Proposed Tech Specs Re Conformance W/Diesel Generator Test Schedule Recommendations of Generic Ltr 84-15
ML20245L058
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/23/1989
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20245L044 List:
References
GL-84-15, NUDOCS 8907050357
Download: ML20245L058 (20)


Text

'

c 4 *

. Re.pLAC E VJ tTfl

. 3/4.8' ELECTRICAL POWER SYSTEMS MM grAGE.

3/4.8.1 A.C. SOURCES A.C. SOURCES - OPERATING LIMITING CONDITION FOR OPERATION

/

3.8.1.1 As a minimum, the following A.C. electrical power source shall be OPERABLE:

a. Two physically independent circuits between the offs te transmission network and the onsite Class 1E distribution syste , and
b. Separate and independent diesel generators
  • 0, , 2A and IB with:

l

1. For diesel generator 0, 1A and 2A:

a) A separate day fuel tank containi g a minimum of 250 gallons of fuel.

b) A separate fuel storage syst containing a minimum of 31,000 gallons of fuel.

2. For diesel generator 18, a s arate fuel storage tank / day tank containing a minimum of 29, 0 gallons of fuel.
3. A separate fuel transfer ump. ,

APPLICABILITY: OPERATIONAL CONDITIO 1, 2, and 3.

ACTION:

a. With either one off te circuit or' diesel generator 0 or 1A of the above required A.C electrical power sources inoperable, demonstrate the OPERABILITY the remaining A.C. sources by performing Surveil-lance Requirem ts 4.8.1.1.la within 1~ hour, and 4.8.1.1J2a.4, for one diese generator at a time, within eight hours, and at least once per 8 urs thereafter; restore at least two offsite circuits and diesel enerators 0 and 1A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at east HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOW within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
b. With ne offsite circuit and diesel generator 0 or 1A of the above j req red A.C. electrical power sources inoperable, demonstrate the  !

OP ABILITY of the remaining A.C. sources by performing Surveillance J quirements 4.8.1.1.la within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 4.8.1.1.2a.4, for one iesel generator at' a time, within six hours, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable A.C. j sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore at least two offsite circuits and diesel generators 0 and 1A to OPERABLE. status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT SHUTDOWN within the I next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.  !

8907050357 890623 3 ADDCK 0500

  • See page 3/4 8-1(a) %DR i LASALLE-UNIT 1 3/4 8-1 Amendment No. 49

-_ -_- _ ___-_ - O

o -

1 F ELECTRICAL POWER SYSTEMS I

l LIMITING CONDITION FOR OPERATION (Continued)

. i l

l l

  • For the purpose of completing technical specification surveillance requirements 4.8.1.1.2d.1 and 4.8.1.1.2f.1, as part of a pre planned preventive maintenance program, on the O diesel generator the requirements of action statement.g are modified to:

b

1. Eliminate the requirement for performing _te_chnical are fication surveillance requirements 4.8.1.1.la(1Fnc 4.8.1.1.2a.( on each

. operable AC source, immediately and o'nce per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, when the 0 diesel generator is declared inoperable.

2. Allow an additional 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in excess of the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed in action statement # for the O diesel generator to be inoperable.

b Provided that the following conditions are met:

A. Unit 2 is in operational condition 4 or 5 or defueled prior to taking the 0 diesel generator out of service:

4 @ 4.S.I. I .'ZA . 5 B. Surveillance requirements 4.8.1.1.la n 4 successfully completed, for the offsi e pow.8.1.1.2a.4Aare er sources and the 1A and 2A diesel generators, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to removal of the 0 diesel generator from service.

C. No maintenance is performed on the offsite circuits or the 1A or 2A diesel generators, while the O diesel generator is inoperable.

D. Technical specification requirement 4.8.1.1.la is performed daily, while the 0 diesel generator is inoperable.

E. The control circuit for the unit cross-tie circuit breakers between buses 142Y and 242Y are temporarily modified to allow the breakers to be closed with a diesel generator feeding the bus, while the O diesel generator is inoperable.

The provisions of technical specification 3.0.4 are not applicable. f LASALLE-UNIT 1 3/4 8-la Amendment No. 63 I

i

)

m. .

T., '

h ACfE WLTH

.' ELECTRICAL POWER-SYSTEMS u .

LIMITING CONDITION FOR OPERATION (Continued) , ,

j q ACTION'(Continued) c.' With both of the above required.offsite' circuits inoperabl , demon-strate the OPERABILITY of the remaining A.C. sources by 1 rforming +

-Surveillance Requirement'4.8.1.1.2a.'4, for one diesel- 1erator at a time, within eight hours, and at least once per 8 h rs-thereafter,-

unless the diesel generators'are already. operating; store at least one.of the inoperable offsite circuits to OPERABL status within 24: hours or be in at 1 east HOT SHUTDOWN within't next.12' hours."

With only one offsite circuit restored to OPER LE status,. restore j

at.least two offsite circuits.to OPERABLE sta s within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s-H 'from time of initial loss.or be in at least- T SHUTDOWN within the nextJ12 hours and in COLD-SHUTDOWN within- e following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d. Withl diesel generators 0 and 1A of the ove required A;C. electrical power sources l inoperable, demonstrate e OPERABILITY of the. remain-

'ing A.C. sources-by performing.Surve lance Requirements 4.8.1.1.la within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 4.8.1.1.2a.4, for one diesel generator at a t'me, within four. hours and attle t once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter;.

restore at least one of the ino rable diesel. generators 0'and 1A to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at.least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COL SHUTDOWN.within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />..

Restore both diesel generat rs 0 and 1A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of ini ial lo'ss or be in'at least HOT SHUTDOWN within the next-12 hour and in COLD. SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

e. With diesel generat r 1R of the above required A.C.. electrical power sources inoperabl , demonstrate the OPERABILITY of the remaining A.C. sources by erforming Surveillance Requirements 4.8.1.1.la l within I hour, nd 4.8.1.1.2a.4, for one diesel generator at a time, within x hours, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore the noperable diesel. generator 1B to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> o declare the HPCS system inoperable and take the ACTION required Specification 3.5.1.
f. With d sel generator 2A of the above required A.C. electrical power sour s inoperable, demonstrate the OPERABILITY of the remaining A. sources by performing Surveillance Requirements 4.8.1.1.la and 8.1.1.2.a4, for diesel generator 1A, within one hour, and at east once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore the inoperable diesel generator 2A to OPERABLE. status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare standby gas treatment system subsystem 8, Unit 2 drywell and suppression chamber hydrogen recombiner system, and control room and auxiliary electric equipment room emergency filtration system train B inoperable and take the ACTION required by Specifications 3.6.5.3, 3.6.6.1.,

and 3.7.2; continued performance of Surveillance Requirements 4.8.1.1.la. and 4.8.1.1.2a.4 for diesel generator 1A is not required provided the above systems are delcared inoperable and the ACTION of their respective specifications is taken.

LA SALLE - UNIT 1 3/4 8-2 Amendment No. 18 i

NEW PAGE INFORMATION ONLY 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A. C. SOURCES A. C. SOURCES - OPERATING LIMITING CONDITIONS FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and
b. Separate and independent diesel generators
  • 0, 1A, 2A and 1B with:
1. For diesel generator 0, 1A and 2A:

a) A separate day fuel tank containing a minimum of 250 l gallons of fuel, b) A separate fuel storage system containing a minimum of 31,000 gallons of fuel.

2. For diesel generator 1B, a separate fuel storage tank and a day tank containing a combined minimum of 29,750 gallons of fuel.
3. A separate fuel transfer pump.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a. With one offsite circuit of the above required AC electrical power sources inoperable, demonstrate the OPERABILITY of the rernaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If any of the remaining diesel generators have not been successfully tested within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate their OPERABILITY by performing Surveillance Requirement s 4. 8.1.1. 2. a. 4 and 4. 8.1.1. 2. a. 5 l for each such diesel generator, separately, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

f Restore-the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be

! in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. With either the 0 or 1A diesel generator inoperable, demonstrate the OPERABILITY of the above required AC offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ard at least once

(,

  • See page 3/4 8-ia. -

LASALLE-UNIT 1 3/4 8-1 PROPOSED AMENDMENT l l

l

e '

0hh' .

b '

!NFORMATION ONLY 1

, i h,N, .

ELECTRICAL POWER SYSTEMS .i LIMITING CONDITIONS FOR OPERATION (Continued)

L ACTION (Continued) per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the diesel generator became inoperable due to any cause. other than preplanned ~ preventive maintenance or i testing, demonstrate the OPERABILITY of the remaining OPERABLE ,

diesel generators, separately, by performing Surveillance I Requirements 4.8.1.1.2.a.L and 4.8.1.1.2.a.5 within. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *.

Restore the diesel generator to OPERABLE. status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and :in COLD L SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

L

c. With one offsite circuit of the above-required AC sources and diesel generator 0 or 1A of the above required A.C. electrical power sources inocerable,. demonstrate the OPERABILITY of the remaining A. C. sources by ~ performing Surveillance Requirement 4.8.1.1.1.a

!. within i hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. . If the diesel generator became inoperable due to any cause other than preplanned preventive maintenance .or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirements 4.8.1.1.2.a.4 and i'" 4.8.1.1.2.a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *. Restore at least one of. the inoperable A.C. sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore at least two offsite circuits and diesel generators 0 and 1A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

d. With diesel generator 1B of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the offsite A. C sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If . the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2,a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *. . Restore diesel generator 1B to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare the HPCS system inoperable and take the ACTION required by specification 3.5.1.
  • This test is required to be completed regardless of when the inoperable

.,. diesel g6nerator is restored to OPERABILITY, The provisions of 4

( Specification 3.0.2 are not applicable.

LASALLE-UNIT 1 3/4 8-2 PROPOSED AMENDMENT ,

i

N h

-INFORMATION ONLY i

ELECTRICAL POWER SYSTEMS LIMITING CONDITIONS FOR OPERATION (Continued)

ACTION (Continued)

e. With both of the above required offsite circuits inoperable, demonstrate the OPERABILITY of the remaining AC sources, separately, by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> unless the diesel generators are already operating. Restore at least one offsite circuit to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. With only one offsite circuit restored to OPERABLE status, restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. A successful test (s) of. diesel generator OPERABILITY per Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5, performed under this ACTION statement for the OPERABLE diesel generators, satisfies the diesel generator test requirements of ACTION statement a.
f. With diesel generators 0 and 2A of the above required AC electrical <

, power sources inoperable, demonstrate the OPERABILITY of the C y remaining A. C. sources b'y performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 for the 1B and 2A diesel generators, separately, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *.

Restore at least one of the inoperable diesel generators 0 or 2A to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore both diesel generators 0 and 1A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, from the time of initial loss, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

g. With diesel generator 1A of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the 1A diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the 2A diesel generator by performing Surveillance Requirements j 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *, Restore the j l

i I

  • This test i.s required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY. The provisions of

(.,. . - Specification 3.0.2 are not applicable. j LASALLE-UNIT 2 3/4 8-2a PROPOSED AMENDMENT I

NE W  ?^

INFORMATION ONLY .

ELECTRICAL p0WER SYSTEMS LIMITING CONDITIONS FOR OPERATION (Continued)

ACTION (Continued)

I inoperable diesel generator 1A to OPERABLE status within~72 hours or declare standby gas treatment system subsystem A, Unit 1 drywell and suppression chamber hydrogen recombiner system, and control room and auxiliary electric equipment room emergency filtration system train A inoperable, and take the ACTION req'uired by specifications 3.6.5.3, 3.6.6.1, and 3.7.2. Continued performance of Surveillance Requirement 4.8.1.1.1.a is not required provided the above systems are declared inoperable and the action of their respective specifications is taken.

i. With one offsite circuit of the above required A.C. electrical power sources and diesel generator 2B inoperable, apply the requirements of ACTION a and d specified above.

J. With either diesel generators 0 or 2A inoperable and diesel j generator 2B inoperable, apply the requirements of ACTION b and d specified above.

k. - With one offsite circuit of the above required A.C. electrical power sources and diesel generator 1A inoperable, apply the requirements of ACTION a and g specified above.

l l

LASALLE-UNIT 2 3/4 8- 2b pR0p0 SED AMENDMENT

SEdacE. W ITH pAGE

. NE.MJ 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES l

A.C. SOURCES - OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sou es shall be OPERA 8LE:

a. Two physically independent circuits between the o site transmission network and the onsite Class IE distribution sys es,'and

. b. Separate and independent diesel generators

  • 0, , 2A and 28 with: l  ;
1. . For diesel generator 0, 1A and 2A: i a) A separate day. fuel tank contai ng a minimum of 250 gallons of fuel.

b) A separate fuel storage sys containing a minimum of 31,000 gallons of fuel.

2. For diesel generator 28, a se rate fuel storage tank / day tank containing a minimum of 29,7 0 gallons of fuel.
3. A separate. fuel transfer .

APPLICABILITY: OPERATIONAL CONDITION 1, 2, and 3.

ACTION:

a. With either one offsi circuit or diesel. generator 0 or 2A of the above required A.C. ectrical power sources inoperable, demonstrate the OPERABILITY of a remaining A.C. sources by performing Surveil-lance Requirement 4.8.1.1.la. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 4.8.1.1.2a.4.,

for one diesel nerator at a time, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and at least once per 8 hou thereafter; restore at least two offsite circuits J and diesel 'ge trators 0' and 2A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at le t HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN w thin the following 24 heurs,

b. With o offsite circuit and diesel generator 0 or 2A of the above requi d A.C.-electrical power sources inoperable, demonstrate the OPE ILITY of the remaining A.C. sources by performing Surveillance Re frements 4.8.1.1.la..within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 4.8.1.1.2a.4., for one d esel generator at a time, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and at least' once per hours thereafter; restore at least one of the inoperable A.C.

sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore at least two offsite circuits and  !

diesel generators 0 and 2A to OPERA 8LE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

"See page 3/4 8-1(a).

LASALLE - UNIT 2 3/4 8-1 Amendment No.16 l i

'fLELTRICALPOWERSYSTEMS LIMITING CONDITION FOR OPERATION (Continued)-

k 1

  • For the purposes of completing technical specification surveillance L requirements 4.8.1.1.2d.1 and 4.8.1.1.2f.1, as part of a pre planned preventative maintenance program, on the 0 diesel generator the requirements of action statements gr are modified to:

b

1. Eliminatetherequirementforperforminatechnicalsou% tfication surveillance requirements 4.8.1.1.la(and 4.8.1.1.2a.42 on each operable AC source, immediately and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter,

~

when the O diesel generator is declared inoperable.

2. Allow an additional 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in excess of the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed in action statement,sifor the 0 diesel generator to be inoperable.

6 Provided that the following conditions are met:

A. Unit 1 is in operational condition 4 or 5 or defueled prior to taking the O diesel generator out of service.

ane4.B.I.LZA.5.

4.8.1.1.2a.4 ,are B. Surveillance requirements 4.8.1.1.la, successfully completed, for the offsite power sources and the 1A or l 2A diesel generators, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to removal of the 0 1 diesel generator from service. J C. No maintenance is performed on the offsite circuits or the 1A or 2A

)

diesel generators, while the O diesel generator is inoperable.  ;

1 D. Technical specification requirements 4.8.1.1.la is performed daily, while the O diesel generator is inoperable.

E. The control circuit for the unit cross-tie circuit breakers between buses 142Y and 242Y are temporarily modified to allow the breakers to be closed with a diesel generator feeding the bus, while the O diesel generator is inoperable.

The provisions of technical specification 3.0.4 are not applicable.

I LASALLE - UNIT 2 3/4 8-la Amendment No. 44 i

l Relus i

ELECTRICAL POWER SYSTEMS U$H NEd 1 pA GE LIMITING CONDITION FOR OPERATION (Continued)

I ACTION: (Continued) I

c. With both of the above required offsite circuits in erable, demonstrate the OPERABILITY of the remaining A.C. ources by per-forming Surveillance Requirement 4.8.1.1.2a.4., f r one diesel generator at a time, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and at lea once per 8 hourr l thereafter, unless the diesel generators are ready operating; restore at least one of the inoperable offsi circuits to OPERABLE 4 status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least H0 SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. With only one offsite cir it restored to OPERABLE status, restore at least two offsite cir its to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial lo s or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and n COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

l

d. With diesel generators 0 and 2A o the above required A.C. electrical l power sources inoperable, demons rate the OPERABILITY of the remain-ing A.C. sources by performing surveillance Requirements 4.8.1.1.la.

within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 4.8.1.1.2a. , for one diesel generator at a time, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and at least nce per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperabl diesel generators 0 and 2A to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHU OWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore both diesel generators and 2A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial Joss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and i / COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

e. With diesel gener or 2B of the above required A.C. electrical power sources inoperab e, demonstrate the OPERABILITY of the remaining A.C. sources b performing Surveillance Requirements 4.8.1.1.la.'

within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 4.8.1.1.2a.4., for one diesel generator at a time, withi 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore th inoperable diesel generator 2B to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> r declare the HPCS system inoperable and take the ACTION require by Specification 3.5.1.

f. With fesel generator 1A of the above required A.C. electrical power sou es inoperable, demonstrate the OPERABILITY of the remaining A. . sources by performing Surveillance Requirements 4.8.1.1.la.

thin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 4.8.1.1.2a.4. for diesel generator 2A, within

, hours, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore the in-operable diesel generator 1A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare standby gas treatment system subsystem A, Unit 1 drywell and suppression chamber hydrogen recombiner system, and control room and i auxiliary electric equipment room emergency filtration system train A inoperable and take the ACTION required by Specifications 3.6.5.3, l

3.6.6.1, and 3.7.2; continued performance of Surveillance Requirements 4.8.1.1.la. and 4.8.1.1.2a.4. for diesel generator 2A is not required provided the above systems are declared inoperable and the ACTION of their respective specifications is taken.

LA SALLE - UNIT 2 3/4 8-2

/

iq E w

[. . .

P AG E INFORMATION ONLY 3/4.8 ELECTRICAL POWER SYSTEMS l 9.1;

~'

y 3/4.8.1 A.C. SOURCES A. C. SOURCES - OPERATING l LIMITING CONDITIONS FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and 1
b. Separate and independent diesel generators
  • 0, 1 A, 2A and 2B with:
1. For diesel generator 0, 1A and 2A:

a) A separate day fuel tank containing a minimum of 250 gallons of fuel.

b) A separate fuel storage system containing a minimum of 31,000 gallons of fuel.

2. For diesel generator EB, a separate fuel storage tank and a day tank containing a combined minimum of 29,750 gallons of fuel.
3. A separate fuel transfer pump.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

ACTION:

a. With one offsite circuit of the above required AC electrical power sources inoperable, demonstette the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If any of the remaining diesel generators have not been successfully t est ed within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate their OPERABILITY by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 for each such diesel generator, separately, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. With either the 0 or 2A diesel generator inoperable, demonstrate the OPERABILITY of the above required AC offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once j
  • See page 3/4 8-la.

LASALLE-UNIT 2 3/4 8-1 pR0p0 SED AMENDMENT l

is

', , NEW PAGE INFORMAT20N ONLY

.i ELECTRICAL POWER SYSTEMS

,m LIMITING CONDITIONS FOR OPERATION (Continued) l ACTION (Continued) per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing. Surveillance l Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *.

Restore the diesel generator to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD l

SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c.- With one offsite circuit of the ebove-required AC sources and diesel generator 0 or 2A of the above required A.C. electrical power sources inoperable, demonstrate the. OPERABILITY of the remaining l

A. C. ' sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonst rat e the

.0PERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirement E 4. 8.1.1. 2. a. 4 and 4.8.1.1.2.a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *. Restore at least 'one of the inoperable A.C. sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in

, at least HDT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore at least two offsite circuits and diesel generators 0'and 2A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.from the time of initial loss or be in at least HDT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

d. With diesel generator 2B of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the offsite A. C sources by performing Surveillance Requirement 4.8.1.1.1.a within i hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirement s 4. 8.1.1. 2. a. 4 and 4. 8.1.1. 2. a. 5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *. Restore diesel generator 2B to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare the HPCS system inoperable and take the ACTION required by specification 3.5.1.
  • This test is required to be completed regardless of when the inoperable diesel generator 'is restored to OPERABILITY. The provisions of ,

~..

Specification 3.0.2 are not applicable. I LASALLE-UNIT 2 3/4 8-2 PROPOSED' AMENDMENT

NEW pAGE 2NFORMATION ONLY -

9

[k ELECTRICAL POWER SYSTEMS LIMITING CONDITIONS FOR OPERATION (Continued)

ACTICN (Continued)

e. With both -of the above. required offsite circuits. inoperable, demonstreta the OPERABILITY of the remaining AC sources, separately, by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> unless the diesel generators are:

already operating. Restore at.least one offsite circuit to OPERABLE-status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. With only one'offsite circuit restored to OPERABLE status, restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.from the time of initial loss or be in at least HOT SHUTDOWN within the- next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. A successful test (s) of diesel generator OPERABILITY per Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5, performed under this ACTION statement for the OPERABLE diesel generators, satisfies the diesel generator test requirements of ACTION statement a.

f. With diesel generators 0 and 1A of the above required AC electrical power sources inoperable, demonstrate the OPERABILITY. of the

, Q, a ' remaining A. C. sources 'by performing Surveillance Requirement 4.8.1.1.1.a within i hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 for the 1B and 2A diesel generators, separately, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *.

Restore at least one of the inoperable diesel generators 0 or 1A to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />,'or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore both diesel generators 0 and 1A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, from the time of initial loss, or be in at least HDT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

g. With diesel generator 2A of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the 2A diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the 1A diesel generator by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *. Restore the
  • This test is required to te completed regardless of when the inoperable

. diesel generator is restored to OPERABILITY. Th- provisions of I@y . , Specification 3.0.2 are not applicable.

LASALLE-UNIT 1 3/4 8-2a PROPOSED AMENDMENT m___=__ --_ _ _ _ _ _ i

!:{ [.s c - .

INFORMATION ONLV l p7 , ELECTRICAL p0WER SYSTEMS LIMITING CONDITIONS FOR OPERATION (Continued)

ACTION (Continued) i inoperable diesel generator 2A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare standby gas treatment-system subsystem ~B, Unit 2 drywell and suppression chamber hydrogen recombiner: system, and control: room and auxiliary electrie equipment room emergency filtration system train B. inoperable, 'and take the ACTION required by specifications.

p 3.6.5.3, 3.6.6.1, and 3.7.2. Continued performance of. Surveillance Requirement 4.8.1.1.1.a is not required provided the 'above- systems are- declared ' inoperable and the action of their respective-specifications is taken.

i. With.one offsite circuit of the above required A.C. electrical power sources and diesel generator-1B inoperable, apply the requirements of ACTION a and d specified above.

j.. With either diesel generators 0 or 1A inoperable, and diesel generator 1B inoperable, apply the requirements of ACTION b and d specified above. -

K' k. . With one offsite circuit of the above required A.C. electrical power .

" sources and diesel generator 2A inoperable, apply the- requirements of ACTION a and g specified above.

1

. C., I W 1 3/4 8-2b pR0p0 SED AMENDMENT LASALLE-UNIT 1 l

-- _ - _ _ _ _ _ - . _____-___-___ _ -_ - _ ___ _ _ __ _ ____ _ Q

1 4 -

ATIACIM32tI_C 4

SIGHIflCRil llAZARDS_C0tiSIDEEAT10li Commonwealth Edison has evaluated the proposed Technical Specification Amendment and determined that it does not represent a significant hazards consideration. Based on:the criteria for defining a significant hazards.

consideration est&D11shed in 10 CFR 50.92, operation of LaSalle County Station

- Units 1 and 2 in accordance with the proposed amendment will_nnt:

- 1) Involve a significant increase in the probability or consequences of an

' accident previously evaluated because:

The proposed snendments contained.In this submittal will help to enhance diesel generator reliability by minimizing the degradation of the diesel generators caused by excessive testing. Since the' reliability of the diesel generators is not degraded and may actually be improved by the proposed change, the probability or consequences of an accident previously evaluated will not be increased.

2)- Create the possibility of a new or different kind of accident from any accident previously evaluated because:

Limiting the number of diesel generator starts required by the Technical Specifications does not degrade the reliability of the diesel generators,

- therefore,'the possibility of a new or different kind of accident is not created.

3) Involve a significant reduction in the margin of safety because:

The proposed unendments do not degrade the reliability of the diesel generators, therefore, this proposal does not involve a significant reduction in the margin of safety. Since the proposed snendment will reduce the degradation of the diesel _ generators caused by excessive testing, the margin of safety may actually be improved.

I Guidance has been provided in the " Final Procedures and Standards on No Significant Hazards Consideration", Final Rule, 51 FR 7744, for the application of standards to license change requests for determination of the existence of significant hazards considerations. This document provides-examples of amendments which are and are not cons 3dered likely to involve significant hazards considerations. This proposal is considered to be an administrative change and as'such, does not involve a significant relaxation l of the criteria used to establish safety limits, a significant relaxation of

~

the bases for the limiting safety limits, a significant relaxation of the bases for the limiting conditions for operations. Therefore, based on the guidance provided in the Federal Register and the criteria established in 10 CFR 50.92(e), the proposed changes does not constitute a significant hazards consideration.

0183T l

2

I V '

l i .-

ATIACIMMT_D CLINTON NUCLEAR POWER STATION UNIT 1 TECIMICAL SPECIFICATIONS i

0183T

4

-v o .. .

3/4.8 ELECTRICAL POWER SYSTEMS C 3/4.8.1' AC SOURCES _

AC SOURCES - OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following AC electrical power sources shall be

~

OPERABLE:

a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and
b. Three separate and independent diesel generators, each with:
1. A separate day fuel tank containing a minimum of'385 gallons of fuel for diesel generators 1A and 18 and 240 gallons of fuel for diesel generator IC.
2. A separate fuel storage system containing a minimum of 48,000 gal-lons of fuel for diesel generator 1A and 41,500 gallons for diesel generator 18 and 29,500 gallons of fuel for diesel generator 10.
3. A separate fuel transfer pump.

' 4

- APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.

~' -

ACTION:

a. With one offsite circuit of the above required AC electrical power sources inoperable, demonstrate the OPERABILITY of the remaining AC sources by performing Surveillance Requirement 4.8.1.1.1.a within one j hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If either diesel generator 1A or 1B has not been successfully tested within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demon-strate its OPERABILITY by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 for each such diesel generator, separately, within 1

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. With either diesel generator 1A or 1B inoperable, demonstrate the OPERABIL-ITY of the above required AC offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the diesel generator became inoperable due to any cause other than preplanned prev,entive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *. Restore the inoperable diesel generator to OPERABLE J e
  • *This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABLE status. The provisions of Specification 3.0.2 i are not applicable. ]

L-CLINTON - UNIT 1 3/4 8-1

v

.r ELECTRICAL POWER SYSTEMS -

[ AC SOURCES - OPERATING LIMITING CONDITION FOR OPERATION (Continued) 3.8.1.l' ACTION (Continued):

U status within.72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

c. With one offsite circuit of the above-required AC sources and diesel generator 1A or 18 of the above required AC electrical power sources -

inoperable, demonstrate the OPERABILITY of the remaining AC sources by-performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If a diesel generator became inoperable from any cause other than preplanned preventive maintenance or testing, demon-strate the OPERA 8ILITY of the remaining OPERABLE diesel generators, separately,.by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *. Restore at least one of the inoperable AC sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN-within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore at least two offsite circuits and diesel generators 1A and 18 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least NOT. SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

d. With diesel generator 1C of the above required AC electrical power sources inoperable, demonstrate the OPERABILITY of the offsite AC sources by per-forming Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the diesel generator became inoperable as i a result of any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel gener-aters, separately, by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *. Restore diesel generator 1C to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare the HPCS system inoperable and take the ACTION required by Specifications 3.5.1 and 3.7.1.1.
e. With diesel generator 1A or 1B of the above required AC electrical power sources inoperable, in addition to taking ACTION b or c, as applicable, verify within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that all required systems, subsystems, trains, components and devices that depend on the remaining OPERABLE diesel generator as a source of emergency power are also OPERABLE; otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
f. With both of the above required offsite circuits inoperable, demonstrate the OPERABILITY of three diesel generators, separately, by performing Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> unless the diesel generators are already operating. Restore at least one "This test is required to be completed regardless of when the inoperable diesel.

generator is restored to OPERABILITY. The provisions of Specification 3.0.2 are not applicable.

CLINTON - UNIT 1 3/4 8-2

i,, .

ELECTRICAL POWER SYSTEMS Q-

. AC SOURCES ~- OPERATING LIMITING CONDITION FOR OPERATION (Continued) _

3.8.1.1 ACTION (Continued):

J

' of the above-required offsite circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> With only one

'or be in et least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

e offsite circuit. restored to OPERABLE status, restore at least'two offsite; circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from. time of initial loss or be in at-least HOT SHUTDOWN A within the next-12 successful test (s) hours and ingenerator of diesel COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

OPERABILITY per Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5, performed under this ACTION statement for the OPgRABLE diesel generators, satisfies the diesel generator test requirements of ACTION statement,a.

g. With diesel generators 1A and 1B of the above-required AC electrical power sources inoperable, demonstrate the OPERABILITY of the remaining AC sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />'thereafter and Surveillance Require-ments 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 for diesel generator 1C within

, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.* Restore at least one of the inoperable diesel generators 1A and

.; . ' 1B to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN-within

" .i .

the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. .

Restore both diesel generators 1A and 18 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

~

%;- from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

h. With one offsite circuit of the above-required AC electrical power sources inoperable and diesel generator 1C inoperable,' apply the requirements of ACTION statements a and d specified above.

i.

With either diesel generator 1A or 1B inoperable and diesel generator 1C inoperable, apply the requirements of ACTION statements b, d and e specified above.

1 I

j *This test is rec,vited to be cenpleted regardless of when the inoperable diesel generator is restored to OPERABILITY. The provisions of Specification 3.0.2 are not applicable.

a CLINTON - UNIT 1 3/4 8-3 I

l-

. -[

s. ..

. ELECTRICAL POWER SYSTEMS

[A AC SOURCES - OPERATING SURVEILLANCE REQUIREMENTS 4.8.1.1.1. Each of the above required independent circuits between the offsite 3

. transmission network and the onsite Class 1E distribution system shall be: q 1

a. Determined OPERABLE at least once per 7 days by verifying correct breaker..

alignments and indicated power availability, and b.- Demonstrated OPERABLE at least once per 18 months during shutdown by.trans-ferring, manually and automatically, unit power supply from the normal.

g circuit-to the alternate circuit.

4.8.1.1.2 Each of the above required diesel generators shall be demonstrated

. OPERABLE:

i

a. In'accordance with the frequency specified in Table 4.8.1.1.2-1 on a STAG- l GERED TEST BASIS by:

i.

. 1. Verifying the fuel. level in the day fuel tank.

2. Verifying the fuel level in the fuel storage tank.

?

.' 3. Verifying the fuel transfer pump starts and transfers fuel from the.

storage. system to the day fuel tank.

4. Verifying the diesel starts from ambient condition and accelerates to'at least 900 t-18 rpm in less than or equal to 12 seconds.* The generator voltage and. frequency shall be 4160
  • 420 volts and 60
  • 1.2 Hz_within 12 seconds
  • after the start signal. The diesel generator.

shall be started for this test by using one of the following signals:

a) Manual, b) Simulated loss of offsite power by itself.

c) Simulated loss of offsite power in conjunction with an ESF actua-tion test signal.

, d) An ECCS actuation test signal by itself. 4

5. . Verifying the diesel generator is synchronized, loaded to greater

+,

than or equal to 3869 kW for diesel generator 1A, 3875 kW for diesel 1 generator 18 and 2200 kW for diesel generator 1C in less than or equal y to 90 seconds, and operates with this load for at least 60 minutes.

1

  • The. diesel generator start (12 seconds) from ambient conditions'shall be per-formed at_least'once per 184 days in these surveillance tests. All other engine starts for the purpose of this surveillance testing may be preceded an )

engine prelube period and/or by warmup procedures and may also include gradual j loading as recommended by the manufacturer so that.the mechanical stress and i wear-on the diesel engine is minimized.

)

CLINTON - UNIT 1 3/4 8-4 j