April 4, 1989 I
Distribution:
ACRS(10)(9/A/2)
B. Grimes Docket No. 50-416 tweenetane*
NRC PDR y
l Local PDR E.Greher(12/H/7) l PD21 r/f Mr. W. T. Cottle S.Varga(14/E/4)
Vice President, Nuclear Operations-C. Lainas System Energy Resources, Inc.
E. Adensam l
P. Anderson P. O. Box 23054 L. Kintner Jackson, Mississippi 39205 0GC
Dear Mr. Cottle:
E. Jordan (MNBB3302)
SUBJECT:
REACTOR VESSEL PRESSURE AND TEMPERATURE LIMITS-GRAND GULF NUCLEAR STATION (GGNS), UNIT 1 (TAC NO. 71497)
By letters dated January 9, 1989 and February 28, 1989 System Energy Resources, Inc., (SERI) provided the results of the analyses of reactor vessel pressure-temperature limits based on the methods described in Revision 2 of Regulatory Guide 1.99.
These analyses were requested in Generic Letter 88-11. The results showed that the pressure-temperature limits for a period of operation of 10 effective full power years (EFPY) are more conservative than the pressure-temperature limits in the current Technical Specifications (TS) for 32 EFPY.
The letter stated that SERI will submit a proposed amendment to the operating license to change the TS limits for 32 EFPY, based on the revised method of analysis, within 60 days of the NRC approval of the method of analysis.
The NRC staff is reviewing the SERI analyses. The proposed date for submitting a TS change request is satisfactory upon condition that the latest date for submitting a proposed TS change is 9 EFPY. The present TS pressure-temperature limits should be restricted to 10 EFPY by administrative control.
Sincerely,
/5 Lester. Kintner, Senior Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc: See next page Vf0I (LTR.
COTTLE FROM KIN R) g LAr PR:NRR PM ' cz1:DRPR:NRR D:
2 :DRPR:NRR PDA LLKintner: dim EG nsam 04/g/89 04/vy/' 89 04/p/89 8904120449 090404 PDR ADOCK 05000416 P
I
'l
,g i
Mr. W. T. Cottle System Energy Resources, Inc.
Grand Gulf Nuclear Station (GGNS) cc:
Mr. T. H. Cloninger Mr. C. R. Hutchinson Vice President, Nuclear Engineering GGNS General Manager I
and Support System Energy Resources, Inc.
System Energy Resources, Inc.
Post Office Box 756 P._0. Box 23054 Port Gibson, Mississippi 39150 Jackson, Mississippi 39205 Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, Steen and Attorney General Caraway Department of Justice P. O. Box 651 State of Louisiana Jackson, Mississippi 39205 Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Office of the Governor Bishop, Liberman, Cook, Purcell State of Mississippi and Reynolds Jackson, Mississippi 39201 1400 L Street, N.W.
Washington, D.C.
20005-3502 Attorney General Gartin Building Mr. Ralph T. Lally Jackson, Mississippi 39205 Manager of Quality Assurance Middle South Utilities System Mr. Jack McMillan, Director Services, Inc.
Division of Solid Waste Management 639 Loyola Avenue, 3rd Floor Mississippi Department of Natural l
New Orleans, Louisiana 70113 Resources Post Office Box 10385 Mr. John G. Cesare Jackson, Mississippi 39209 Director, Nuclear Licensing System Energy Resources Inc.
Alton B. Cobb, M.D.
P. O. Box 23054 State Health Officer Jackson, Mississippi 39205 State Board of Health P.O. Box 1700 Mr. C. B. Hogg, Project Manager Jackson, Mississippi 39205 Bechtel Power Corporation P. O. Box 2166 President Houston, Texas 77252-2166 Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 i
Mr. H. O. Christensen Senior Resident Inspector Regional Administrator, Region II U.S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Route 2, Box 399 101 Marietta Street Port Gibson, Mississippi 39150 Suite 2900 Atlanta, Georgia 30323
!