ML20289A671
Jump to navigation
Jump to search
| ML20289A671 | |
| Person / Time | |
|---|---|
| Issue date: | 10/08/2020 |
| From: | Julio Lara NRC/RGN-III |
| To: | |
| Kichline M | |
| Shared Package | |
| ML20289A715 | List: |
| References | |
| Download: ML20289A671 (1) | |
Text
FLEX Summit - FLEX operational Experience NRC Perspectives Julio Lara, Director, Division of Reactor Projects, Region III Information Notice NRC INFORMATION NOTICE 2020-XX: FLEX Diesel Generator Operational Challenges maintain control of design characteristics, maintenance, testing, and modifications of FLEX equipment factory setpoints can result in unintended trip signals establish, document, and maintain accurate design requirements Regional Challenges understanding the reliability/availability of FLEX equipment learning curve to understand plant-specific FLEX strategies and equipment understanding FLEX risk importance FLEX - Order and rule are performance-based and not overly prescriptive