Forwards Insp Rept 50-302/89-17 on 890619-20 & Notice of Violation.Expresses Concern Re Interface Between Nonnuclear Activities & Plant Operations
ML20245K279
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/11/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20245K282 List:
References
NUDOCS 8908180382
Download: ML20245K279 (2)


See also: IR 05000302/1989017

Text

-_

_ --

..

,

c_-

-

,

1

.

a.

7e

. . . c.

gy

,

>

e

j

. August.11, 1989

" Docket No.~50-302.-

License No. DPR-72:

q

F1orida Power Corporation.

Mr.

W.__S.~ Wilgus

Vice: President, Nuclear. Operations

q

ATTN:. Manager, Nuclear?0perations;

-

. Licensing

',

-P..O. Box 219-NA-21

.

.

'

Crystal River, FL' 32629

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

,(NRC: INSPECTION REPORT NO. 50-302/89-17)-

L

This refers to the Nuclear: Regulatory Commission.(NRC) inspection conducted by

'

C. Casto on June 19-20, 1989.- The inspection included a review of activities

authorized - for : your Crystal _ River facility.

At the conclusion of the

inspection, the findings were discussed with L those members of your. staff

identified in the enclosed. inspection' report.

.

Areas ' examined during the inspection are -identified..in the report.- Within

.these areas, the inspection. consisted of selective examinations .of procedures

I

and representative records, interviews;with personnel, and review of' activities

i

related to the loss of offsite power event of June .16, .1989.

,

'

The inspection findings indicate that certain activities appeared to: violate

' NRC requirements.

The. violation, references to _ pertinent requirements, 'and

' elements.to be included in your response are described in the enclosed

Notice of Violation.

We are particularly concerned about the . interface : between. the non-nuclear

j

activities and Crystal River' Unit '3: operations.

Aggressive management

.!

-

attention: is needed to prevent unintentional de-energization of the. Unit.3

-

Startup transformer.

The' responses directed by this: letter and its. enclosures are not subject to the

~ learance_ procedures of the Office of Management and Budget as required.by the.

c

-Paperwork Reduction Act of 1980, Pub..L. No.96-511.

~

!

l

!

,

89081803S2 890s11

i

PDR

ADOCK 05000302

ll 0

0

PDC

5

,

JEo(-

- _ _ _ - _ _ _ _ - - - . _ - _

. . '

'

-

<

,

.

,g.

.

Florida Power Corporation

2

August 11, ' 1989.~

.

.,

'Should you have any questions concerning this letter,' please contact us.

.

Sincerely,

(ORIGINAL SIGNED BY C. A. ' JULIAN)-

Caudle A..Julian,. Chief ^

Engineering Branch

' Division'of. Reactor' Safety'

Enclosures:

1.

Notice of Violation .

.i

!

2.

NRC Inspection Report-

cc w/encis:

P. F. McKee, Director,-

.

.

Nuclear Plant Operations

{

R. C. Widell', Director, Nuclear'

"

Operations Site Support

State of Florida

bec w/encls:

!

NRC Resident. Inspector,

DocumentiControl1 Desk 1;

)

_

,

!

!

_!

.,

!

.'

l

RII DRS

RII:

RIIpD

RII:DRS.

CCasto

TConlo

RCr"enjak.

CAJulian.

l

I/89

g89

Of/y89

Og/ /89

- - - - _ - - -

_--