ML20245L284

From kanterella
Jump to navigation Jump to search
1989 Inservice Insp Summary Rept,890201-0407. Exams Performed Were Exams of Last Outage of Second Period of Second 10-yr Interval
ML20245L284
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/09/1989
From: Ginoir D, Metell A
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20245L275 List:
References
NUDOCS 8907050431
Download: ML20245L284 (40)


Text

, _ . _ _ _. - _

di ,

.g VERMONT YANKEE NUCLEAR POWER CORPORATION 1989 IN-SERVICE INSPECTION

SUMMARY

REPORT FEBRUARY 1, 1989 THROUGH APRIL 7, 1989 Prepared By: ad C. ,dd fd PLANT IN-SERVICE INSPECTION COORDINATOR Approved By: '

df. 2. ~

aN//

ENGINEERING SUPPORT SUPERVISOR D

fh[CK0500027j 1 890609 G

PNU

f .,

e '&

TABLE OF CONTENTS

1. INTRODUCTION

- 2. EXAMINATION METHODS

3. EVALUATION OF DATA
4. ' EXAMINATION RESULTS 15 . CONCLUSIONS ATTACHMENT A FORM NIS-1,0WNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS P

l

\'

l

~

VERMONT YANKEE NUCLEAR POWER CORPORATION 1989 IN-SERVICE INSPECTION

SUMMARY

REPORT l

FEBRUARY 1, 1989 THROUGH APRIL 7, 1989

1. INTRODUCTION The attached Form NIS-1, " Owner's Data Report for In-Service Inspection,"

describes the in-service inspections performed during 1989 at the Vermont Yankee Nuclear Power Station, Vernon, Vermont. The examinations performed were those of the last outare of the second period of the second ten-year interval. The nondestructi /e examination procedures used for in-service inspection were in accorda7ce with the ASME Boiler and Pressure Vessel Code,Section XI, " Rules for In-Service Inspection of Nuclear Power Plant Components," as referenced by the plant Technical Specifications. The areas subject to examination and the method used were 'n accordance with the Vermont Yankee In-Service Inspection Program and the plant Technical Specifications. This report summarizes the components examined, the types of examinations, the non-conforming conditions noted, and the corrective actions taken. Ultrasonic, liquid penetrant, magnetic particle, and visual examination techniques were employed to perform the required examinations.

2. EXAMINATION METHODS Nondestruct!ve examinations were performed in accordance with the proce-dures contained in the Yankee Atomic Electric Company Engineering Guidelines, Book III, "In-Service Inspection NDE Procedures," or vendor procedures reviewed and approved by Yankee Atomic Electric Company. The examination procedures were reviewed and approved by personnel qualified to SNT-TC-1A, Level III. These procedures conform to the requirements of ASME Section XI, 1980 Edition, Winter 1980 Addenda, except where these editinnt are in conflict with Technical Specification requirements. The in-service examinations were performed and evaluated by personnel qualified as pro-vided for in Section XI. The procedures used for these examinations are listed in Section 10 of the NIS-1 Form.
3. EVALUATION OF DATA The examination results were reviewed at the site by personnel qualified to at least Level II in the examination discipline. Indications were eva-luated to the acceptance standards defined in the Vermont Yankee Nuclear Power Station Technical Specifications.
4. EXAMINATION RESULTS A list of examinations that were performed is contained in Section 10 of the NIS-1 Form. the detailed examination data along with the calibration records, procedures, equipment certifications, and personnel certifications are maintained at the plant site. Upon completion of the corrective actions detailed in Section 12 of the NIS-1 Form, there were no remaining unacceptable conditions. No continuing or follow-up items resulted from mandatory examinations performed under ASME Section XI.
5. CONCLUSIONS The scheduled inspections accomplished during the 1989 In-Service Inspections constituted the total number of inspections required to be completed during Period 2 of the second In-Service Inspection interval.

t

( _ _ _ _ _ _ _ . _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _

L- -

FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, Vr 05354
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
7. COMPONENTS INSPECTED MANUFACTURER NATIONAL COMPONENT OR OR INSTALLER STATE OR BOARD APPURTENANCE MANUFACTURER OR INSTALLER SERIAL NO. PROVINCE NO. NO.

S7fety Class 1 R2:ctor Vessel:

1 Shell Longitudinal Chicago Bridge and Iron N/A N/A N/A

. Seam 3 Closure Head Welds Chicago Bridge and Iron N/A N/A N/A 1 Bottom Head Welds Chicago Bridge and Iron N/A N/A N/A 5 Nozzle to Vessel Chicago Bridge and Iron N/A N/A N/A Welds 5 Nozzle Inner Chicago Bridge and Iron N/A N/A N/A Radius Examinations 8 CRD Penetration Chicago Bridge and Iron N/A N/A N/A Welds 3 Nozzle to Safe-End Chicago Bridge and Iron N/A N/A N/A Welds 2 Closure Head Nuts Chicago Bridge and Iron N/A N/A N/A Piping:

21 Piping Welds Per Referenced Isometrics N/A N/A N/A Ebasco 39 Hanger / Supports Per Referenced Isometrics N/A N/A N/A Ebasco Valves:

8 Valve Bolting Exams Per Referenced Isometrics N/A N/A N/A 2 inches or less Ebasco l

l l

t

r-FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354 ,
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Oate 11/30/72 6. National Board Number for Unit None
7. COMPONENTS INSPECTED MANUFACTURER NATIONAL COMPONENT OR OR INSTALLER STATE OR BOARD APPURTENANCE MANUFACTURER OR INSTALLER SERIAL NO. PROVINCE NO. NO.

SOfety Class 2 Vessels:

1 Nozzle to Vessel Per Referenced Isometrics N/A N/A N/A Weld (reinforcement Ebasco ring to vessel ar.d nozzle) 1 Vessel Shell to Per Referenced Isometrics N/A N/A N/A Head Weld Ebasco 1 Welded Attachment Per Referenced Isometrics N/A N/A N/A Ebasco Piping:

24 Piping Welds Per Referenced Isometrics N/A N/A N/A Ebasco 91 Hanger / Supports Per Referenced Isometrics N/A N/A N/A Ebasco 1 Pump Welded Per Referenced Isometrics N/A N/A N/A Attachment Ebasco I

FORM NIS-1 (Back)

8. Examination dates Febtdary 1, 1989 to April 7, 1989.
9. Inspection intervals from 5/1/83 to 11/30/92.
10. Abstract of examinations. Include a list of examinations and a statement concerning status of work required for current interval.
11. Abstract of conditions nnted.
12. Abstract of corrective measures recommended and taken.

We certify that the statements made in this report are correct and the examina-tions and corrective measures taken conform to the rules of the ASME Code,Section XI.

02te Otnd?_7,19d? Signed Vermont Yankee N.P.C. ByO-6/ gXantManager C:rtificate of Authorization No.(if applicable) DPR-28 Expiration Date 12/11/2007 CERTIFICATE OF IN-SERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State of Vermont and employed by Hartford Steam Boiler 167 Company of Hartford, Connecticut have inspected the components described in this Owner's Data Report during the period 2-/-/39 to db FN9, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this owner's 02ta Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the inspector nor his employer makes any wIrranty, expressed or implied, concerning the examinations and corrective me sures described in the Owner's Data Report. Furthermore, neither, the In;pector nor his employer shall be liable in any manner for any personal injury ~

or property damage or a loss of any kind arising from or connected with this in pection.

D2te /4 Judd 19&9 Y h. Commissions b/B 7S03 HA-/22 2.

In;pector'9 /

Signature National Board, State, Province, and No.

FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301 )
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC (Note 1)

Srfety Class 1 Rsictor Vessel B-A Vessel Shell Weld D-2' UT H-22 Vessel to Flange Weld CD UT H-22 Closure Head AB UT H-22 Circumferential Weld closure Head BC UT,MT H-22 Circumferential Weld Bottom Head HJ UT H-22 Circumferential Weld B-D Nozzle to Vessel Welds N2C UT H-22 N2D UT H-22 N3A UT H-22 N3B UT H-22 119 UT H-22 Nozzle Inner Radius N2C UT H-22 N2D UT H-22 N3A UT H-22 N3B UT H-22 l N9 UT H-22

i

'1 .

FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS /

AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES t

l

1. 0wner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354 3 I
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION

'A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC S fety Class 1 R: actor Vessel (Cont.)

B-E CRD Penetration Welds 02-27 VT-2 H-25 06-23 VT-2 H-26 10-07 VT-2 H-25 10-19 VT-2 H-26 14-11 VT-2 H-26 14-23 VT-2 H-26 14-39 VT-2 H-26 22-15 VT-2 H-26 B-F Nozzle to Safe-End Welds N2C-SE UT,PT 5920-6620 N2D-SE UT,PT 5920-6622 N9-SE-A PT H-?2 B-F Piping-nominal pipe size RHR-29-10 UT,PT 5920-6622 greater than 4 inches, RHR-32-8 UT,PT 5920-6622 dissimilar metal butt welds B-G-1 Vessel Closure Head Nuts 52 MT 5920-485 60 MT 5920-485 l

FORM NIS-l'0WNER'S DATA REPORT:FOR'IN-SERV' ICE INSPECTIONS AS REQUIRED BY THE. PROVISIONS'0F THE ASME CODE RULES

'.1.

Owner Vermont Yankee Nuclear Power Corp.,'R.D. 5, Box-169, Ferry Road,

~

Brattleboro, VT 05301-

.2. Plant Vermont-Yankee' Nuclear Power' Station, P.O.' Box 157,' Vernon, VT 05354

3. Plant Unit 1 4. Owner Certificate of Authorization (if required). DPR-28

. 5. ' Commercial Service Date 11/30/72 6.- National Board Number for Unit None

- 10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR ,

' CATEGORY COMPONENT DESCRIPTION. COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC

' Safety Class 1 Raactor Vessel (Cont.)

B-G-2

- Valves Valve bolts, studs, and Recirc V2-53A- VT-1 5920-6622 nuts Recire V2-43B VT-1 5920-6622 Recire V2-538 VT-1 5920-6622 MN. ST. V2-80B VT-1 H-15 MN. ST. V2-80C VT-1 H-16 FW V2-27A VT-1 H-7 CS V14-13A VT-1 H-12 CS V14-14A VT-1 H-12 CRD Housing Bolts, studs, and nuts 22-15 VT-1 5920-2410 (reinstalled in CRD 34-11) 10-19 VT-1 5920-2410 (reinstalled in CRD 22-15) 22-19 VT-1 5920-2410 (reinstalled in CRD 10-19) l l

u - ..

L FORM'NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1 Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301

2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
l. 3. . Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. -Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC Safety Class 1 R2 actor Vessel (Cont.)

B-G-2 CRD Housing Bolts, studs, and nuts 18-03 VT-1 5920-2410 (reinstalled in CRD 22-19) 26-19 VT-1 5920-2410 (reinstalled in CRD 18-03) 22-11 VT-1 5920-2410 (reinstalled in CRD 26-19) 14-11 VT-1 5920-2410 (reinstalled in CRD 22-11) 02-27 V1-1 5920-2410 (reinstalled in CRD 14-11) 22-30 VT-1 5920-2410 (reinstalled in CRD 02-27) l

  • .(- FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES-
1. Owner Vers,ont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road,

_ Brattleboro, VT 05301 l 2.- Plant Vermont Yankee Nuclear Powt Station, P.O. Box 157, Vernon, VT 05354 '

3. Plant. Unit 1 4. Owner Certificate of Authorization-(if required) DPR-28
5. Commercial Service Date.11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations' i LINE NO. AND/OR

' CATEGORY COMPONENT DESCRIPiEON COMPONENT IDENTIFICATION- EXAMINATION ISOMETRIC Smfety Class 1 Piping

'BJ Pressure retaining welds Recirculation System in piping Loop A AS-1 PT,UT 5920-6622 AS-2 PT,UT 5920-6622 AS-3 PT,UT 5920-6622 AB-2 PT,UT 5920-6622 Recirculation System Loop B N2A-1 PT,UT 5920-6622' N2A-2 PT,UT 5920-6622 Line RHR 30 30-1 PT,UT 5920-6622 30-2 PT,UT 5920-6622 Line RWCU-18 18-1 PT,UT 5920-6622

- __ _ _ __ _ ______--- ._. _ l

i ..

x FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS

  • /

AS' REQUIRED BY THE FR0 VISIONS OF THE ASME CODE RULES

1. 0wner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301-
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 167, Vernon, VT 05354
3. : Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC

' Safety Class 1 Rsictor Vessel (Cont.)

B-G-2 Piping (Cont.)

BJ (Cont.) Pressure retaining welds in piping Line MS78 B6D MT,UT H-16 Line MS7C C6D MT,UT H-16 C7A MT,UT H-16 Line MS70 D10 MT,UT H-17 Line FDW-16 MF7 MT,UT H-7 ,

MF7A MT,UT H-7 i i

Line FDW-17 MF-4 MT,UT H-8 j MF-4B MT,UT H-8 l

' ~* *

' FORM NIS-1.0WNER'S DATA REPORT FOR IN-SERVICS INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

'1.. Owner . Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, 'q Brattleboro, VT 05301

2. . Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit- 1 4. Owner-Certificate of-Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit' None
10. ABSTRACT OF EXAMINATION l, A. Nondestructive Examinations

.LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT' IDENTIFICATION EXAMINATION ISOMETRIC

'Stfety Class 1 Raactor Vessel (Cont.)

B-G-2 Piping (Cont.)

i BJ (Cont.) Pressure retaining welds .)'

in piping Line MSAA F-1 MT,UT H-20 Line MS7B B5B MT,UT H-15 B-N-1 Reactor Vessel Internals Accessible Area VT-3 N/A F-C (Cont.) Component Standard Line FDW-19 Supports FW-4 VT-3,4 H-7 FW-5 VT-3 H-7 FW-6 VT-3,4 H-7 FW-10 VT-3 H-7 Line FDW-18 FW14 VT-3,4 H-8 FW-22 VT-3 H-8 FW-18 VT-3,4 H-8 FW-21 VT-3 H-8 l

f

' ~

  • FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS;
AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

" ' 1 '. Owner: Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road,

~

Brattleboro, VT 05301 12'.- Plant- Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354

3. Plant Unit 1 4. Owner Certificate of Authorization (if required)f DPR-28 5.- Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISDMETRIC-Snfety Class 1 Piping (Cont.)

F-C (Cont.) Component Standard Supports Line FDW-20 FW-16 VT-3,4 H-8 FW VT-3,4 H-8 Line MS-A MS-1 VT-3,4 H-14 Line MS-D MS-33 VT-3,4 H-17 MS-35 VT-3,4 H-17 Line MS-4A HPCI-3 VT-3,4 H-20 HPCI-4 VT-3 H-20 Line CUW-18 CU-4 VT-3,4 H-13 CU-7 VT-3 H-13

' FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION i A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC Sefety Class 1 Piping (Cont.)

F-C (Cont.) Component Standard Supports Line RHR-28 RHR-8 VT-3,4 5920-6808 Line RHR-29 RHR-6 VT-3,4 5920-6808 H-103 VT-3 H-5 Recire Loop A RR-29 VT-3,4 5920-6802 RR-30 VT-3,4 5920-6802 RR-16 VT-3,4 5920-6802 RR-22 VT-3,4 5920-6802 RR-37 VT-3,4 5920-6802 RR-2 VT-3,4 5920-6802 RR-28 VT-3 5920-6802 RR-27 VT-3 l

L____-.

i FORM NIG-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS l AS REQUIRED BY THE PROVISIONS'0F THE ASME CODE RULES l 1

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301 ]

{

2. Plant . Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354 l
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) OPR-28
5. Commercial Service Date 11/30/72- 6. National Board Number for Unit None ,

l i

10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC Stfety Class 1 Piping (Cont.)

F-C (Cont.) Component Standard ,

Supports _

l Recire Loop B RR-65 VT-3,4 5920-6802 j l

RR-66 VT-3,4 5920-6802 RR-83 VT-3,4 5920-6802 RR-75 VT-3,4 5920-6802 RR-59 VT-3,4 5920-6802 RR-81 VT-3 5920-6802 RR-71 VT-3 5920-6802 S7fety Class 2 VIssels C-A Pressure Retaining Welds A-RHR Heat Exchanaer in Pressure Vessels 10-5 UT I-20 AN4 VT-1,MT I-20 C-C Integral Attachments for A-RHR Heat Exchanaer Vessels, Piping, Pumps, and Valves A-RHR-CC-3 PT I-21

(

i o I E__-___--.-_

M -

FORM NIS-l'0WNER'S DATA REPORT FOR'IN-SEaVICE INSPECTIONS' s

.AS REQUIRED BY.THE PROVISIONS.0F THE A!iME CODE RULES ~

l'

1. Owner Vermont ~ Yankee Nuclear Power Corp., R.D. 5, Box;169, Ferry Road, nu Brattleboro, VT 05301 2.:-Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354

- 3. Plant Unit 1 4. Owner Certificate of Authorization (if required)' DPR-28

5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO..AND/OR

- CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC.

SQfety Class 2

- Piping.

. C-F-2 Pressure Retaining Welds Line FW-16 in Piping S-2 MT,UT I-27 Line FW-17  !

S-8 MT,UT I-27 Line RCIC-4 S-37 MT,UT I-27 Line RHR-1A S28 MT,UT I-7A Line RHR-3D S206 MT,UT I-10B l

S200 MT,UT I-10B Line RHR-5B S220 MT,UT I-11 Line RHR-6 S233 MT,UT I-12

FORM NIS-1-0WNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES i

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC Safety Class 2 Piping (Cont.)

C-F-2 (Cont.) Pressure Retaining Welds Line RHR-7 in Piping S261 MT,UT I-13 Line RHR-9 S320 MT,UT I-15 Line RHR-14 T373 MT,UT I-16 Line RHR-20 S385 MT,UT I-16A Line RHR-40 S440 MT,UT I-17 Line HPCI-3 T33 MT,UT I-3 1.ine HPCI-15B S103 MT,UT I-4 Line MS-4B S188 MT,UT I-2 Line CS-1A T1 MT,UT I-6C

FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS t

AS REQUIRED'BY THE PROVISIONS'0F THE A9ME CODE RULES

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28

^5. Commercial Service Date 11/30/72 6. National Board Number for Unit None

10. ABSTRACT OF EXAMINATION ,

l A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC

-S7fety Class 2 Piping (Cont.) .

1 C-F-2 (Cont.) Pressure Retaining Welds Line CS-1B in Piping T18 MT,UT I-6D' S30 MT,UT I-6D Line CS-6B S120 MT,UT I-6B Line CRD-4 P2 MT,UT I-19 Line CST-4 S25 MT,UT I-31 Line PCAC-2 S25 MT,UT I-32 Line PCAC-13 T-57 MT,UT I-33 F-A Plate or Shell Type CS-P-46-1B VT-3 I-6B Support RHR-P-10-1C VT-3 I-10A F-C Component Standard Line RHR 18 Supports H-22 VT-3,4 I-7B  ;

(

L __ ___ __ __

t  : 8.

(*' 'E  ; FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS ~ ,

AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES'

1. .Jhener Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT' 05301

( 2. : Plant , Vermont Yankee Nuclear ' Power Station, P.O. Box 157, Vernon, VT- 05354

~3'. LPlant. Unit .1 4. Owner Certificate of Authorization (if required) DPR-28

5. ' Commercial Service Date 11/30/72' 6. National' Board Number for Unit None 10." ABSTRACT OF EXAMINATION 1- 1 A. ' Nondestructive Examinations LINE NO. AND/OR

' CATEGORY. = COMPONENT DESCRIPTION COMPONENT IDENTIFICATION ' EXAMINATION ISOMETRIC Safety Class 2

. Piping (Cont.) ,

'F-C-(Cont.) Component Standard Line RHR-2A Supports

'H-184 VT-3,4 I-8 HD-184A tVT-3 I-8 HD-1848 (Note 2) .VT-3,4 I-8 Line RHR-28 HD-127J VT-3,4 I-9 HD-127F VT-3,4 I-9 Line RHR-6 HD-200B VT-3 I-12 H-187 VT-3 I-12

FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. P.lant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC Safety Class 2 Piping (Cont.)

F-C (Cont.) Component Standard Line RHR-7 Supports HD-16C VT-3 I-13 Line RHR-8 H-16 VT-3 I-14 Line RHR-9 H-191 VT-3,4 I-15 HD-1948 VT-3 I-15 HD-87 VT-3 I-15 HD-191 VT-3 I-15 l

j' Line RHR-10 CS-HD-54D VT-3,4 I-15A Line RHR-12 CS-HD-86A VT-3 I-16A Line RHR-15 CS-H-86A VT-3 I-16 1

l

\

?. . '

g ,

.j .

b 9: 1 V -FORM NIS-1;0WNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS z

, AS REQUIRED BY'THE PROVISIONS'0F.THE ASME CODE. RULES

'1 7.,0wner . Vermont Yankee Nuclear Power Corp.', R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301 L2.i Plant Vermont Yankee Nuclear Power Station, P.O. Box 157,'Vernon, VT-'05354 s

n , 1,

3. -Plant Unit '4. Owner Certificate of Authorization.(if required)- DPR-28, l5. Commercial. Service Date 11/30/72 6. National Board Number for Unit None

~10. ABSTRACT OF EXAMINATION-A. . Nondestructive' Examinations LINE NO. AND/OR. ,

F, CATEGORY. COMPONENT: DESCRIPTION COMPONENT IDENTIFICATION. EXAMINATION ' ISOMETRIC S5fety Class'2 Piping.(Cont.)-

F-C (Cont.) Component Standard. Line RHR-20 '

Supports' . _

CS-HD-86C-(Note:2)' VT-3,4 'I-16A Line RHR-23

,: CS-HD-54C VT-3'- I-15A.

Line RHR-39 HD-6 VT-3 I HD-8 VT-3 I-18 Line RHR-40 HD-27 VT-3 1-17 HD-30 VT-3 I-17 1

HD-3 VT-3 'I-17 '1 HD-24 VT-3 I-17 HD-36 VT-3,4 I-17 HD-6 VT-3 I-17 Line RCIC-3 l

H-63 VT-3 I-26A l i

H-62 VT-2 I-26A I l

)

i I

-a.----.--nk.n_x-aw------- . - . _ _ - - - -

M ;y '

l

- .'* FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS

'. AS REQUIRED BY THE PROVISIONS OF THE ASME' CODE RULES'

1. Owner Vermont Yankee Nuclear Power' Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301

' 2 .: . Plant Vermont Yankee Nuclear Power Station, P.0' BoxL157, Vernon, VT 05354 3.: Plant Unit' 'l 4. Owner Certificate of Authorization (if required) DPR-28

5. LCommercial Service Date 11/30/72 6.. National-Board Number for Unit None i L 10. ABSTRACT OF EXAMINATION

'A. Nondestructive Examinations LINE NO. AND/OR

CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION. EXAMINATION. ISOMETRIC

/S5fety Class 2 Piping (Cont.)

F-C (Cont.) Component Standard Line RCIC-4 Supports H-86 VT-3 I-26 H-87 VT I-26 Line CS-1A H-57 VT-3 1-6C HD-57D VT-3 I-6C Line CS-1B

-HD-60C VT-3,4 I-6D HD-60A VT-3 I-6D Line CS-2A H-89 VT-3 I-6A HD-61C VT-3 I-6A HD-90A VT-3 I-6A HD-52B VT-3,4 I-6A CS-HD-90C VT-3,4 I-6A

f' FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS ,

'O  !

.AS REQUIRED BY THE PROVISIONS OFLTHE ASME CODE RULES-

' 1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box-169, Ferry Road,

~

Brattleboro, VT' 05301

2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT- 05354 i
3. Plant Unit l' '4. Owner Certificate of Authorization (if required') DPR-28
6. Commercial Service Date 11/30/72 6. National Board Number for Unit None

'{

10.' ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR CATEGORY. COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC c

S2fety Class 2-Piping (Cont.)

F-C (Cont.) Component Standard Line CS-2A-Supports H-52 .VT-3 I-6A HD-54G VT-3 I-6A H-90 VT-3 I-6A Line CS-28 HD-46 VT-3 1-6B H-56 VT-3 I-6B Line PCAC-2 H-27 VT-3 I-32 HD-26A VT-3,4 I-32 H-23 VT-3 I-32 HD-22B VT-3 I-32 Line PCAC-6 HD-34 VT-3 I Line PCAC-10 H-29 VT-3 I-33

FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.- Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301 l 2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354 l

3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC Safety Class 2 Piping (Cont.)

F-C (Cont.) Component Standard Line SGT-1B Supports HD-205C VT-3 1-35 Line SGT-14 V-1 VT-3 I-34 H-119 VT-3 I-34 HD-205B VT-3 I-34 Line CST-4 HD-58B VT-3,4 I-31 HD-880 VT-3 I-31 HD-88A VT-3,4 I-31 Line CST-27 j HD-58E VT-3,4 I-31 Line CRO-5 i

HD-17 VT-3 I-23 HD-18 VT-3 I-23 I

)

._- ___ _-__-__-___a

a. .
  • !
  • FORM NIS-1 OWNER'S DATA REPORT FOR-IN-SERVICE INSPECTIONS.

AS. REQUIRED BY THE PROVISIONS OF.THE ASME CODE RULES

, 1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road,

" Brattleboro, VT 05301

2. ~ Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. ' Plant Unit 1 4. Owner Certificate of Authorization (if required). DPR-28
25. . Commercial. Service Date 11/30/72- 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC

'Sofety Class 2 Piping'(Cont.)

F-C.(Cont.)' Component Standard Line CRD-5A Supports HD-2 VT-3 1-23 HD-3 VT-3 I-23 Line CRD-6 HD-111 VT-3 1-23 HD-110 VT-3 I-23

.Line CRD-7 HD-11 VT-3 I-23 HD-13 VT-3 I-23 HD-14 VT-3 I-23 HD-15 VT-3 I-23 Line CRD-8 HD-105 VT-3 I-23 s HD-106 VT-3 1-23 HD-107 VT-3 I-23 1

4 FORM-NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION A. Nondestructive Examinations LINE NO. AND/OR CATEGORY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC Stfety Class 2 Piping (Cont.)

F-C (Cont.) Component Standard Line MS-4B Supports HD-102 DN (Note 2) VT-3,4 I-2 H-103B VT-3,4 I-2 ,

I HD-103 EN (Note 2) VT-3,4 I-2 HD-6 VT-3,4 I-2 H-A10 VT-3,4 I-2 HPCI-B-PHP HD-202 VT-3 I-26A Line HPCI-3 HD-107A VT-3,4 I-3 HD-107C VT-3,4 I-3 H-107 VT-3 I-3 Line HPCI-4 HD-84 VT-3,4 I-5B HD-85A VT-3,4 I-58

FORM NIS-1 OWNER'S' DATA REPORT FOR IN-SERVICE INSPECTIONS

    • =

AS REQUIRED BY THE PROVISIONS OF THE-ASME CODE RULES 5$ Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road,-

Brattleboro, VT- 05301

2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit 1 4. -Owner Certificate of Authorization-(if! required) OPR-28 5.- Commercial' Service Date 11/30/72 6. National' Board Number for Unit None
10. ABSTRACT OF EXAMINATION

^A. Nondestructive Examinations LINE NO. AND/OR CATE00RY COMPONENT DESCRIPTION COMPONENT IDENTIFICATION EXAMINATION ISOMETRIC Ssfety Class 2 Piping (Cont.)

F-C (Cont.) Component Standard Line HPCI-2 Supports H-22 VT-3 I-5C Line HPCI-15-B H-32 VT-3,4 I-4 HD-220 VT-3 I-4 HD-228 VT-3,4 I-4

FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION B. Hydrostatic Tests (note 3)
1. Service Water System A. Test No. 1A This test was satisfactorily performed and included SW piping from the SW supply header isolation valve SW-15A, to the "A" RBCCW HX discharge header isolation valves SW-928 and SW-920.

B. Test No. 2 and 19 This test was satisfactorily performed and included the RBCCW pump discharge lines from valves V70-94A and 948, through the RBCCW heat exchangers, fuel pool heat exchangers, the CRD and RHR pump coolers and up to but not including the RCU pump coolers, RCU non-regenerative heat exchanger, and the sample system coolers.

C. Test No. 5 and 9 This hydrostatic test was satisfactorily performed and encompassed the RHR-SW 1B pump motor cooling coil.

D. Test No. 6 and 10 This hydrostatic test was satisfactorily performed and encompassed the j RHR-SW 1D pump motor cooling coil. J E. Test No. 11 This hydrostatic pressure test was satisfactorily performed and included the RBCCW return piping from the CRD pump coolers, RHR pump coolers and the primary containment air compressor. The boundary also included piping from the RBCCW Surge Tank and the chemical feeder tank and extended to the RBCCW pumps.

F. Test No. 12 This hydrostatic pressure test wa's satisfactorily performed and included RHR-SW piping from RHR-SW pomp discharge isolation valves SW-36A and 39A, to RHR HX 'A' discharge isolation valve V10-192A, and RHR-SW X-TIE valve SW-36B.

FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

~~

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION B. Hydrostatic Tests (Cont.)
1. Service Water System (Cont.) l G. Test No. 13 This hydrostatic pressure test was satisfactorily performed and included RNR-SW piping from RHR-SW pump discharge isolation valves SW-37B and 39B, to RHR HX 'B' discharge isolation valve V10-192B, and RHR-SW X-TIE Valve SW-368.

H. Test No. 15A This hydrostatic pressure test was satisfactorily performed and included SW piping from the SW supply header isolation valve SW-15-B, to the 'B' RBCCW HX discharge header isolation valves SW-92B and SW-92C.

I. Test No. 16 This hydrostatic pressure test was satisfactorily performed and encom-passed the 'A' diesel cooling expansion tank piping.

J. Test No. 17 This hydrostatic pressure test was satisfactorily performed and encom-passed the 'B' diesel cooling expansion tank piping.

} l

FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS.

AS REQUIRED BY THE PROVISIONS OF THE'ASME CODE RULES
1. Owner . Vermont Yankee Nuclear Powee Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301-
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. . Plant Unit 1 '4. Owner Certificate of Authorization (if required) DPR-28 5.. Commercial Service Date 11/30/72 6. . National Board Number for Unit None 10.' ABSTRACT OF EXAMINATION

_B. Hydrostatic Tests (Cont.)

2.- Core Spray System A. Test No. 1 This hydrostatic test was satisfactorily performed and encompassed the eight inch CS-38 line and a three quarter inch CS vent line. The test boundary extends from the MOV-12B valve to the MOV-118 valve and includes'the 248 valve.

B. Test-No. 3 This hydrostatic test was satisfactorily performed and encompassed the twelve inch CS-1B and ten inch CS-2B lines. The test boundary extended from the MOV-7B to MOV-8B valves and continues downstream through the-pump and ten inch CS-2B to MOV-118.

C. Test No. 4 This hydrostatic test was satisfactorily performed and encompassed the twelve inch CS-1A and ten inch CS-2A lines. The test boundary extended from the MOV-7A to CS-2A and MOV-11A.

3. RHR System i

'h A. Test No. 2 This hydrostatic pressure test was satisfactorily performed and included the RHR shutdown cooling piping from the RHR-17 valve to the RHR-15 (A-D) valves.

4. HPCI System A. Test No. 2 This hydrostatic pressure test was satisfactorily performed and I included the HPCI turbine exhaust line from the HPCI-65 valve to the L HPCI-12 valve.

B. A system hydrostatic test was satisfactorily performed which encom- l passed the piping from FCV-43 to FCV-42. This test was performed to ,

satisfy the requirements of IWA-4400 following the replacement, by management decision, of this 1" piping.

  • i ' *! FORM'NIS-l'0WNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS.

AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. - Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O.' Box 157, Vernon, VT 05354
3. Plant Unit 1 4.- Owner Certificate of Authorization (if required) DPR-28 5.- Commercial Service Date 11/30/72 6. National Board Number for Unit None
10. ABSTRACT OF EXAMINATION B. Hydrostatic Tests (Cont.)
5. RCIC System A system hydrostatic test was satisfactorily performed which encompassed the piping from FCV-34 to FCV-35. This test was performed to satisfy the requirements of IWA-4400 following the replacement, by management decision, of this 1" drain piping.
6. Reactor Pressure Vessel Safety Class 1: A partial system hydrostatic test.

which included the Main Steam Line flow sensing. lines was satisfactorily performed. This test was performed to satisfy the requirements of IWA-4400.

Notes (Section 10)

1. Referenced isometric drawings are contained in the Vermont Yankee In-Service Inspection Program.

.2.- Baseline examination performed in accordance with IWA-4500.

3. Subject hydrostatic tests performed satisfactorily with no notable conditions.

C. ' Ultrasonic Examination Procedures

1. YA-UT-1, Revision 5, Ultrasonic Examination - General Requirements
2. YA-UT-3, Revision 2, Ultrasonic Examination of Vessels - Flange to Shell

. Weld from the Flange Face

3. YA-UT-9, Revision 4, Ultrasonic Examination of Piping - Ferritic Welds
4. YA-UT-10, Revision 7, Ultrasonic Examination of Piping - Austenitic Welds
5. YA-UT-11, Revision 4, Ultrasonic Examination of Piping - Dissimilar Metal Welds
6. YA-UT-13, Revision 1, Ultrasonic Examination of Vessels - Nozzle Inner Radius
7. YA-UT-19, Revision 0, Component Profile Using the Zero Degree Pulse Echo Technique I

^ s FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS. REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. ~0wner' Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354 3; Plant Unit- '1 4. Owner Certificate of Authorization (if required). DPR-28
5. Commercini Service Date 11/30/72 6. National Board Number for Unit None-
10. ABSTRACT OF EXAMINATION C. Ultrasonic Examination Procedures (Cont.)
8. YA-UT-22, Revision 2, Ultrasonic Examination of Vessels - Circumferential, Longitudinal Meridional and Flange Welde
9. YA-UT-44, Revision 2, Ultrasonic Examination of Vessels - Nozzle to Vessel Welds
10. YA-UT-45, Revision 0, Ultrasonic Examination of the Vermont Yankee Feedwater Nozzle Inner Radius Region D. Magnetic Particle Examination Procedure
1. YA-MP-111, Revision 2, Magnetic Particle Examination E. Liquid Penetrant Examination Procedure
1. YA-PE-2, Revision 6, Liquid Penetrant Examination
11. ABSTRACT OF CONDITIONS NOTED

.Gafety Class 1 l A. Category B-A

1. During ultrasonic examination of the Reactor Head circumferential weld A-B, a mid-wall ultrasonic reflector was identified.

B. Category B-G-2

1. During visual examination of the valve bolting on component V2-53B, one (1) nut was identified as having mechanical damage.
2. During visual examination of the valve bolting on component V2-80B, eleven nuts were identified as having incomplete thread engagement.

.C. Cateoory B-J

1. During magnetic particle examination of weld C7A, line MS7C, one rejectable linear indication was identified in the base material adjacent to the weld.
2. During magnetic particle examination of weld MF-4, line FDW-17, five rejec-table linear indications were identified in the base material adjacent to the weld.

"' ' '* FORM NIS-l'0WNER'S DATA REPORT FOR'IN-SERVICE INSPECTIONS. 1)

AS REQUIRED BY THE' PROVISIONS OF THE ASME CODE RULES

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box'169, Ferry Road, Brattleboro, VT 05301 2.' Plant Vermont Yankee Nuclear Power Station,-P.O.' Box 157, Vernon, VT 05354

~

t- ..

3. Plant Unit. 1' 4. Dwner Certificate of Authorization (if required) OPR '
5. Commercial Service Date.11/30/72 6. National Board Number for' Unit None
11. ABSTRACT OF CONDITIONS NOTED (Cont.)

Safety Class 1 (Cont.)

C. Cateaory B-J 3.. During magnetic particle examination of weld MF-4B, line~FDW-17, five rejec-table. linear indications were' identified in' the base material adjacent: to the weld.

4. . During magnetic particle examination of weld F-1, line MS4A, three rejec--

table linear indications were identified in the base material adjacent to the weld.

D. Category B-P

1. During a visual examination / leakage check of the Safety Class 1 system, it was identified that a 1" flow sensing.line to the "A" Main Steam Line Flow Element was leaking.

~E. Category F-C

1. During visual examination of support CS-1, line CS-48, four nuts were iden-tified as having incomplete thread engagement.
2. During visual examination of support CS-2, line CS-4A, four nuts were iden-tified as having incomplete thread engagement.
3. During visual examination of support RR-83, recirculation system, one nut was identified as having incomplete thread engagement.
4. During visual examination of support HPCI-3, line MS-4A, one nut was iden-tified as having incomplete thread engagement.
5. During visual examination of support HPCI-4, line MS-4A, one nut was iden-tified as having incomplete thread en0agement. In addition, an unbent cotter pin was observed.
6. During visual examination of support FW-5, line FDW-19, a missing cotter pin was noted.
7. During visual examination of support RR-59, recirculation system, the spring ,

l can luad setting was identified as being incorrect.

l l' - ' *- FORM NIS-1 GW4ER'S DATA REPORT'FOR IN-SERVICE. INSPECTIONS 4

)

AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES j

. /. - )

1 L1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301 -

2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354 I l
3. Plant Unit 1- 4.' Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6.. National Board Number for Unit None

,11. ABSTRACT OF CONDITIONS NOTED'(Cont.)

Safety Class 1 (Cont.)

10 . Cateoorv F-C (Cont.)

, 8. During visual examination of support CU-4, line CUW-18, the' spring can load setting was identified as being incorrect.

9. During visual examination of support MS-1, line MS-A, the spring can load.

setting was identified as being incorrect.

10. During visual examination'of support MS-33, line MS-D, the spring can load-setting was identified as being incorrect.
11. During visual examination of support RHR-8,' line RHR-29, the spring can load setting was identified as being incorrect.

Safety Class 2 A. Cateoory C-8

1. During magnetic particle examination of A-RHR Heat Exchanger weld A-N4, a rejectable linear indication was identified in the base material.

m B. Category C-F-2

1. During magnetic particle examination of weld S-2, line FW-16, three rejec-table linear indications were identified in the base material.
2. During magnetic particle examination of weld S-28, line RHR-1A, one rejec-table linear indication was identified in the base material.
3. During magnetic particle examination of weld T-33, line HPCI-3, one rejec-table linear indication was identified in the base material.
4. During magnetic particle examination of weld P-2, line CRD-4, one rejectable linear indication was identified in the base material.

l

FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Br_attleboro, r VT 05301

2. Plant -Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None
11. ABSTRACT OF CONDITIONS NOTED (Cont.)

Safety Class 2 C. Category F-C

1. During visual examination of support H-191, line RHR 9, one nut was iden-tified to have incomplete thread engagement. In addition, one lock nut was found to be loose.
2. During visual examination of support H-22, lirse HPCI-2, one nut was iden-tified to have incomplete thread engagement.
3. During visual examination of support HD-202, HPCI-BPMP, two nuts were iden-tified as having incomplete thread engagement.
4. During visual examination of support V1, line SGT-14, one nut was identified as having incomplete thread engagement.
5. During visual examination of support HD-205B, line SGT-14, one nut was'iden-tified as having incomplete thread engagement. In addition, the base plate was identified as being bent.
6. During visual examination of support H-56, line CS-2B, two nuts were iden-tified as having incomplete thread engagement.

! 7. During visual examination of support CS-HD-54D, line RHR-10, one nut was identified as having incomplete thread engagement.

8. During visual examination of support HD-84, line HPCI-4, the spring can load setting was identified as being incorrect.

{

9. During visual examination of support HD-60C, line CS-1B, the spring can load setting was identified as being incorrect.
10. During visual examination of support HD-85A, line HPCI-4, one nut was iden-tified as being loose.
11. During visual examination of support HD-107C, line HPCI-3, one nut was iden-tified as being loose.
12. During visual examination of support H-87, line RCIC-4, one nut was iden-tified as being loose.
13. During visual examination of support HD-24, line RHR-40, one nut was iden-tified as being loose.

5 .

, J4) . . ; .

FORM NIS-1 OWNER'S DATA' REPORT FOR IN-SERVICE INSPECTIONS L '

AS REQUIRED'BY THE PROVISIONS OF THE ASME CODE RULES

. 1.- Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301 2.L Plant ' Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354

, . 3. Plant Unit 1 4. Owner Certifice':e of Authorization (if required) 'DPR-28

5. -Commercial Service Date 11/30/72 6. National Board Number for Unit- None 11.' ABSTRACT OF CONDITIONS NOTED (Cont.)

Safety Class 2 C. Cateaory F-C (Cont.)

14. During visual examination of support CS-HD-86A, line RHR-12, the rod end bushing clearance was identified as incorrect.
15. During visual examination of support HD-191, line RHR-9, a cracked weld was identified on the base plate.
16. During visual examination of support HD-103EN, line MS-4B, a damaged washer was identified.

.17. During visual examination of support.P-10-1C, RHR system, cracked. grout was identified on the pump base plate.

12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN~

Safety Class 1 A. Cateaory B-A

1. The mid-wall ultrasonic reflector identified with the 60* search unit was evaluated in accordance with procedure YA-AS-XI, (acceptance criteria for ASME Sec. XI Examination) and found to be acceptable for continued service.

The indication was not observed during the 45' examination and was deter-mined to be a fabrication defect, not service related.

B. Category B-G-2 q

1. The mechanical damage of the nut on valve V2-539 was evaluated by the Yankee Atomic Mechanical Services Group. The damage was determined to be installa- i tion related and insignificant to the proper function of the component. l
2. .The incomplete thread engagement identified on valve V2-80B was evaluated by the Yankee Atomic Mechanical Services Group. The condition was determined to be installation related and insignificant to the proper function of the component.

.C 'L' - ' FORM NIS-1 OWNER'S DATA REPORT.FOR IN-SERVICE INSPECTIONS t AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES'

1. . Owner? Vermont Yankee Nuclear Power Corp.,'R.D. 5, Box 169,' Ferry Road, Brattleboro, VT 05301
2. Plant Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR 5.. Commercial Service Date 11/30/72' 6. National Board Number for Unit None 1

=12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN (Cont.)

sSafety Class l'(Cont.)

d C. Category B-J j

-1. The rejectable magnetic particle indications identified on weld C7A'(MS-7A),

MF-4 (FDW-17), MF-4B (FDW-17) and F-1 (MS-4A) were subsequently removed or reduced to acceptable size by' manual surface conditioning. These indica-tions were determined to be seams caused by the pipe fabrication process.

Therefore, no sample expansion was required.

D. Cateaory B-P

1. The leakage identified on the 1" welded flow sens'ing line on the "A" Main Steam Line Flow Element was determined to be the result of inadequate-welding performed during initial construction. ~This connection was weld repaired-and inspected in accordance with IWB 4000. Three other similar connections were inspected and verified acceptable.

~E.- Cateaory F-C

1. 'The incomplete thread engagement identified on supports CS-1, CS-2, RR-83, HPCI-3, and HPCI-4 was evaluated by the Yankee Atomic Mechanical Services Group. The conditions were determined to be installation related and

-insignificant to the proper function of the component. A maintenance _

request was generated and the unbent cotter pin on support HPCI-4 was repaired.

2. A maintenance _ request was generated and a cotter pin was installed on sup-port FW-5. The cause of the missing cotter could not be determined. This condition was evaluated and it was concluded that it was insignificant con-sidering the physical configuration and that the support was operable at all times.
3. Maintenance requests were generated and spring can load settings on supports RR-59, CU-4, MS-1, MS-33, RHR-8 were readjusted. These hangers evidently drifted from their settings due to system dynamics effects.

I

  • ~* FORM NIS-1 OWNER'S DATA REPORT FOR IN-SERVICE' INSPECTIONS '

AS REQUIRED BY THE PROVISIONS'0F THE ASME_ CODE RULES I I. 0wner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301 p 2. Plant Vermont Yankee Nuclear Power ~ Station, P.O. Box 157, Vernon,.VT 05354

.]

u

3. Plant Unit 1 4. Owner Certificate of Authorization (if required) DPR-28
5. Commercial Service Date 11/30/72 6. National Board Number for Unit None ']

l

'l

.12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED'AND TAKEN-(Cont.) -

U 1

Safety Class 2 A. Category C-B

1. The rejectable linear indication on weld A-N4 was subsequently removed by manual surface conditioning. The indication was determined to be a seam caused by the pipe fabrication process. Therefore, no sample expansion was required.

B. Category C-F-2

1. The rejectable linear indications identified on welds S-2 (line FW-16),

S-28, (line RHR-1A), P-2 (line CRD-4) were subsequently removed by manual surface conditioning. The indications were determined to be. seams caused by the pipe fabrication process. Therefore, no sample expansion was required.

2. The rejectable linear indication on weld T-33 (line HPCI-3) was evaluated in accorCsnce with procedure YA-AS-XI (Acceptance Criteria for Section XI

-Examination) and found to be acceptable for continued service.

C. Category F-C

1. The incomplete thread engagement identified on supports H-191 (RHR-9), H-22 (HPCI-2), HD-202 (HPCI-BPMP), VI (SGT-14), H-56 (CS-28), CS-HD-54D (RHR-40) were evaluated by the Yankee Atomic Mechanical Services Group. The con-dition was determined to be installation related and insignificant to.the proper function of the component.
2. A Maintenance Request was generated and the spring can load settings on sup-ports HD-84 and HD-60C were readjusted.
3. Maintenance request were generated and the loose nuts identified on supports HD-85-A, HD-107C, H-87 and HD-24 were tightened.
4. The rod end bushing clearance on support CS-HD-86A was evaluated by engi-neering and determined to be acceptable for continued service.
5. A maintenance request was generated and the cracked weld on support HD-191 was repaired. This condition was evaluated by the Yankee Atomic Mechanical Services Group and determined to be fabrication related.

1

., 3:

h f *D " *- ' FORM NIS-1 DWNER'S DATA REPORT FOR -IN-SERVICE INSPECTIONS ' >

i AS' REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Vermont Yankee Nuclear Power Corp., R.D. 5, Box 169, Ferry Road, Brattleboro, VT 05301

~:2 '. - Plant. Vermont Yankee Nuclear Power Station, P.O. Box 157, Vernon, VT 05354

'3.,' Plant Unit 1- .4.- Owner Certificate of Authorization-(if required). DPR-28 5..' Commercial Service Date~11/30/72 6. National Board Number for Unit None L

12. ABSTRACT OF CORRECTIVE MEASURES RECOMMENDED AND TAKEN-(Cont.)

=

Safety Class-2-(Cont.)

C. Category F-C (Cont.)-

6. The' damaged washer on support HD-103EN was evaluated by engineering and determined to-be acceptable for continued services.
7. A maintenance request was generated and the cracked grout on pump P-10-1C was repaired.

DCG/thm:ES9056.1/DCG I

i I