Forwards Enforcement Conference Rept 50-295/89-19 on 890531 & Notice of Violation
ML20245F023
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/19/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20245F026 List:
References
EA-89-109, NUDOCS 8906280021
Download: ML20245F023 (2)


See also: IR 05000295/1989019

Text

--

(.

.

l

-

bs

-

.:

.

N6

l

.-

J1JN 191989

EA 89-109

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767'

Chicago, IL 60690

Gentlemen:

This: refers to an Enforcement Conference conducted by Mr. C. J. Paperiello

and other members of the NRC staff with Mr. T. J. Maiman and your staff on

May 31, 1989, at the Region III office in Glen Ellyn, Illinois, to discuss

the licensee's failure to declare one train of the Containment Spray System

(CS) inoperable as identified in NRC Inspection Report No. 295/89017(DRP).

We have concluded that operation with an inoperable train of CS resulted in a

Severity Level IV violation of Technical Specifications (TS 3.6.1.C).

We are

concerned with your operating staff's failure to make an appropriate LC0 dieter-

mination and with the lack of involvement of the station technical staff in

this determination. This also appears to have contributed to a condition.

where inoperable redundant trains went unrecognized. We also note that in

your short term corrective action, you did not specify how long the

administrative LC0 would remain in effect. Therefore, we will consider

this LCO to expire on October 1, 1989, when you committed to complete your

evaluation of TS. We have made an Open Item (295/89019-01(DRP)) of this TS

issue and request that you espond in writing with your resolution of this

open item by October 1, 1989. A written response to this violation is also

required.

In your response, please include your actions to improve your

operating staff's LC0 determination capabilities and the overview role of the

' technical staff.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

i

this letter, the enclosures, and your response to this letter will be placed

j

in the NRC Public Document Room.

]

i

The responses directed by this letter and the accompanying Notice are not

I

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

1

f.h

f

L.

O

i

__

- _ -

.4..

- -

,

,

,

9

Commonwealth Edison-Company

2 JllN 191989

We'will(jladlydiscussanyquestionsyouhaveconcerningthisEnforcement

Conference.

Sincerely,~

moriginal signed b W.D..shasara

Edward G. Greenman, Director.-

Division.of Reactor Projects

Enclosures:

1.

Notice of; Violation

2.

Inspection Report

No.50-89019(DRP)

cc w/ enclosures:

T. J. Maiman, Vice' President.

.

PWR Operations

T. Kovach, Nuclear

Licensing. Manager-

T. Joyce, Station Manager

Chandu Patel, Project

Manager, NRR

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard.

J..W. McCaffrey, Chief, Public

utilities . Division

Mayor, City of Zion

bec:

J. Lieoerman, OE

L. Chandler, 0GC

J.. Partlow, NRR

.

&

v'

s

RIII

RIII

I

R

4

RbII

so.

w

1%

Calhoun/jp

Lerch

finds

ha

r

ta leton

Gree nan

($ 06/d/89

  • (#

'

lb %

- _ _ _ _