ML20248H092
| ML20248H092 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 03/30/1989 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20248H094 | List: |
| References | |
| NUDOCS 8904140066 | |
| Download: ML20248H092 (2) | |
See also: IR 05000369/1989009
Text
-
.
.
.
-_
-
1,
~lh: ,k f
- Sc
.
1,w. - ~
..
..
.
,
.
,
SAFEGUARDS INFORMATION'
~
.
f-
MAR 3 01989
SAFEGUARDS INFORMATION REM
Docket Nos.- 50-369,~50-370-
Duke Power Company
X
ATTN:
'Mr. H..B.-Tucker, Vice President
Nuclear Production Department
_
422 South' Church Street
Charlotte, NC .28242
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-369/89-09 AND-50-370/89-09)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
D. LThompson _ on February 20-24, 1989.
The inspection included a review l of
.
activities authorized .for your McGuire facility.
At the -conclusion of. the
inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and' . representative records, interviews with personnel, and observation of
activities in progress.
The -inspection findings indicate that certain activities appeared to violate
NRC requirements'.
The violations, references to pertinent requirements, and
elements to be included in your response are described in the enclosed Notice
of Violation.
In addition to the need for corrective action regarding the specific matters-
identified in tha ' enclosed Notice, Mr. D. McGuire, Chief, Physical Sacurity
Section; and Mr. M. Shymlock, Chief, Reactor Projects expressed NRC's concerns
~
to' Mr. T. L. McConnel Station Manager about the areas discussed. during the
inspector's exit and specifically the numerous and continued violations in the
Access Control Program.
Consequently, your response should describe those
particular actions .taken or planned to improve the effectiveness of your
program.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure. Therefore, the enclosures
to this letter with the exception of the report cover page, which presents a
,
nonexempt summary, will n_ot be placed in the NRC Public Document Ro m.
g
'8904140066 890330
I (*
!'
ADOCK 05000369
- %
-Q
oxumem trsasmmed hero *Hh
'
' S AF EG U AR D S I N FO R M AT I O N
contains sensitWe u
.
-
.
SAFEGUARDS INFORMATION
-
.
-
.
.
,
Duke Power Company
4
%30W
I
l
l
i
Should you have any questions concerning this letter, please contact us.
Sincerely,
l
( hl$ ^ ff412
-
y. Es4
J. Philip Stohr, Director
Division of Radiation Safety
and Safeguards
Enclosures:
1.
(Safeguards Information)
2.
NRC Inspection Report
(Safeguards Information)
cc w/encis:
T. L. McConnell, Station Manager
4
cc w/ Inspection Summary:
State of North Carolina
bec w/encis:
NRR/DRIS/SB
bec w/ Inspection Summary:
Document Control Desk (RIDS IE04), 016
NRC Resident Inspector
Senior Resident Inspector - Catawba
!
!
.-
i
RII
RII
RI4
DThonh n:er
Dcu
MS miock
ne
m
03/2f/89
03/p/89
03/j2g89
03/2J/89
-
" " " " " ' " " " " ~ "
SAFEGUARDS INFORMATION
"ai""a*~**'*
information. When separ.ited from
enclosures, this document is decontrolled.
_ _ _ _ _ _ _ _ _