ML20268A351

From kanterella
Jump to navigation Jump to search
Submittal of Rev. 25 to Updated Final Safety Analysis Report
ML20268A351
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/10/2020
From: Gerfen P
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML20268B299 List: ... further results
References
DCL-20-075
Download: ML20268A351 (14)


Text

m contains Sensitive Information - Withhold Under 10 CFR 2.390 When separated from Enclosure 3, this cover letter is decontrolled.

Pacific Gas and Electric Company,;,.

September 10, 2020 PG&E Letter DCL-20-075 Paula Gerten Site Vice President Diablo Canyon Power Plant Mail code 104/6/605 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 805.545.4234 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.4 10 CFR 50.54 10 CFR 50.71 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Submittal of Updated Final Safety Analysis Report, Revision 25

References:

1. PG&E Letter DCL-20-042, "Request for One-Time Exemption from 10 CFR 50.71(e)(4) UFSAR and TS Bases Update Requirements,"

dated May 14, 2020, ADAMS Accession No. ML20135H021

2. NRC Letter, "Diablo Canyon Nuclear Power Plant, Units 1 and 2 -Approval of Exemption from the Requirements of 10 CFR 50.71 (e)(4) (EPID L-2020-LLE-0059 [COVID-19])," dated June 2, 2020, ADAMS Accession No. ML20140A356

Dear Commissioners and Staff:

Pursuant to 10 CFR 50.71 (e), 10 CFR 50.54(a)(3), and 10 CFR 50.4(b)(6), Pacific Gas arid Electric Company (PG&E) hereby submits Diablo Canyon Power Plant (DCPP) "Updated Final Safety Analysis Report" (UFSAR), Revision 25. In Reference 1, PG&E requested an exemption that would allow, on a one-time basis, the routine biennial UFSAR update to be submitted past its original due date, but still within 24 months of the previous submittal. T~e NRC granted the exemption in Reference 2. contains a summary of changes to the UFSAR resulting from 10 CFR 50.59 evaluations. Enclosure 2 provides a list of license amendments that resulted in changes incorporated into Revision 25 of the DCPP UFSAR. contains the DCPP UFSAR, Revision 25, including the drawings listed on UFSAR Table 1.6-1, on one Digital Versatile Disc (DVD), labeled "Diablo Canyon Power Plant UFSAR, Revision 25 (non-redacted), dated June 2020." The contents are in Adobe Acrobat portable document format. Enclosure 3 contains sensitive A

member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek contains Sensitive Information - Withhold Under 10 CFR 2.390 When separated from Enclosure 3, this cover letter is decontrolled.

_M5_:)

pJ/4.~

contains Sensitive Information - Withhold Under 1 0 CFR 2.390 When separated from Enclosure 3, this cover letter is decontrolled.

Document Control Desk PG&E Letter DCL-20-075 September 10, 2020 Page2 information and should be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1 ). provides a list of the information that has been redacted in accordance with NRC Regulatory Issue Summary (RIS) 2015-17, "Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents." contains one DVD for DCPP UFSAR, Revision 25, with the redacted information identified in Enclosure 4 removed. This DVD is labeled, "Diablo Canyon Power Plant UFSAR, Revision 25 (redacted), dated June 2020." contains a description of the information that has been removed from the UFSAR in accordance with Appendix A of Nuclear Energy Institute (NEI)

Guideline 98-03, Revision 1, "Guidelines for Updating Final Safety Analysis Reports." Deletions and additions are identified by revision bars on the right side of the associated pages of the UFSAR.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions regarding this submittal, please contact Mr. Jim Morris at (805) 545-4609.

This certifies, to the best of my judgement and belief, that Revision 25 of the DCPP UFSAR accurately presents changes that were incorporated into the UFSAR as of February 2020.

Sincerely, Paula Gerten Site Vice President armb/50943987-02 Enclosures cc:

Diablo Distribution cc/enc:

Samson S. Lee, NRC Project Manager Scott A. Morris, NRC Region IV Ad_ministrator Christopher W. Newport, NRC Senior Resident Inspector A

member of the STARS Alliance Callaway

  • Dlablo Canyon
  • Palo Verde
  • Wolf Creek contains Sensitive Information - Withhold Under 10 CFR 2.390 When separated from Enclosure 3, this cover letter is decontrolled.

PG&E Letter DCL-20-075 Changes Incorporated into the Diablo Canyon Power Plant Updated Final Safety Analysis Report, Revision 25 Resulting from 10 CFR 50.59 Evaluations

LBIE Number(1l PG&E Letter DCL-20-075

- Changes Incorporated into the Diablo Canyon Power Plant Updated Final Safety Analysis Report, Revision 25 Resulting from 10 CFR 50.59 Evaluations Description 2018-009 Incorporated the movement of 480V Switchgear Rooms and 125VDC Inverter Room Ventilation System fans to the roof of the Auxiliary Building.

Added crediting manual operator actions following a design basis tornado and crediting notification of tornado warning/watch as a means of triggering initiation of manual operator actions.

2018-010 Revised the 4.16-kV Switchgear and Cable Spreading Room design basis temperature limit from 104F to 116F and credit natural circulation to maintain the rooms' design basis temperature.

Modified the 4.16-kV Switchgear Heating, Ventilation, and Air Conditioning (HVAC) system to no longer normally operate in automatic mode and to maintain the HVAC exhaust fire damper normally closed.

2019-003 Revised safety analysis to describe that the evaluations in Westinghouse Report PGE-10-54 are credited to bound and increase of Emergency Core Cooling System Component Actuation Delay Time.

2018-002 Removed the interlocks associated with stem-mounted Namco limit switches for eight Unit 1 Emergen*cy Core Cooling System valves 2017-019*

Allowed on a case-by-case basis, a normally open valve or no valve at the point where systems transition from PG&E Design Class I to a lower classification.

(1> 10 CFR 50.59 Licensing Basis Impact Evaluation Number

  • The change that is associated with this LBIE was incorporated in Revision 24 of the UFSAR.

Page 1 of 1

1 Enclosure 2 PG&E Letter DCL-20-075 License Amendments (LAs) that Resulted in Changes Incorporated into Revision 25 of the DCPP Updated Final Safety Analysis Report PG&E Letter DCL-20-075 License Amendments (LAs) that Resulted in Changes Incorporated into Revision 25 of the DCPP Updated Final Safety Analysis Report Unit 1 LA Unit 2 LA 230 232 Description Incorporation of Alternate Source Term (CAC Nos.

MF6399 AND MF6400)

Page 1 of 1 contains Sensitive Information - Withhold Under 10 CFR 2.390 Digital Versatile Disc Diablo Canyon Power Plant PG&E Letter DCL-20-075 Diablo Canyon Power Plant Updated Final Safety Analysis Report, Revision 25 (non-redacted), dated June 2020 contains Sensitive Information - Withhold Under 10 CFR 2.390 contains Sensitive Information - Withhold Under 10 CFR 2.390 The DVD in this enclosure contains the following files:

File Name File Size (Mb}

Chapter 1 3.89 Chapter 2 25.0 Chapter 3 29.5 Chapter 4 4.81 Chapter 5 2.79 Chapter 6 15.1 Chapter 7 1.91 Chapter 8 2.18 Chapter 9 5.77 Chapter 10

.944 Chapter 11 3.87 Chapter 12 3.19 Chapter 13

.516 Chapter 14 1.32 Chapter 15 5.74 Chapter 16

.100 Chapter 17

.344 Table 1.6-1 Drawings 701 PG&E Letter DCL-20-075 contains Sensitive Information - Withhold Under 10 CFR 2.390 Page 1 of 1

---7 PG&E Letter DCL-20-075 List of Information Redacted from Updated Final Safety Analysis Report, Revision 25 in Accordance with RIS 2015-17 PG&E Letter DCL-20-075 List of Information Redacted from Updated Final Safety Analysis Report, Revision 25 in Accordance with RIS 2015-17 Information Withheld Description Figures 6.2-53, 6.2-54, 6.2-55, and 6.2-56 Containment subcompartment analyses drawings.

Figures 12.1-1, 12.1-2, 12.1-3, 12.1-4, 12.1-Radiation zone maps that contain 5, 12.1-6, 12.1-7, 12.1-8, 12.1-9, 12.1-10, general arrangement features.

12.1-11, 12.1-12 Drawings:

Engineering drawings 57722-1, 57723-1, 57724-1, 57725-1, incorporated by reference.

57726-1, 57727-1, 57728-1, 500966-1, 500971-1, 500977-1, 515939-1, 515940-1, 515941-1, 515942-1, 515947-1, 521123-1, 521124-1, 500968-1, 57721-1, 57720-1, 57719-1, 57718-1, 500967-1, 500965-1, 500964-1, 57729-1, 57730-1, 57731-1, 57732-1, 57733-1, 57734-1, 500969-1, 500972-1, 500973-1, 50097 4-1, 500976-1, 102023-6, 108023-6, 102023-8, 108023-8, 102023-9, 108023-9, 102023-11, 108023-11, 102023-12, 108023-12, 102023-16, 102023-17C, 102023-17; 102023-18, 108023-18, 515943-1, 515944-1, 515945-1, 515946-1, 515948-1, 515949-1, 438431-1, 438432-1,439533-1,438449-1,438445-1, 507613-1, 521120-1, 521130-1, 521121-1, 521131-1, 521122-1, 521132-1, 521133-1, 521134-1, 521125-1, 521135-1, 508845-1, 500002-1, 500852-1, 498992-1, 498993-1, 500003-1, 500853-1, 663082-2, 502699-1 Page 1 of 1

Digital Versatile Disc Diablo Canyon Power Plant PG&E Letter DCL-20-075 Diablo Canyon Power Plant Updated Final Safety Analysis Report, Revision 25 (redacted), dated June 2020

PG&E Letter DCL-20-075 The DVD irt this enclosure contains the following files:

File Name File Size (Mb)

Chapter 1 3.89 Chapter 2 25.0 Chapter 3 29.5 Chapter4 4.81 Chapter 5 2.79 Chapter 6

/14.0 Chapter 7 1.91 Chapter 8 2.18 Chapter 9 5.77 Chapter 10

.944 Chapter 11 3.87 Chapter 12 1.12 Chapter 13

.516 Chapter 14 1.32 Chapter 15 5.74 Chapter 16

.100 Chapter 17

.336 Table 1.6-1 Drawinas 602 Page 1 of 1 PG&E Letter DCL-20-075 Description of Information Removed from Revision 25 of the Updated Final Safety Analysis Report Page 2 of 2 PG&E Letter DCL-20-075 Description of Information Removed from Revision 25 of the Updated Final Safety Analysis Report Figures 9.1-9A & 9.19B Figures 9.5.5 & 9.5.6 Sections 13.1 &17.1, and Figures 17.1-2 & 13.1-5 Deleted figures due to spent fuel pool bridge crane upgrade Deleted due to transition from Appendix R to NFPA 805 Deleted the Director of Strategic Projects-due to an organization change Page 1 of 1