Advises That 890210 & 0601 Responses to Generic Ltr 88-17 Re Expeditious Actions for Loss of DHR Appear to Meet Intent of Ltr.Encl Listing Observations Re Util Responses Encl
ML20245L080
Person / Time
Site: Comanche Peak 
Issue date: 06/27/1989
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
GL-88-17, TAC-69734, NUDOCS 8907050370
Download: ML20245L080 (7)


Text

UNITED STATES (3

p, NUCLEAR REGULATORY COMMISSION

~

j,

~/ j WASHINGTON, D. C. 20555

% %.e4,#

June 27, 1989 Docket No. 50-445 Mr. William J. Cahill, Jr.

Executive Vice President, Nuclear Texas Utilities Electric Company 400 North Olive Street, L.B. 81 Dallas, Texas 75201

Dear Mr. Cahill:

SUBJECT:

COMMENTS ON THE TEXAS UTILITIES ELECTRIC COMPANY RESPONSE TO GENERIC LETTER 88-17 WITH RESPECT TO EXPEDITIOUS ACTIONS FOR LOSS OF DECAY HEAT REMOVAL FOR COMANCHE STEAM ELECTRIC STATION UNIT 1 (TAC NO. 69734)

Generic Letter 88-17 (G.L. 88-17) was issued on October 17, 1988 to address the potential for loss of decay heat removal (OHR) during nonpower operation.

In the generic letter, NRC requested (1) a dricription of your efforts to implement the eight recomended expeditious actions of the generic letter and (2) a description of the enhancements, specific plans and a schedule for implementation of the six recomanded program enhancements.

The NRC staff has reviewed your response to G.L. 88-17 on expeditious actions in the letters of February 10, 1989 and June 1, 1989. Your letter of February 10, 1989 also included the response for programmed enhancements which we will review at a later date. We find that your response appears to meet the intent of the generic letter with respect to expeditious actions. However, the response is brief and sufficiently vague so that we cannot fully understand your actions taken in response to G~.L. 88-17. All of your responses to the expeditious actions refer to places in your response to programed enhancements where the similar topic is also covered. Since Comanche Peak is not yet

~

operating, you appear to be doing both responses in parallel. You may wish to consider several of the staff's observations in order to assure yourselves that the actions are adequately addressed. The staff's observations are provided in the enclosure to this letter. There is no need to formally respond to these observations.

As you are aware, the expeditious actions you have briefly described in your response to the generic letter are an interim measure to achieve an immediate i

reduction in risk associated with reduced inventory operation, and these actions will be supplemented by programmed enhancements. We intend to audit both your response to the expeditious actions and your programed enhancement program. The areas where we do not fully understand your responses, as in-dicated in our observations, may be covered in our audit of your expeditious actions.

go7oyfo@

e PDR P

1 0 F4 L l

yi i

l l

1 Mr. W. J. bahill, Jr. -

This closes out the staff review of your responses to the expeditious actions listed in the generic letter, The area of programmed enhancements will be addressed in future correspondence.

Sincerely, b

Christopher I. Grimes, Director Comanche Peak Project Division Office of Nuclear Reactor Regulation

Enclosure:

Observations on G.L. 88-17 Response cc w/ enclosure:

See next page l

June 27, 1989 l

Mr.'W. J. Cahill, Jr. I This closes out the staff review of your responses to the expeditious actions listed in the generic letter. The area of programmed enhancements will be addressed in future correspondence.

1 i

Sincerely, (original signed by)

I Christopher I. Grimes, Director Comanche Peak Project Division I

Office of Nuclear Reactor Regulation

Enclosure:

Observations on G.L. 88-17 Response cc w/ enclosure:

See next page DISTRIBUTION

,r1 61 DOCKET;FUe NRC PDR Local PDR CPPD Reading ADSP Reading DCrutchfield TQuay CGrimes PMcKee JHWilson JLyons RWarnick

.MNalloy MFields-OGC JPartlow gp5f i

EJordan BGrimes Ifg MWHodges I

HBalukjian

ACRS(10)

D:CPPD:NR@

CP R

AD:CPPD:NR AD:CPPD CIGrimes MMalloy MB i Ids JHWils JELyons 4:r ee 06/p /89 0626/89 06/2p/8 06/g"y89

/th/89 6/ln/89 l

t

Mr. W. J. Cahill, Jr. Asst. Director for Inspec. Programs Joseph F. Fulbright Comanche Peak Project Division Fulbright & Jaworski U.S. Nuclear Regulatory Commission 1301 McKinney Street P. O. Box 1029 Houston, Texas 77010 Granbury, Texas 76048 Roger D. Walker Regional Administrator, Region IV Manager, Nuclear Licensing U.S. Nuclear Regulatory Commission Texas Utilities Electric Company 611 Ryan Plaza Drive, Suite 1000 Skyway Tower Arlington, Texas 76011 400 North Olive Street, L.B. 81 Dallas, Texas 75201 Lanny A. Sinkin Christic Institute Texas Utilities Electric Company 1324 North Capitol Street c/o Bethesda Licensing Washington, D.C.

20002 3 Metro Center, Suite 610 Bethesda, Maryland 20814 Ms. Billie Pirner Garde, Esq.

Garde Law Office William A. Burchette, Esq.

104 East Wisconsin Avenue Counsel for Tex-La Electric Cooperative Appleton, Wisconsin 54911 of Texas Heron, Burchette, Ruckert & Rothwell Susan M. Theisen 1025 Thomas Jefferson Street, NW Assistant Attorney General Washington, D.C.

20007 Environmental Protection' Division P. O. Box 12548 Capitol Station GDS ASSOCIATES, INC.

Austin, Texas 78711-1548 Suite 720 l

1850 Parkway Place Mrs. Juanita Ellis, President Marietta, Georgia 30067-8237 Citizens Association for Sound Energy 1426 South Polk Jack R. Newman Dallas, Texas 75224 Newman & Holt:inger 1615 L Street, NW E. F. Ottney Suite 1000

~

P. O. Box 1777 Washington, DC 20036 Glen Rose, Texas 76043 George A. Parker, Chairman Public Utility Committee Senior Citizens Alliance of Tarrant County, Inc.

6048 Wonder Drive Fort Worth, Texas 76133 fir. W. J. Cahill, Jr.

Executive Vice President, Nuclear Texas Utilities Electric Company 400 No. Olive Street, L.B. 81 Dallas, Texas 75201

4 ENCLOSURE OBSERVATIONS ON TV ELECTRIC'S RESPONSE ON EXPEDITIOUS ACTIONS FOR LOSS OF DECAY HEAT REMOVAL (GENERIC LETTER 88-17)

The NRC staff reviewed TU Electric's response to Generic Letter 88-17 on expeditious actions in letters dated February 1 and June 1,1989. The staff has seven observations on the response as follows:

1.

Regarding the discussion of the Diablo Canyon event, related events, lessons learned and training, you refer to Section 2(a) in your response to Programmed Enhancement. This section is concerned with operating procedures that are being prepared. You state that these will address

" refresher training and briefings for maintenance, planning, work control and test personnel (including training incorporating lessons learned from the Diablo Canyon event and other related events and special cautions and controls applicable to reduced inventory operations) rrior to entry into reduced inventory." Although training is mentioned in this general description, you have not provided an outline of the specific subjects to be covered.

2.

Regarding containment closure you state that "during reduced inventory conditions the containment is maintained closed or capable of being closed within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />." As noted in Enclosure 2 to G.L. 88-17, Section 2.2.2, containment ~ closure say be required within 30 minutes for nuclear steam supply systems supplied by Westinghouse if openings totaling greater than I square inch exist in the cold legs, reactor coolant pumps (connecting into the cold le reactor coolant system (RCS)g water space) and crossover pipes of the This 30-minute time requirement may be increased to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> if a vent path from the upper reactor vessel is provided which is sufficiently large (with a suitable safety factor) that core uncovery cannot occur due to pressurization resulting from boiling in the core. You have stated that a large hot leg vent is to be provided prior to installing steam generator nozzle dams. This will require calculations to verify the effectiveness of the opening (see item 7 below).

~

3.

In some plants the quick closure of the equipment hatch is achieved by the installation of a reduced number of bolts.

If you plan to use less than the full complement of bolts for sealing the equipment hatch, you should first verify that you can make a proper seal of the periphery mating surfaces to meet the closure criteria.

4.

Your letter of June 1,1989 provided the results of your study for selecting the RCS level indication system.

You state that the selected level indication system consists of two independent differential pressure transmitters; one narrow range (30-inch span) and one wide range (150-inchspan). The 30-inch span of the narrow range indicator envelops the 29-Inch inside diameter of the RCS hot legs and yields higher accuracy and readability due to its smaller span. The 150-inch span of the wide range indicator extends from below the bottom of the RCS hot legs to above the reactor vessel flange. This permits tracking of RCS level from the reactor vessel flange elevation through reduced inventory operation (three feet below the reactor vessel flange) into mid-loop operation, where the narrow range indicator will be on scale.

3 Your response _ indicates that the high pressure sensing line for each differential pressure transmitter is tied into a separate flux thimble guide tube with a tee conne: tion. A standpipe is installed in each sensing line, with a minimum height well above the maximum transmitter The water level in the standpipes provides the high pressure range.

input to each transmitter. Both che high pressure standpipes and-the low This pressure sides are vented to containment atmosphere as is the RCS.

configuration provides physical independence between the two indicators.

Each level transmitter provides level indication on the residual heat removal (RHR) portion of the control board. Low level alarms are provided in the control room to alert the operator of the potential for excessive You have not indicated the accuracy of the RHR pump air entrainment, readings. When two or more level instruments are in place, care should be taken to resolve any discrepancy between the measurement systems.

5.

For the expeditious action regarding provision of at least two available or operable means of adding inventory to the RCS that are in addition to pumps that are a part of the normal decay heat removal (DHR) systems you have stated that you will maintain sufficient existing equipment in the operable or available status so as to mitigate loss of DHR or loss of in-ventory should they occur. You have stated that at least'one pump will be a high pressure injection pump and that the second means will be one of the other available pumps. You have not described the infection paths. As' alluded to in Enclosure 2 to G.L. 88-17, Section 2.2.2, if openings totaling greater than 1 square inch exist in the cold legs, reactor coolant pumps and crossover piping of the RCS, the core can uncover quickly when pressurized under loss of RHR conditions.

If.this situation should arise, it is generally more effective to inject makeup water into the hot leg rather than the cold leg.

6.

Regarding the appropriate use of nozzle dams, you have stated that hot leg vents will be required prior to installing steam generator nozzle dams.

As noted in item 7 below, calculations are needed to assure that the vents are the proper size. Also, as noted in Enclosure 2 to G.L. 88-17

-i Section 2.7, hot leg nozzle dams should be removed before removing cold leg nozzle dams or hot leg nozzle dams should be removed before, or as quickly as is practical, following closure of the open vent path from the upper reactor vessel.

7.

You have stated the use of vent openings on the hot side of the RCS to relieve RCS pressurization. Calculations need to be performed to verify the effectiveness of RCS openings, however, because even for relatively large hot side openings in the RCS, pressurization to several psi can still result.

For example, with removal of a pressurizer manway, large steam flows in combination with flow restrictions in the surge line and lower pressurizer hardware may still lead to pressurization.

3 l

3-There is no need for TU Electric to formally respond to these observations.

However, the areas where the staff does not fully understand TU Electric's responses, as indicated above, may be audited by the staff.