ML20247A037

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 890122-0304.Violation Noted:Controlled Drawing FE-1AW,in Control Room,Unmarked to Reflect Affecting Mod 87-45
ML20247A037
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/22/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20247A015 List:
References
50-333-89-02, 50-333-89-2, NUDOCS 8903290034
Download: ML20247A037 (1)


Text

,

o APPENDIX _A NOTICE OF VIOLATION i

New York Power Authority Docket No. 50-333 i

James A. FitzPatrick Nuclear Power Plant License No. DPR-59 i

As a result of the inspection conducted on January 22, 1989 to March 4, 1989 and in accordance with NRC Enforcement Policy (10 CFR Part 2, Appendix C) the J

following violation was identified:

j Technical Specification 6.8 requires that the licensee implement administrative procedures to control modification to safety related systems.

I Work Control Procedure 10.1.9, section 7 3.3 requires that, prior to t

updating, a controlled drawing be marked to reflect an affecting' modification number.

Contrary to the above: On December 27, 1988 controlled drawing FE-1AW, in the control room, was not marked to reflect affecting modification 87-45.

In addition, on March 1, 1989 controlled drawing FM-22A, in the control l

room, was not marked to reflect affecting modification 88-16.

1 Work Control Procedure 10.1.6, section 7.1.7.2 and Operations Department Standing Order, section 7, require that operating procedure (0P) drawings be revised to reflect the as built conditions following a modification.

3 1

Contrary to the above: On December 27,1988, OP-468,120V AC Power System, figure 3, had not been revised to reflect the as built condition following modification 87-45.

On December 19, 1988, OP-13, Residual Heat Removal l

System, figure 1, had not been revised to reflect the as built condition following modification 81-36. On November 18, 1988, OP-25, Control Rod Hydraulic System, figure 3, had not been revised to reflect the as built l

condition following modification 85-53.

The above examples collectively constitute a Severity Level IV violation l

(Supplements).

1 Pursuant to the provisions of 10 CFR 2.201, the New York Power Authority is hereby required to submit to this office within thirty days of the date of the l

letter which transmitted this Notice, a written statement or explanation in I

reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further i

violations; and (3) the da.te when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

OFFICIAL RECORD COPY IR FITZ 89-02/2 - 0003.0.0 8903290034 890322 a

PDR ADOCK 05000333 03/17/89 o

PDC.

i

_ - - - _ _ _. _. _ _ _ - _. _ - _. _ _ - - - - _ _. _. - -. _. - - - - _ - - - - - -. - -