|
---|
Category:General FR Notice Comment Letter
MONTHYEARML20275A3342020-09-30030 September 2020 Comment (4675) E-mail Regarding Holtec-CISF Draft EIS ML20275A3242020-09-29029 September 2020 Comment (4674) E-mail Regarding Holtec-CISF Draft EIS ML20272A0432020-09-25025 September 2020 Comment (4672) E-mail Regarding Holtec-CISF Draft EIS ML20269A4542020-09-24024 September 2020 Comment (4665) E-mail Regarding Holtec-CISF Draft EIS ML20272A0422020-09-24024 September 2020 Comment (4671) E-mail Regarding Holtec-CISF Draft EIS ML20272A0412020-09-24024 September 2020 Comment (4670) E-mail Regarding Holtec-CISF Draft EIS ML20269A4642020-09-24024 September 2020 Comment (4669) E-mail Regarding Holtec-CISF Draft EIS ML20269A4632020-09-24024 September 2020 Comment (4668) E-mail Regarding Holtec-CISF Draft EIS ML20269A4612020-09-24024 September 2020 Comment (4667) E-mail Regarding Holtec-CISF Draft EIS ML20269A4552020-09-24024 September 2020 Comment (4666) E-mail Regarding Holtec-CISF Draft EIS ML20269A4532020-09-24024 September 2020 Comment (4664) E-mail Regarding Holtec-CISF Draft EIS ML20269A4492020-09-23023 September 2020 Comment (4660) E-mail Regarding Holtec-CISF Draft EIS ML20269A4142020-09-23023 September 2020 Comment (4646) E-mail Regarding Holtec-CISF Draft EIS ML20267A1902020-09-23023 September 2020 Comment (111) from Pia Salazar on Holtec International HI-STORE Consolidated Interim Storage Facility Project ML20269A3742020-09-23023 September 2020 Comment (4632) E-mail Regarding Holtec-CISF Draft EIS ML20267A1922020-09-23023 September 2020 Comment (112) from Angela Dominguez on Holtec International HI-STORE Consolidated Interim Storage Facility Project ML20267A2042020-09-23023 September 2020 Comment (113) from Zoilo Dominguez on Holtec International HI-STORE Consolidated Interim Storage Facility Project ML20269A3982020-09-23023 September 2020 Comment (4642) E-mail Regarding Holtec-CISF Draft EIS ML20267A1752020-09-23023 September 2020 Comment (105) from Lonnie Clark on Holtec International HI-STORE Consolidated Interim Storage Facility Project ML20269A3972020-09-23023 September 2020 Comment (4641) E-mail Regarding Holtec-CISF Draft EIS ML20269A3622020-09-23023 September 2020 Comment (4627) E-mail Regarding Holtec-CISF Draft EIS ML20269A4152020-09-23023 September 2020 Comment (4647) E-mail Regarding Holtec-CISF Draft EIS ML20269A4502020-09-23023 September 2020 Comment (4661) E-mail Regarding Holtec-CISF Draft EIS ML20269A3892020-09-23023 September 2020 Comment (4637) E-mail Regarding Holtec-CISF Draft EIS ML20269A4202020-09-23023 September 2020 Comment (4649) E-mail Regarding Holtec-CISF Draft EIS ML20269A4522020-09-23023 September 2020 Comment (4663) E-mail Regarding Holtec-CISF Draft EIS ML20269A4512020-09-23023 September 2020 Comment (4662) E-mail Regarding Holtec-CISF Draft EIS ML20269A4452020-09-23023 September 2020 Comment (4659) E-mail Regarding Holtec-CISF Draft EIS ML20269A4442020-09-23023 September 2020 Comment (4658) E-mail Regarding Holtec-CISF Draft EIS ML20269A4432020-09-23023 September 2020 Comment (4657) E-mail Regarding Holtec-CISF Draft EIS ML20269A4422020-09-23023 September 2020 Comment (4656) E-mail Regarding Holtec-CISF Draft EIS ML20269A4332020-09-23023 September 2020 Comment (4655) E-mail Regarding Holtec-CISF Draft EIS ML20269A4322020-09-23023 September 2020 Comment (4654) E-mail Regarding Holtec-CISF Draft EIS ML20269A4312020-09-23023 September 2020 Comment (4653) E-mail Regarding Holtec-CISF Draft EIS ML20269A4242020-09-23023 September 2020 Comment (4652) E-mail Regarding Holtec-CISF Draft EIS ML20269A4222020-09-23023 September 2020 Comment (4651) E-mail Regarding Holtec-CISF Draft EIS ML20269A4212020-09-23023 September 2020 Comment (4650) E-mail Regarding Holtec-CISF Draft EIS ML20269A4122020-09-23023 September 2020 Comment (4645) E-mail Regarding Holtec-CISF Draft EIS ML20267A1882020-09-23023 September 2020 Comment (110) from Jesus Salazar on Holtec International HI-STORE Consolidated Interim Storage Facility Project ML20267A1792020-09-23023 September 2020 Comment (108) from Erica Gray on Holtec International HI-STORE Consolidated Interim Storage Facility Project ML20269A3342020-09-23023 September 2020 Comment (4621) E-mail Regarding Holtec-CISF Draft EIS ML20269A3352020-09-23023 September 2020 Comment (4622) E-mail Regarding Holtec-CISF Draft EIS ML20269A3362020-09-23023 September 2020 Comment (4623) E-mail Regarding Holtec-CISF Draft EIS ML20269A3612020-09-23023 September 2020 Comment (4626) E-mail Regarding Holtec-CISF Draft EIS ML20269A3632020-09-23023 September 2020 Comment (4628) E-mail Regarding Holtec-CISF Draft EIS ML20269A3642020-09-23023 September 2020 Comment (4629) E-mail Regarding Holtec-CISF Draft EIS ML20269A3652020-09-23023 September 2020 Comment (4630) E-mail Regarding Holtec-CISF Draft EIS ML20267A1612020-09-23023 September 2020 Comment (101) from Karen Pope on Holtec International HI-STORE Consolidated Interim Storage Facility Project ML20269A3942020-09-23023 September 2020 Comment (4640) E-mail Regarding Holtec-CISF Draft EIS ML20269A4032020-09-23023 September 2020 Comment (4644) E-mail Regarding Holtec-CISF Draft EIS 2020-09-30
[Table view] |
Text
Page 1 of 1 SUNSI Review Complete Template = ADM-013 E-RIDS=ADM-03 ADD: Jill Caverly As of: 9/23/20 8:14 AM COMMENT (107) Received: September 22, 2020 PUBLICATION DATE:
Status: Pending_Post PUBLIC SUBMISSION 3/20/2020 CITATION 85 FR 16150 Tracking No. kfe-l9l9-0q65 Comments Due: September 22, 2020 Submission Type: Web Docket: NRC-2018-0052 Holtec International HI-STORE Consolidated Interim Storage Facility Project Comment On: NRC-2018-0052-0376 Holtec International HI-STORE Consolidated Interim Storage Facility Project Document: NRC-2018-0052-DRAFT-0415 Comment on FR Doc # 2020-17536 Submitter Information Name: Martha lynne Address:
tucson, AZ, 85713 Email: martzlw7@gmail.com General Comment Please see below attachment as that is my comment.
Attachments NRC-2018-0052-0376 comment https://www.fdms.gov/fdms/getcontent?objectId=0900006484871a4b&format=xml&showorig=false 09/23/2020
I am alarmed at the sloppiness and lack of attention to NEPA process done in an effort to transport and bury highly hazardous waste from 29 states of this nation. This DEIS is missing too many elements to minimize risks to the citizens of our country in a hurried attempt to improve bad situations in many locations. While those sites need immediate attention, it needs to be localized for now, with Federal funding to protect those citizens and species affected until a plan is safely composed for permanent disposal. Though designated as a temporary disposal site, we all know and should tell the truth about it very likely to become the permanent one. After all, moving this much even low level nuclear waste, as this DEIS shows, is a very hazardous event endangering the air and water sources of all the communities it travels through; and most incredibly, NM's population and environmental health. NM is no longer the "way-off" state it was in the 1950's and before. The population grows exponentially. The massive wildfires in the western edge of this country pushes migration east; and NM is one of the states we will see hosting this new migrant population.
This DEIS process, the one NEPA directs to include all interested/affected public, has been rushed through with minimal effort, that required by the law only, failing to involve or even notify the public of this transport through their towns and properties. It fails to take the risks of removal from deteriorating wastepile sites into account and show how they will be mitigated. It fails to even consider the specific risks to the larger population whose homes or utilites are along the many routes these wastes will pass, relying way too much on computer models to predict the dangers. Then it dumps a tremendous amount of waste in one place, one state... over a known geologic aquifer! This with no acknowledgement of the dangers of doing so, no identification of what agency will now be responsible to mitigate the dangers to the water supply of all affected (for instance) of that much toxic waste.
What the DEIS needs to address: 1) Total public involvement, including notification of all along the routes of transport; early invovlement of the towns this waste now resides; and a NEPA style addressing of all concerns/ideas. 2) A modelling of the risks of transport based on real life similar waste accidents, a directive for scheduling transport around the growing number of hurricanes, tornadoes and fires; a list of directives/areas of mitigation Holtec will be responsible for and responsive to NRC to assess and perform; an assessment of the railroad infrastructure along each route (and plan to address); and a plan to mitigate any accidents that may occur in transport. 3) What protections of the Permian Basin below the planned burial site are to be taken? What agency will be in charge of this stockpile, to prevent! and mitigate accidents to it after it is deposited?
Frankly, I suspect keeping these waste materials in smaller stockpiles in their respective states (in most cases) is less dangerous to the public good than trying to stockpile it all in one place. All these stockpiles are now a national danger; and should be addressed, each individually nationally and paid for mitigation nationally. No mitigation will be failsafe; not in any state, including New Mexico. And that needs to be acknowledged.
Martha Lynne martzlw7@gmail.com