Text
-.. _ _.
3:
i February.20, 1990 l
g Docket Nos.-50-295,
and 50-304 Thomas J. Kovach Nuclear Licensing Manager Commonwealth Edison Company-Suite 300 OPUS West III 1400 OPUS Place l
Downers Grove, Illinois 60515
Dear Mr. Kovach:
+
SUBJECT:
COMPLIANCEWITHATWSRULE(10CFR50.62)ZIONSTATIONUNITNOS.1 AND 2 (TAC NOS. 59160 AND 59161)
'We have completed our review of the revised information provided by Connenwealth' Edison Company (CECO) to demonstrate comp (ATWS) Rule for Zion liance with the requirements of Anticipated Transients Without Scram Station, Unit Nos. I and 2.-
Our supplemental Safety Evaluation is enclosed.
The staff has concluded that, pending the final resolution of the Technic'al Specification issue, the ATWS design proposed by Ceco is in compliance with
-the:ATWSRulerequirenentsof10CFR50.62,ParaDraph(c)(1)..Further,the 4
staff's: conclusion is based on the successful completion of certain human-factors engineering' reviews as discussed in our previous Safety
' Evaluation dated May 22, 1989.
This action completes our review on this subject.
It is expected that the implementation of.these requirements will be completed latest by spring-1991 refueling outage for Unit 1 and by spring 1990 refueling outage for Unit 2.
Further, we understand that you will attempt to install the modification in Unit 1 prior to the 1991 refueling outage if the unit is shut down for an outage of-sufficient duration as indicated in your letter dated January 25, i
1990 to Mr. Bert Davis. Also, you are requested to inform us when you.have
?
fully implemented the requirements.
Sincerely,
/s/
Chandu P. Patel, Project Manager Project Directorate III-2 C
Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation g
%O
,ON@ As stated
Enclosure:
NS 4
88 DISTRIBUTION (63 PDIII-2 r/f NRC & Local PDRs SC
.ex J7wolinski LLuther CPatel h
Plant File b"
0FFICAL RECORD COPY So-Document Name: ATWS 59160/59161 yl SEo:
CpP
- f. J~.
ib\\
.PDIII-2: A PDIII-2:PM PDIII-2:(A)PD L
LLuther CPatel:ta PShemanski y
A/4/90
&/ll//90 1 // 6/90
-- 1
/ "*'k UNITED STATES
^
f NUCLEAR REGULATORY COMMISSION g
.l
+
WASmWGTON, D. C. 30555
\\,***** / '
February 20. 1990 Docket Nos. 50-295 and 50-304
. Thomas J. Kovach 2
-Nuclear Licensing Manager
' Commonwealth Edison Company-Suite 300
.0 PUS West III t
1400 OPUS Place Downers Grove. Illinois 60515
Dear Mr. Kovech:
SUBJECT:
COMPLIANCE WITH ATWS RULE (10 CFR 50.62) ZION STATION UNIT NOS. 1 AtID 2 (TAC NOS. 59160 AND 59161)
We have com?leted our review of the revised information provided by
-[
Comonwealt'1 Edison Company (CECO) to demonstrate comp (ATWS) Rule fo liance with the requirements of Anticipated Transients Without Scram Station, Unit Nos. I and 2.
Our supplemental Safety Evaluation is enclosed.
The staff has concluded that, pending the final resolution of-the Technical Specification issue, the ATWS design proposed by Ceco is in compliance with the ATWS Rule requirements of 10 CFR 50.62, Paragraph (c)(1).
Further, the
, staff's cor' usion is based on the successful completion of certain hunan-factors engineering reviews as discussed in our previous Safety-F Evaluation dated May. 22, 1989.
This action completes our review on this subject.
It is expected that the
. implementation of these requirements will be completed latest by spring 1991 refueling outage for Unit.1 and by spring 1990 refueling outage for Unit 2.
Further, we understand that you will attempt to install the modification in Unit 1 prior to the 1991 refueling outage if the unit is shut down for an outage of sufficient duration as indicated in your letter dated January 25, 1990 to Mr. Bert Davis. - Also, you are requested to inform us when you have fully implemented the requirements.
Sincerely,
)
$Lt 0 Y
I-Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated
- cc w/ enclosure:
See next page
a.
Mr. Thomas J. Kovech Zion Nuclear Power Station Cosmonwealth' Edison Company Units 1 ano 2 cc:
F Robert J. Vollen, Esquire Mr. Michael C. Parker, Chief 109 North Dearborn Street Division of Engineering-l?
Chicago, Illinois 60602 1111ocis Department of Nuclear l
Safety L
Dr. Cecil Lue-Hing 1035 Outer Park Drive, 5th Floor l
' Metrox11 tan Sanitary District Director of Research and Development Springfield, Illinois 62704 I
of lireater Chicago 100 East Erie Street Chicago,. Illinois 60611 L
Phillip Steptoe, Esq..
$1dley and Austin o
One First National Plaza Chicago, Illinois 60603 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety-ATTN:- Manager, Nuclear Facility Safety
- 1035 Outer Park Drive 5th Floor
' Springfield, Illinois 62704
. U.S. Nuclear Regulatory Commission
. Resident Inspectors Office 105 Shiloh Blvd.
Zion Illinois 60099 U.gional Administrator, Region III Re S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. f4 Glen Ellyn, Illinois 60137 e.---