Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley1988-06-27027 June 1988 PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley PNO-V-86-014, on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake1986-03-31031 March 1986 PNO-V-86-014:on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake ML20216J9131978-08-31031 August 1978 PNO-78-159:on 780830,members of Region V Discussed Regional Quality Control Board Sampling Program.Ge Routinely Releases Tritium from Test Reactor & Has Continued to Process Backlog of Tritiated Water Despite Shutdown of Reactor ML20248H6781978-04-25025 April 1978 PNO-78-094:on 780424,NRC Region V Ofc Received Unsigned & Undated Ltr Alleging Unsafe Conditions at GE Test Reactor. Informs That Reactor Shutdown Since 771027.Investigation Re Allegations Will Be Conducted by NRC Starting on 780426 1988-06-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000070/19992011999-07-0101 July 1999 Insp Repts 50-070/99-201,50-073/99-201 & 50-183/99-201 on 990607-10.No Violations Noted.Major Areas Inspected: Operation Program,Organizational Structure & Functions Program IR 05000070/19980011999-01-0707 January 1999 Insp Rept 50-070/98-01 on 991116-19.No Violations Noted. Major Areas Inspected:Review of Status of Three Shutdown Reactor Facilities,Getr,Vbwr & Evesr.Safstor Condition of Evesr,Getr & Vbwr Evaluated During Tour of Facilities ML20217C1491998-03-18018 March 1998 Insp Repts 50-070/98-201,50-073/98-201 & 50-183/98-201 on 980209-13.Violations Noted.Major Areas Inspected:Review of Safeguards Programs,Security Program,Procedures,Radiation Protection & Matl Control ML20217C1281998-03-18018 March 1998 Notice of Violation from Insp on 980209-13.Violation Noted: Licensee Failed to Comply with Requirements of Section 12 of Physical Security Plan IR 05000018/19970011998-01-0909 January 1998 Insp Repts 50-018/97-01,50-070/97-01 & 50-183/97-01 on 971204.No Violations Noted.Major Areas Inspected:Review of Status of Getr,Vbwr & ESADA Vallecitos Experimental Superheat Reactor PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley1988-06-27027 June 1988 PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley IR 05000018/19870011987-09-23023 September 1987 Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03.Violations Noted.Major Areas Inspected:Evesr,Getr,Nuclear Test Reactor & Vbwr Facility Operation Programs & Emergency Preparedness Program IR 05000018/19860011986-06-24024 June 1986 Insp Repts 50-018/86-01 & 50-183/86-01 on 860617.No Violation or Deviation Noted.Major Areas Inspected: Organization,Procedures,Audits,Surveillances,Surveys, Postings,Annual Repts & Independent Surveys PNO-V-86-014, on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake1986-03-31031 March 1986 PNO-V-86-014:on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake IR 05000070/19850011985-10-0808 October 1985 Corrected Page 2 to Insp Repts 50-070/85-01 & 50-073/85-02 ML20133H4411985-10-0101 October 1985 Insp Repts 50-070/85-01 & 50-073/85-02 on 850812-15. Violation Noted:Failure to Conspicuously Post Radiation Area.Unresolved Item Involving Nuclear Test Reactor Licensed Operator Activities Identified ML20133H4381985-10-0101 October 1985 Notice of Violation from Insp on 850812-15 ML20148N5361978-10-18018 October 1978 IE Inspec Rept 50-70/78-08 on 780926-28 During Which No Items of Noncompliance Were Noted.Major Areas Inspec Incl: Mods of Primary Heat Exchanger,Seismic Restraints,Qa Records & Followup on Previous Inspec Items ML20216J9131978-08-31031 August 1978 PNO-78-159:on 780830,members of Region V Discussed Regional Quality Control Board Sampling Program.Ge Routinely Releases Tritium from Test Reactor & Has Continued to Process Backlog of Tritiated Water Despite Shutdown of Reactor ML20248H6781978-04-25025 April 1978 PNO-78-094:on 780424,NRC Region V Ofc Received Unsigned & Undated Ltr Alleging Unsafe Conditions at GE Test Reactor. Informs That Reactor Shutdown Since 771027.Investigation Re Allegations Will Be Conducted by NRC Starting on 780426 1999-07-01
[Table view] |
Text
h] /MO caps per PRELIMINARY _ NOTIFICATION q .M lj[
April 25,1978 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-78-94 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.
Facility: General Electric Company GE Test Reactor (GETR)
Pleasanton, California Docket No. 50-70
Subject:
ANONYMOUS ALLEGATIONS OF UNSAFE CONDITIONS An unsigned and undated letter alleging unsafe conditions at the I General Electric Company Test Reactor (GETR) was received by the NRC Region V (San Francisco) office on April 24, 1978. The letter stated, in part, "Here are some reasons for not granting General Elesctric ._
Nuclear Test Reactor in Pleasanton, California a license for startup." 5'5 i The alleger had statements of concern relating to the reactor spent :
fuel canal integrity, the primary heat exchanger intergrity, the circu- !
(- ' lation of Cobalt-60 pellets through the primary piping systJm, primary l piping weld inspection and restraints, unsafe conditions in the reactor subpile room, and inoperable seismograph instrumentation. l The GETR has been shut down since October 27, 1977 due to newly discovered geology information suggestive of a fault near the site. Proceedings are also pending on renewal of the facility operating license.
The NRC Office of. Inspector and Auditor has been informed of the allegation.
An investigation into the allegations will be conducted by the NRC Region V office commencing on April 26, 1978. A press release is not plar.ned.
NRC Region V (San Francisco) received notification of the allegations by anonymous letter on April 24, 1978.
l
Contact:
GLConstable, IE x28019 JHSniezek, IE x28019 0 n, Distrib~0 tion: Transmitted H St 3! k
- Chairman Hendrie Commissioner Bradford k Commissioner Kennedy S. J. Chilk, SECY C. C. Kammerer, CA
, Commissioner Gilinsky (For Distribution) l OhTransmitted: MNBB 3lV ') P Bldg J/ E. Volgenau, IE '
- h L. V. Gossick, EDO E. G. Case, NRR Region jr- J/f0
) S. H. Hanauer, EDO
,ohJ.J.Fouchard,PA
@ SSBldg],'N (MAIL)
I
&LA N. M. Haller, MPA 'Q.V. Smith,NMSS T. J. McTiernan, 01A R. G. Ryan, OSP R. Minogue, 50 i
H. K. Shapar, ELD pan T:n :;aev :;r.T i r r e r.T i ne
- - ---- --