Text

m

~

V 0

0 P-I 4 STM GEN HI-HI LEVEL (SHEET 7 )

1 NOTE 9 l SAFETY INJECT I ON 1 SHEET 8 >

1 NOTE 9)

REDUNDANT P-4 REACTOR TRIP (SHEET 2>

1 NOTE 9 >

MANUAL RESET

( NOTE 4 >

CLOSE ALL FEEDWATER ISOLATION VALVES 10C>

1 NOTE 8)

TRIP ALL FEEDWATER PUMPS (NOTE 3)

TURBINE (SHrnt l6 )

1 NOTE 9)

LOOP 3 & 4 INTERLOCK ISHEETI41 (NOTE 9>

I I

I I

I I

I I

I I

I I

\\,,, +

,)

I

+//

I

~---------v : _________ J I

I I

I

_____________ ~9+ ____________ J LOW TAVG 1SHEET 5>

( NOTE 9>

0-------+

1 NOTE I 2 l

~

I I

I I

I I

~!

~

i I

I I

I I

I I

I I

I I

I 3 I

I I

I I

1 +~,.s I

I I

I I

I 0--~

I I

I


MANUAL t, P 1

SETPOINT

~--0 (FROM MCB>

I I

AUTO/MANUAL FEEDPUMP,:.p SETPOINT SELECT

( FROM MCB >

i __ _____ G I

I I

L------------------------------------------------------------+----0 REDUNDANT K

K 3tz J{' I I

I I

I PUMP IN MANUAL ro{\\

1

~ I OR PUMP 2 RAMP I NG j DOWN TO 0%

I I

I I

I I

I I

I


~ K,

+

1 1 I ( NOTE K

3 l35S FEEOWATER BYPASS VALVE POSITION DEMAND SIGNAL 1SHEET21)

(NOTE 9>

l------i-------

I I

I I

FEEDWATER MA I N VALVE POSITION DEMAND S I GNAL

( SHEET 2 I )

( NOTE 9 >

1 NOTE I>

I 00 I

I I

I 1----------------------7 I

FWP TRIP FROM---' 0 \\

O J

>65% POWER 7

( NOTE I 3) 1 I

B I

I I

I I

I I

I I

I I

I I

MASTER AUTO/MANUAL STATION I_ --- --- ---- --...J I

I

+----CD I

I I

I 4)

(NOTE 15>

MANUAL SPEED B I AS I

I 1--------------------------------------------------______j_____l_

I FROM MCB >

I 0\\ 0[

1 BOTH PUMPS IN AUTO & ____

POWER < 30% ( NOTE I 6 l I

I 0-I I

I I

I I

FEEDPUMP LIP SETPOINT 1 SHEET 20 >

MANUA L SPEED BIAS (FROM MCB)

I I f----0 I

FEEDWATER BYPASS VALVE POSITION DEMAND SIGNAL 1 SHEET 2 I )

1NOTE 9)

I I

I NOTES I. ANALOG GATE CONSISTS OF 2 SOLENOID VENT VALVES IN SERIES TO REDUNDANTLY I NTERLOCK THE AIR L JNE BETWEEN EACH VALVE DIAPHRAM AND ITS ASSOCIATED POSITJONER, THE SOLENOID VALVES ARE DE-ENERGIZED TO VENT, CAUSING THE MA I N FEEDWATER VALVE TO CLOSE IN 7 SECONDS.

2. ALL CI RCUITS IN TH I S SHEET ARE NOT REDUNDANT EXCEPT WHERE INDICATED "REDUNDUNT".
3. DELETED
4.

THE REDUNDANT MANUAL RESET CONSISTS OF TWO MOMENTARY CONTROLS ON THE CONTROL BOARD, ONE OF EACH TRAIN.

5. OPEN/S HUT I ND I CAT I ON FOR EACH FEEOWATER CONTROL VALVE IN CONTROL ROOM.

6.

7, FEEDWATER PUMPS ARE TRIPPED BY TRAIN "B" ONLY.

8, FEEDWATER I SO LA T I ON VALVES ARE CLOSED BY TRAIN "A" ONLY.

9. SHEET NUMBERS REFER TO THE REFERENCE NUMBERS BELOW.
10. WHENEVER A PROCESS SIGNAL IS USED FOR CONTROL AND IS DERIVED FROM A PROTEC T ION
CHANNEL, I SOL AT I ON MUST BE PROV I OED.

I I_

TH !S DRAWING ILLUSTRATES THE FUNCT !ONAL REQUIREMENTS OF THE REACTOR CONTROL AND PROTECTION SYSTEM.

THIS DRAWING DOES NOT REPRESENT ACTUAL HARDWARE IMPLEMENTATION.

FOR HARDWARE IMPLEMENTATION. REFER TO THE APPLICABLE SCHEMAT I C.

12. BOARD INDICATION IS FROM A DFWCS OUTPUT. ALL OTHER INDICA T IONS ON THIS DRAWING ARE PROV I OED ON THE DFWCS HM!.
13. RESETS WHEN Pl CONTROLLER OUTPUT REACHES 1003/4. ALSO SETS PUMP BIASES TO Q_

14 _ TRACKS HIGHER FWP A/M STATION DEMAND WHEN BOTH PUMPS ARE IN MANUAL -

15. SWITCHES TO MANUAL WHEN BOTH FWP A/M STATIONS ARE IN MANUAL.
16. RAMPS PUMP 2 DEMAND TO 0%. ONCE PUMP 2 JS AT 01/.,

SWITCHES ITS AIM STATION TO MANUAL -

17. TRACKS ACTUAL PUMP SPEED WHEN WOODWARD FPSCS IS IN LOCAL MANUAL OR PRESSURE LI Ml TI NG_

AIM GOES TO MANUAL WHEN I T COMES OUT OF TRACK MODE WI TH DEMAND O

ACTUAL SPEED AT TIME OF TRANSITION.

18. REFER TO THE DFWCS FUNCTIONAL REQUIREMENTS DOCUMENT DRAWING 663195-27 FOR LOGIC DESCRIPTION.

FEEDWATER MAIN VALVE POSITION DEMAND SIGNAL (SHEET 211

( NOTE 9 I

~

REDUNDANT

~ __,x 1----(J I

I

~---- -, - -----

1 REDUNDANT I

I FWP A AUTO/MANUAL 1 NOTE I 7 & 18 >

STATION I

~-----0 FWP B AUTO/MANUAL STATION

~-~,-~

I

____ _.J (NOTE 17 & 18) t------0 L~

"'- REDUNDANT L__o,Xf---1_ ---J ~

I MODULATE FEEDWATER BYPASS VALVE FCV-I 5 I 0 (NOTE 5>

I I

MODULATE FEEOWATER MAIN VALVE FCV-5 1 0 (NOTE 51 I

FEEDWATER PUMP A SPEED DEMAND FEEDWATER PUMP B SPEED DEMAND I

I I

I I

I MODULATE MODULATE FEEOWATER FEEOWATER BYPASS VALVE 2 MAIN VALVE 2 FCV-I 520 FCV-520 (NOTE 5>

(NOTE 51 REFERENCES (NOTE 9)

WE DWG PG&E DWG I. FUNCTIONAL LOGIC DIAGRAM INDEX AND SYMBOLS_

_ _______ _________ _ 5653074-I _

______ 49S84 I 2, FUNCTIONAL LOGIC DIAGRAM REACTOR TRIP SIGNALS__

_ _ ______ __ ___ ___ __ __________ 5653074-2 _______ 495842

3. FUNCTIONAL LOGIC DI AGRAM NUCLEAR INSTR ANO MANUAL TR IP SIGNALS ____________________________ 5653074-L ________ 49584 3
4. FUNCTIONAL LOGIC DIAGRAM NUCLEAR INSTR PERMISSIVES AND BLOCKS
5. FUNCTIONAL LOGIC DIAGRAM PRIMARY COOLANT SYSTEM TRIP SIGNALS _

5653D74 - 4_

__ 495844

--- ------ --- --------- 5653074-5 __ ---- _ 495845

6. FUNCTIONAL LOGIC DI AGRAM PRES SUR I 2ER TR IP SIGNALS ----------------------------------------------- 5653D74-6 _________ 495846
7. FUNCTIONAL LOGIC DI AGRAM STEAM GENERATOR TR IP SIGNALS ------------------------------------------ 5653DT4-7 ---------* 495847
8. FUNCTIONAL LOGIC DI AGRAM SAFEGUARDS ACTUATION SIGNALS __

_ __ 5653D74-8 __________ 495848

9. FUNCTIONAL LOGIC DIAGRAM ROO CONTROLS AND ROO BLOCKS ___________________________________________ 5653074-9 __________ 495849 I 0. FUNCTIONAL LOGIC DI AGRAM STEAM DUMP CONTROL --------------------------------------------------------- 565307 4 - I O ________ 4 95850 I I. FUNCT !ONAL LOGIC DI AGRAM PRESSURIZER PRESSURE AND LEVEL CONTROL

__________________________ 5653074-I I ________ 495851

12. FUNCTIONAL LOGIC DIAGRAM PRESSURIZER HEATER CONTROL

__ _ 5653074-12 __ ____ 49S852

13. FUNCTIONAL LOGIC DI AGRAM FEEDWATER CONTROL AND I SOL AT JON *------------------------------------ 5653D7 4-I 3 ________ 495853
14. FUNCTIONAL LOGIC O I AGRAM FEEDWATER CONTROL ANO ISOLATION *------------------------------------ 5653074 - I 4 ________ 495854 I 5. FUNCT !ONAL LOGIC O I AGRAM AUXILIARY FEEDWATER PUMPS ST ART UP ---------------------------------- 5653074-IS ________ 495855
16. FUNCTIONAL LOGIC DIAGRAM TURBINE TRIPS, RUNBACKS & SIGNALS 5653D74-!6 ____

495856

17. FUNCTIONAL LOGIC DI AGRAM AMSAC SIGNALS *--------------------------------------------------------------- 5653074-I 7 ________ 49585 7
18. FUNCTIONAL LOGIC DI AGRAM SEISMIC TR IP --------------------------------

_____ 8759D77 ____________ 49S858

19. FUNCTIONAL LOGIC DIAGRAM DIGITAL FW CONT SYS INPUT SIGNAL VALIOATION ___ _

__ 5653074-!8 ___ ____ 495859

20. FUNCTIONAL LOGIC DIAGRAM DIGITAL FW CONT SYS FW FLOW CONTROLLER & Cv DEMAND _________ 5653074-!9 ________ 495860
21. FUNCTIONAL LOGIC DIAGRAM DIGITAL FW CONT SYS CONT VCV SEO & TRACKING LOGIC ___________ 5653D74 - 20 ________ 495861
22. FUNCTIONAL LOGIC DIAGRAM DIGITAL FW CONT SYS SIGNAL SELECTOR LOGJC _______________________ 5653074-21 ________ 495862
23. DRAWING INDEX SOLID STATE PROTECTION SYS INTERCONNECTION & SCHEM. DIAGRAM----

- )08D442-1 ________ 458826 NUCLEAR SAFETY RELATED OL04

"'