Text
___ __________ ____
May 22, 1989 L
Docket Nos. 50-295 and 50-304-Mr. Thomas J. Kovach c
Nuclear Licensing Manager Conexmwealth Edison Company l.
Post Office Box 767 Chicago, Illinois 60690 t
Dear Mr. Kovach:
SUBJECT:
COMPLIANCE WITH ATWS RULE (10 CFR 50.62) ZION STATION UNIT-NOS. 1 AND 2 (TAC NOS. 59160 and 59161)
.We have completed our review of the information provided by Commonwealth Edison Company-(CECO) to demonstrate compliance with the requirements of Anticipated Transients Without Scram (ATWS) Rule for Zion Station, Unit Mos. I and 2.. Our Safety Evaluation is enclosed, The. staff has concluded that, pending the final resolution of the technical specification issue, the ATWS design proposed by Ceco is in compliance with the ATWS Rule requirements of 10 CFR 50.62, Paragraph (c)(1). ~ Further, the staff's conclusion is based on the successful completion of certain human-factors engineering reviews as discussed in our Safety Evaluation.
This action completes our review on this subject.
It is expected that the implementation of these requirements will be completed by Fall 1989 for Unit I and by Spring 1990 refueling outage for Unit 2.
Also, you are requested to inform us when you have fully implemented the requirements.
Sincerely, Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects III, IV, V, and Special Projects
Enclosure:
C As stated n
cc w/ enclosure:
48 See next page 28' oo
'ffs DISTRIBUTION iDocket: file 1 MVirgilio EJordan Ud NRC"& L'ocAl'PDRs LLuther BGrimes 58 PDIII-2 r/f CPatel ACRS(10)
I
[10 ge GHolahan 0GC Plant file fg i
PDIII-[2:LA cff r<
mi c;p PDII M PD PD111-2:PM CPate1:dmj LLuther DMM4dr Sfj q/8h 5// g /89 5//r /89
~ ~ ~ ~
}/
- o UNITED STATES 7%
NUCLEAR REGULATORY COMMISSION g-3 WASHINGTON, D. C, 205F3
% * * * *
- e/
o May 22, 1989 Docket Hos. 50-295 and 50-304 Mr. Thomas J. Kovach Nuclear Licensing Man 3ger Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Kovach:
SUBJECT:
COMPLIANCE WITH ATWS RULE (10 CFR 50.62) ZION STATION UNIT NOS. 1 AND 2 (TAC NOS. 59160 and 59161)
We have completed our review of the information provioed by Commonwealth Eoison
. Company (Ceco) to oen.onstrate compliance with the requirements of Anticipated Transients Without Scram (ATWS) Rule for Zion Station, Unit Nos. I and 2.
Our Safety Evaluation is enclosed.
The staff has concluded that, pending the final resolution of the technical specification issue, the ATWS oesign proposed by Ceco is in compliance with theATWSRulerequirementsof10CFR50.62, Paragraph (c)(1). Further, the staff's conclusion is based on the successful completion of certain human-factors engineering reviewr, as discussed in our Safety Evaluation.
This action completes our review on this subject.
It is expected that the implementation of these requirements will Le completed by Fall 1989 f or Unit 1 and by Spring 1990 refueling outage for Unit 2.
Also, you are requested to inform us when you have ft!11y implemented the requirements.
Sincerely, W bl Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projeets III, IV, V, and Special Projects
Enclosure:
As stateo cc w/ enclosure:
See ncxt page 4
1 0.
4 Mr. Thomas J. Kovach' Zinn Nuclear Power Station.
T Commonwealth Edison Company Units 1 and 2 l
'cc:
Robert J. Vollen, Esquire Mr. Michael C. Parker, Chief 109 North Dearborn Street Divisica of Engineering Chicago, 1111 noir,60602 Illinois Department of Nuclear Safety Dr. Cecil Lue-Hing 1035 Outer. Park Drivs, 5th Floor Director of Research'and Development Springfield, Illinois 62704 Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611-Phillip Steptoe,, Esq..
Sidley and Austin One First National Plaza Chicago, Illinois 60603 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety
- ATTN: Manager, Nuclear Facility Safety
'1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 U.S. Nuclear Regulatory Comission Resident Inspectors Office 105 Shiloh Blvd.
Zion, Illinois 60099 Regional Administrator, Region III U.S. Nucleer Regulatory Comission 799 Roosevelt Road, Bldg. #4
-Glen Ellyn, Illincis 60137