U=Un i que Desi gn D=Di sc-r,epant Y=Yellow G=Green
'!'=Threshol ds unde r d ev e l opment N=Not Applicabl e
Page Last Reviewed/Updated Wednesday, June 07, 2017 Page 3 of 3 NRC: Crystal River 3 - Quarterly Performance Summary 10/19/2017 https://www.nrc.gov/reactors/operating/oversight/cr3/cr3-chart.html
[an error occurred while processing this directive]
Home > Nuclear Reactors > Operating Reactors > Reactor Oversight Process > Plant Summaries > Crystal River 3 -
Quarterly Performance Summary Crystal River 3 - Quarterly Performance Summary 1Q/2014 Performance Summary Page 1 of 3 NRC: Crystal River 3 - Quarterly Performance Summary 04/19/2018 https://www.nrc.gov/reactors/operating/oversight/cr3/cr3-chart.html
Page 2 of 3 NRC: Crystal River 3 - Quarterly Performance Summary 04/19/2018 https://www.nrc.gov/reactors/operating/oversight/cr3/cr3-chart.html Initiating Events Unpl.1nnad 8or,11n1(1)
Unpl.1nnadP_,
Ch.1nga(I)
Unpl.1nnad 8or,11n1111111h Compllodons (I)
Reactor Safety Mitigating Systems Barrier Integrity Emergency Preparedness Performance Indicators 8,lfq'Symm Funolon.11 f,1llura(I)
HlghP-111 lnJ*olon Symm (I)
H*.ll:R*mow,11
&ymm(I)
Rllllldu..l H*.11:
R*mow,11 Symm (I)
CoollngWnr Symms(I)
RHotor Cool.1nt
&ymm Aottwtt, RHotor Cool.1nt Symm Lli-..11*
(I)
DIIIIIExilrolN P*lformHH (I)
ERODIIII P.1lllolpdon (I)
Al*ll:.1nd NotHlodon Symm(I)
Last Modified: April 23, 2014 Radiation Safety T
0cc upat ional Radiation Safety Oooupdon.11 ElicpOIUIII Control Efltiotlnn- (I)
T Public Radiation Safety RETSIODCM R.1dlologlHI Efflu.nt(I)
Safeguards Security Protllotlld ArH Equlpm*nt (I)
Legend : R=Red W'=Whi t e G'l'IG=Gr eat e r Than Gr een
! =I n suffi c i ent Data to Ca l cul ate PI U=Un i que Desi gn D=Di sc-r,epant Y=Yellow G=Green
'!'=Threshol ds unde r d ev e l opment N=Not Applicabl e
Page Last Reviewed/Updated Monday, November 06, 2017 Page 3 of 3 NRC: Crystal River 3 - Quarterly Performance Summary 04/19/2018 https://www.nrc.gov/reactors/operating/oversight/cr3/cr3-chart.html