Submits Addl Info Re 880930 Response to NRC Bulletin 88-004, Potential Safety Related Pump Loss, Including Schedule for Design Calculation Review Program for Essential Calculations to Be Completed Before Restart of Each Unit
ML20248G602
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/05/1989
From: Fox C
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-004, IEB-88-4, TAC-69888, TAC-69889, TAC-69890, NUDOCS 8904130501
Download: ML20248G602 (3)


Text

-

. g*

'o TENNESSEE VALLEY AUTHORITY

~

l CHATTANOOGA, TENNESSEE 37401 p

SN 1578 Lookout Place APR 051989 1

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.

20555 Gentlemen:

In the Matter of 3

Docket Nos. 50-259 Tennessee Valley Authority

)

50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1 AND 3 - ADDITIONAL RESPONSE TO NRC BULLETIN 88-04 (NRCB 88-04) - POTENTIAL SAFETY RELATED PUMP LOSS (TAC NOS. 69888, 69889, 69890)

Rtferences:

1.

NRC letter to 0. D. Kingsley, Jr. dated March 1, 1989,

" Response to NRC Bulletin 88 Browns Ferry Nuclear Plant, Units 1, 2, and 3" 2.

TVA letter to NRC dated September 30, 1988, " Browns Ferry (BFN), Hatts Bar (HBN), and Bellefonte (BLN) Nuclear Plants

- NRC Bulletin 88-04, " Potential Safety Related Pump Loss" In reference 1, NRC requested that TVA provide an additional response to its submittal on NRCB 88-04 (reference 2), to include the following information for units 1 and 3:

a.

Summarize the problems and the systems affected.

b.

Ident'fy the short-term and long-te"m modifications to the plant operating procedures or hardware that have bean or are being implemented to ensure safe plant operations.

c.

Identify an appropriate schedule for long-term resolution of this and/or other significant problems that are identified as a result of NRCB 88-04.

d.

Provide justification for continued operation particularly with regard to General Design Criterion 35 of Appendix A, 10 CFR 50.46.

8904130501 890405 PDR ADOCK 05000259 O

g PDC pn Fqual Opportunity Employer

T y

U.S. Nuclear Regulatory Commission APR 051989 Af ter careful review of NRCB 88-04 and TVA's response, we believe that our submittal adequately addressed the items listed above, with the exception of item c, for units 1 and 3.

In order to provide additional clarification of our response item 4.(c) of reference 2 should be changed to read:

4.(c) SCHEDULE FOR LONG-TERM RESOLUTION TVA's Design Calculation Review Program for essential calculations, commitment items 78, 78a, and 78b of the BFN NL, lear Performance Plan (BFNPP) Volume 3, Revision 1, is required to be completed before restart of each unit.

If you have any questions, please telephone Patrick P. Carier, BFN, Site Licensing, at (205) 729-3570.

'/ery truly yours, TEN ESSEE

.LLEY AUTHORITY C. H. Fox, Jr, Vice President and Nuclear Technical Director cc: See page 3 I

l l

% g..

Q, - %;_

i P

U.S. Nuclear Regulatory Commission APR 051989 1

PPC:JEM:RLB:MLM cc: Ms. S. C. Black, Assistant Director

[

for Projects

[

TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint,. North 11555 Rockville Pike Rockville, Maryland 20852 Ms. L. J. Watson, Acting Assistant Director for. Inspection Programs

.TVA Projects Division U.S. Nuclear Regulatory Commission Region II-101 Marietta Street, NH, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000

_ _ _ _ _ _ _ _ _ _. _ _. _ _ _ _ _.. _ _. _. _.. _ _