Text
,.
j
' Ma rch 27 e 1989
. c.
)
1
'Dockst No. 50-344 I
1 Mr. David Cockfield Vice President, Nuclear Portland General Electric Company
.121 S.W. Salmon Street Portland, Oregon 97204 Dear Mr. Cockfield i
SUBJECT:
PROPOSED INCREASE IN CONTROL BUILDING SHEAR LOADING FORCES l
(TAC N0. 72068) l l
By letters dated September 2,1968 and February 15, 1989, you prov'ided an analysis and supplementary information to support a planned modification that would increase the lateral shear forces on-the Control Building by up to 3 i
percent. From our completed review and evaluation of the analysis and supple-mentary information you provided to support the proposed increased' shear loading, we find that the proposed shear loading increase is acceptable.
Before startup after the upcoming outage during which the modifications will l
l be performed, a license amendment will be required to reflect the new shear load limit requirement.
Sincerely,
/s/
Roby B. Bevan, Project Manager Project Directorate V Division of Reactors Projects III, IV, V and Special Projects Office 'of Nuclear Reactor Regulation cc: See next page DISTRIBUTION.
- Docket
- Fi le.
Y NRC & Local PDRs PD5 Reading MVirgilio JLee l
RBevan l
OGC(f/infoonly) l EJordan l
BGrimes
~
DR PD5
/PD5
% ev/ D5 an:dr G
n 3
/89 3/g/89 3p, /89
\\
8903300217 890327 PDR ADOCK 05000344 P
P 1
t.
9 *\\th
' g[
~
UNITED STATES g
NUCLEAR REGULATORY COMMISSION l=..
- t. '
J.
WASHINGTON, D. C. 20555
- g f
L March 27, 1989 Docket No. 50-344 l
l
]
Mr. David Cockfield Vice President, Nuclear Portland General Electric Company 121 S.W.-Salmon Street Portland, Oregon 97204 Dear Mr. Cockfield l
SUBJECT:
PROPOSED INCREASE IN CONTROL BUILDING SHEAR LOADING FORCES (TACN0.72068)
By letters dated September 2,1988 and February 15, 1989, you provided an analysis and supplementary Information to support a planned modification that J
would increase the lateral shear forces on the Control Building by up to 3 j
percent. From our completed review and evaluation of the analysis'and supple-l mentary information you provided to support the proposed. increased shear loading, we find that the proposed shear loading increase is acceptable.
Before startup after the upcoming outage during which the modifications will be performed, a license amendment will be required to reflect the new shear load limit requirement.
Sincerely,
%M Roby B. Bevan, Project Manager Project Directorate V Division of Reactors Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation l
cc: See next page
.i t
l
3 Nr.' David W. Cockfield Portland General Electric Company Trojan Nuclear Plant 1
cc:
- Senior Resident Inspector i
U.S. Nuclear Regulatory Comission
-Trojan Nuclear Plant Post Office Box 0 Rainier, Oregon 97048
]
Mr. Michael J. Sykes, Chairman i
Board of County Commissioners Columbia County St. Helens, Oregon 97501 Mr. William T. Dixon Oregon Department of Energy
.l Salem, Oregon 97310 j
4 Regional Administrator, Region V U.S. Nuclear Regulatory Comission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 1
____ _____