Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20217C1281998-03-18018 March 1998 Notice of Violation from Insp on 980209-13.Violation Noted: Licensee Failed to Comply with Requirements of Section 12 of Physical Security Plan ML20133H4381985-10-0101 October 1985 Notice of Violation from Insp on 850812-15 1998-03-18
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000070/19992011999-07-0101 July 1999 Insp Repts 50-070/99-201,50-073/99-201 & 50-183/99-201 on 990607-10.No Violations Noted.Major Areas Inspected: Operation Program,Organizational Structure & Functions Program IR 05000070/19980011999-01-0707 January 1999 Insp Rept 50-070/98-01 on 991116-19.No Violations Noted. Major Areas Inspected:Review of Status of Three Shutdown Reactor Facilities,Getr,Vbwr & Evesr.Safstor Condition of Evesr,Getr & Vbwr Evaluated During Tour of Facilities ML20217C1491998-03-18018 March 1998 Insp Repts 50-070/98-201,50-073/98-201 & 50-183/98-201 on 980209-13.Violations Noted.Major Areas Inspected:Review of Safeguards Programs,Security Program,Procedures,Radiation Protection & Matl Control ML20217C1281998-03-18018 March 1998 Notice of Violation from Insp on 980209-13.Violation Noted: Licensee Failed to Comply with Requirements of Section 12 of Physical Security Plan IR 05000018/19970011998-01-0909 January 1998 Insp Repts 50-018/97-01,50-070/97-01 & 50-183/97-01 on 971204.No Violations Noted.Major Areas Inspected:Review of Status of Getr,Vbwr & ESADA Vallecitos Experimental Superheat Reactor PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley1988-06-27027 June 1988 PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley IR 05000018/19870011987-09-23023 September 1987 Insp Repts 50-018/87-01,50-070/87-01,50-073/87-01 & 50-183/87-01 on 870901-03.Violations Noted.Major Areas Inspected:Evesr,Getr,Nuclear Test Reactor & Vbwr Facility Operation Programs & Emergency Preparedness Program IR 05000018/19860011986-06-24024 June 1986 Insp Repts 50-018/86-01 & 50-183/86-01 on 860617.No Violation or Deviation Noted.Major Areas Inspected: Organization,Procedures,Audits,Surveillances,Surveys, Postings,Annual Repts & Independent Surveys PNO-V-86-014, on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake1986-03-31031 March 1986 PNO-V-86-014:on 860331,earthquake W/Magnitude of 5.3 on Richter Scale Occurred Approx 10 Miles East of Fremont,Ca.No Damage Observed at Research Reactor Facilities.Rancho Seco Did Not Feel Effects of Earthquake IR 05000070/19850011985-10-0808 October 1985 Corrected Page 2 to Insp Repts 50-070/85-01 & 50-073/85-02 ML20133H4411985-10-0101 October 1985 Insp Repts 50-070/85-01 & 50-073/85-02 on 850812-15. Violation Noted:Failure to Conspicuously Post Radiation Area.Unresolved Item Involving Nuclear Test Reactor Licensed Operator Activities Identified ML20133H4381985-10-0101 October 1985 Notice of Violation from Insp on 850812-15 ML20148N5361978-10-18018 October 1978 IE Inspec Rept 50-70/78-08 on 780926-28 During Which No Items of Noncompliance Were Noted.Major Areas Inspec Incl: Mods of Primary Heat Exchanger,Seismic Restraints,Qa Records & Followup on Previous Inspec Items ML20216J9131978-08-31031 August 1978 PNO-78-159:on 780830,members of Region V Discussed Regional Quality Control Board Sampling Program.Ge Routinely Releases Tritium from Test Reactor & Has Continued to Process Backlog of Tritiated Water Despite Shutdown of Reactor ML20248H6781978-04-25025 April 1978 PNO-78-094:on 780424,NRC Region V Ofc Received Unsigned & Undated Ltr Alleging Unsafe Conditions at GE Test Reactor. Informs That Reactor Shutdown Since 771027.Investigation Re Allegations Will Be Conducted by NRC Starting on 780426 1999-07-01
[Table view] |
Text
. . . . .
APPENDIX A NOTICE OF VIOLATION General Electric Company Docket Nos. 50-70 Vallecitos Nuclear Center License Nos. TR-1
' General Electric Test Reactor (GETR)
As a result of the inspection conducted during the period of August 12-15, 1985, and in accordance with NRC Enforcement Policy 10 CFR Part 2, Appendix C, the following violation was identified:
A. 10 CFR Part 20.202(b)(2), " Radiation Area" is defined as "any area, accessible to personnel, in which there exists radiation, originating in whole or in part within licensed material, at such levels that a major portion of the body could receive in any one hour a dose in excess of 5 millirem, or in 5 consecutive days a dose in excess of 100 millirem."
10 CFR Part 20.203(b), " Radiation Areas" requires: "Each radiation area shall be conspicuously posted with a sign or signs bearing the radiation caution symbol and the words: CAUTION - RADIATION AREA."
Contrary to the above, on August 15, 1985, an area adjacent to the GETR tank farm had radiation levels such that a major portion of the whole body could receive up to 16 millirem in one hour and no signs were posted at the entry point from the GETR control room.
This is a Severity Level V Violation (Supplement IV).
Pursuant to the provisions of 10 CFR 2.201, no response is necessary in view of timely manner in which you corrected the items.
OCT 011985 Dated /Ross A. Scarano, Director
~
Division of Radiation Safety and Safeguards l
l 8510170355 851001 PDR r
O ADOCK 05000070 1
PDR