Other: ML13317A116, ML20133E838, ML20260G116, ML20260G120, ML20260G123, ML20261D620, ML20261D625, ML20261D627, ML20261D631, ML20261D634, ML20261D638, ML20261D641, ML20261D646, ML20261D649, ML20261D653, ML20261D658, ML20261D661, ML20261D666, ML20261D671, ML20261D674, ML20261D678, ML20261D683, ML20261D686, ML20261D691, ML20261D695, ML20261D700, ML20261D703, ML20261D706
|
MONTHYEARML20260G1161965-06-17017 June 1965 Fuel Storage Building Sections & Details. Sheet 1 Project stage: Other ML20260G1231965-08-20020 August 1965 Fuel Storage Building Section & Details. Sheet 7.Field Change Request & Drawing Change Notices Encl Project stage: Other ML20260G1201967-01-31031 January 1967 Fuel Storage Building Sections & Details. Sheet 4 Project stage: Other ML20261D6271980-10-30030 October 1980 Turbine Area Enclosure Wall Plan (Cont):I&E Bulletin 80-11 Details Project stage: Other ML20261D6661980-10-30030 October 1980 Fuel Storage Building (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6711980-10-30030 October 1980 Fuel Storage Build (Sections):I&E Bulletin 80-11 Details Project stage: Other ML20261D6831980-10-30030 October 1980 Fuel Storage Building:I&E Bulletin 80-11 Details Project stage: Other ML20261D6861980-10-30030 October 1980 Ventilation Building Plan:I&E Bulletin 80-11 Details Project stage: Other ML20261D7001980-10-30030 October 1980 Reactor Auxiliary Building Storage Building (Sect & Elev):I&E Bulletin 80-11 Details Project stage: Other ML20261D7061980-10-30030 October 1980 Administration Building (Partial Plan):I&E Bulletin 80-11 Details Project stage: Other ML20261D6201980-10-30030 October 1980 Block Wall Key Plan:I&E Bulletin 80-11 Details Project stage: Other ML20261D6251980-10-30030 October 1980 Turbine Area Enclosure Wall (Partial Plan):I&E Bulletin 80-11 Details Project stage: Other ML20261D6311980-10-30030 October 1980 Turbine Area Enclosure Wall (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6381980-10-30030 October 1980 Turbine Area Enclosure Wall (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D7031980-10-30030 October 1980 Administration Building (Partial Plan):I&E Bulletin 80-11 Details Project stage: Other ML20261D6951980-10-30030 October 1980 Reactor Auxiliary Building Storage Building (Plan & Elev):I&E Bulletin 80-11 Details Project stage: Other ML20261D6911980-10-30030 October 1980 Ventilation Building (Elev):I&E Bulletin 80-11 Details Project stage: Other ML20261D6781980-10-30030 October 1980 Fuel Storage Building (Elevations):I&E Bulletin 80-11 Project stage: Other ML20261D6741980-10-30030 October 1980 Fuel Storage Building (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6611980-10-30030 October 1980 Fuel Storage Building (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6581980-10-30030 October 1980 Fuel Storage Building (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6531980-10-30030 October 1980 Fuel Storage Bldg (Elevs & Sects):I&E Bulletin 80-11 Details Project stage: Other ML20261D6491980-10-30030 October 1980 Fuel Storage Building (Plan):I&E Bulletin 80-11 Details Project stage: Other ML20261D6461980-10-30030 October 1980 Turbine Area Enclosure Wall (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6411980-10-30030 October 1980 Turbine Area Enclosure Wall (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML20261D6341980-10-30030 October 1980 Turbine Area Enclosure Wall (Elevations):I&E Bulletin 80-11 Details Project stage: Other ML13317A1161982-05-0707 May 1982 Forwards 23 Oversize Drawings Showing Safety & nonsafety- Related Items Attached to or in Proximity of Masonry Walls,In Response to NRC Request Re IE Bulletin 80-11, Masonry Wall Design. Aperture Cards Are Available in PDR Project stage: Other ML13324A5591985-02-15015 February 1985 Forwards Drawings Re Fuel Storage Bldg Connection Details, Per NRC 840905 & 06 Meetings Request Concerning Masonry Wall Test Program.W/Three Oversize Drawings.Aperture Cards Available in PDR Project stage: Meeting ML13324A6821985-07-26026 July 1985 Forwards Proprietary TER-C5506-405 Masonry Wall Design Southern California Edison Co,San Onofre Unit 1, Draft Technical Evaluation Rept.Rept Withheld (Ref 10CFR2.790) Project stage: Draft Other ML20133E8381985-09-20020 September 1985 Forwards Application & Affidavit for Withholding Proprietary Info in Franklin Research Ctr Technical Evaluation Rept Concerning SEP Topic III-6, Seismic Design Considerations, from Public Disclosure (Ref 10CFR2.790) Project stage: Other ML13324A7761985-11-0707 November 1985 Forwards Safety Evaluation Re Util Submittal on SEP Topic III-6 on Seismic Reevaluation of Reinforced Concrete Masonry Walls at Facility,In Response to IE Bulletin 80-11. Sanitized Version of Technical Evaluation Rept Also Encl Project stage: Approval 1982-05-07
[Table View] |
Text
Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 K. P. BASKIN TELEPHONE MANAGER OF NUCLEAR ENGINEERING, May 7, 1982 (213) 572-1401 SAFETY, AND LICENSING Director, Office of Nuclear Reactor Regulation Attention:
D. M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing 1
M U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:
Subject:
Docket No. 50-206 Masonry Wall Design San Onofre Nuclear Generating Station Unit 1 In accordance with a request from the NRC staff, enclosed are two copies of sketches SK-C-001 to SK-C-023 which show safety and non-safety related items attached to or in proximity to masonry walls at San Onofre Unit 1. These drawings were previously provided to the NRC by letter dated November 10, 1980 from J. G. Haynes to R. H. Engelken.
If you have any questions on these drawings, please let me know.
Very truly yours, Enclosures 8205120116 820507 PDR ADOCK 05000206 G