Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps,
ML20249A167
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/11/1998
From: Richard Ennis
NRC (Affiliation Not Assigned)
To:
Public Service Enterprise Group
References
GL-97-04, GL-97-4, TAC-M99998, NUDOCS 9806160130
Download: ML20249A167 (4)


Text

l

{

  • Clio e

y

  • 4 UNITED STATES NUCLEAR REGULATORY COMMISSION r~

m U

wAssiwaTow, o.c. soessaoot Md2

%,*****,o June 11, 1998 j

Mr. Harold W. Keiser Chief Nuclear Officer & President-Nuclear Business Unit Public Scrvice Electric & Gas Company j

Post Office Box 236 Hancocks Bndge, NJ 08038

SUBJECT:

COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 97 HOPE CREEK GENERATING STATION (TAC NO. M99998)

Dear Mr. Keiser:

The U.S. Wuclear Regulatory Commission (NRC) issued Generic Letter (GL) 97-04, " Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Remos al Pumps," to all holders of operating licenses or construction permits on October 7,1997.

The NRC issued GL 97-04 to confirm the adequacy of the net positive suction head (NPSH)

{

available for emergency core cooling (including core spray and decay heat removal) and

^

containment heat removal pumps under all design-basis accident semarios.

h1 GL 97-04, the NRC staff specifically requested that licensees provide the information outlined below for each of their facilities.

1. Specify the general methodology used to calculate the head loss associated with the ECCS i

suction strainers.

2. Identify the required NPSH and the available NPSH.

D

3. Specify whether the current design-basis NPSH analysis. differs from the most recent analysis reviewed and approved by the NRC for which a safety evaluation was issued.

4.

Specify whether containment overpressure (i.e., containr. tent pressure above it J vapor pressure of the sump or suppression pool fluid) was credited in the calculation of availcble NPSH. Specify the amount of overpressure needed and the minimum overpressure available.

5. When containment overpressure is credited in the calculation of available NPSH, confirm that w npropriate containment pressure analysis was done to establish the minimum co.nainment pressure.

l I

i 9006160130 900611 f

PDR ADOCK 05000354 P

PDR

- ~ - - -

Q

H. Keiser In response to GL 97-04, you pros lded a letter dated December 30,1997, for Hope Creek Generating Station. This submittal provided the information requested by GL 97-04. The staff has reviewed your response and has concluded that all requested information has been provided; therefore, we consider GL 97-04 closed for your facility. Thank you for your prompt and complete response.

If you have any questions regarding this matter, please contact me at 301-4151420.

Sincerely,

/5/

Richarr' B. Ennis, Acting Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-354 cc: See next page DISTRIBUTION Docket File PUBLIC PDl-2 Reading JZwolinski RCapra REnnis TClark JKudrick KKavanagh DSkay OGC ACRS WHehl, RGN-l JLinville, RGN-l

  • Previously Concurred

_ OFFICE PDI-2/PM PDI-3/LA SRXB/BC*

SCSB/BC*

PDI-2/D TClarkMb NAME REnnis:rb RCaruso JKudrick RCapra **D DATE G /10/98 h//h/98 06/10/98 06/10/98 (o /u /98 OFFICIAL RECORD COPY DOCUMENT NAME: HC99998. GEN

l H. Keiser In response to GL 97-04, you provided a letter dated December 30,1997, for Hope Creek Generating Station. This rubm'ttal provided the information requested by GL 97-04. The staff has reviewed your response anu has concluded that all requested information has been provided; therefore, we consider GL 97-04 closed for your facility. Thank you for your prompt and complete response, if you have any questions regarding this matter, please contact me at 301-415 i420.

Sincerely,

~

Richard B. Ennis, Acting Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Docket No. 50-354 cc: See next page

e Mr. Harold W. Keiser Hope Creek Generating Station PublY. Service Electric & Gas Company cc:

Jeffrie J. Keenan, Esquire Manager-Joint Generation Nuclear Business Unit - N21 Atlantic Energy P.O. Box 236 6801 Black Horse Pike Hancocks Bridge, NJ 08038 Egg Harbor Twp., NJ 08234-4130 Hope Creek Resident inspector Richard Hartung U.S. Nuclear Regulatory Commission Electric Service Evaluation Drawer 0509 Board of Regulatory Commissioners Hancocks Bridge, NJ 08038 2 Gateway Center, Tenth Floor Newark, NJ 07102 Mr. Louis Storz Sr. Vice President - Nuclear Operations Lower Alloways Creek Township Nuclear Department c/o Mary O. Henderson, Clerk P.O. Box 236 Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 General Manager - Hope Creek Operations Mr. E!bert Simpson Hope Creek Generating Station Senior Vice President-P.O. Box 236 Nuclear Engineering Hancocks Bridge, NJ 08038 Nuclear Department P.O. Box 236 Manager-Licensing and Regulation Hancocks Bridge, NJ 08038 Nuclear Business Unit - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Regional Administrator, Region I U.S. Nuclear Regulatory Commission

)

475 Allendale Road King of Prussia, PA 19406 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs 1

NJ Department of Environmer.tal Protection and Energy CN 415 Trenton, NJ 08625 0415 l