ML20245C571
| ML20245C571 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/19/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20245C572 | List: |
| References | |
| NUDOCS 8904270241 | |
| Download: ML20245C571 (3) | |
See also: IR 05000498/1989004
Text
,
- _ _ - _ _
k.
'
".
y ,g ,
'
.
In Reply Refer To:
Dockets:- 50-498/89-04
E
50-499/89-04
L
Houston Lighting & Power. Company
ATTN: J.-H.-Goldberg, Group Vice
President, Nuclear
P. O. Box 1700-
'
Houston, Texas 77001-
Gentlemen:
This refers to the inspection conducted by Messrs. J. E. Bess, R. J. Evans,
J. I.. Tapia, D. L. Garrison, and other members of. this office during the period
February -1-28,1989, of activities authorized by NRC Operating License NPF-76
and NPF-78 for the South. Texas Project, Units 1 and 2, and to the discussion of
our findings with Mr. W.-H. Kinsey, and other members of your staff at the
conclusion of the inspection.
Areas examined during the' inspection included plant status, engineered safety
feature system walkdown, monthly maintenance observations, monthly. surveillance
observations, operational safety verification, startup procedure review -
Unit 2, and startup test' witnessing and observation - Unit 2.
Within these
areas, the inspection consisted of selective examination of procedures and
'
representative records, interviews with personnel, and observations by the NRC
inspectors. The inspection findings are documented in the enclosed inspectior
report.
During-this inspection, it was found that certain of your activities were in
- "
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the ~NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on'the specifics contained in the
'
Notice of Violation enclosed with this letter.
We'have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 3 of the enclosed report.
The response requested by this letter is not subject to the clearance
procedures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, PL 96-511.
hb$
'I
RIUSR
RI @ SR
RI
DRP/
//1
E
C:
D:DRP
JEBess/lr RJEvans JITa ia
DLGarrison DMHunnicutt GF
born EHo11er 4.JCallan
y / y/89 4//f/89
.{//y/89
/
89
4 //q/89 q /j44/89 '{//T89
4 / 14 /89
<
7
I
8904270241 090419
[I
ADDCK 05000498
PNV
- I
O
w
.
.
a
.
.
L
Houston Lighting &' Power Company
2
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed BM
O. D. Chemberlein
'
L. J. Callan, Director
Reactor Projects
Enclosure:
-1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-498/89-04
50-499/89-04
cc w/ enclosure:
Houston Lighting & Power Company
ATTN:
M. A. McBurnett, Manager
Operations Support Licensing
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vice President
Nuclear Operations
P.O. Box 1700
Houston, Texas 77001
Houston Lighting & Power Company
ATTN:
J. T. Westermeier, General Manager
South Texas Project
P.O. Box 289
Wadsworth, Texas 77483
Central Power & Light Company
ATTN:
R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Christi, Texas 78403
City of Austin Electric Utility
ATTN:
R. J. Miner, Chief Operating
Officer
721 Barton Springs Road
l
____- __
_
.
__
- _ _
.. -
_-_ -
.
.
i
i
^
b
~
' Houston Lighting & Power Company ~
3-
.
- -
Newman'& Holtzinger, P.C.
ATTN: .J.
R. Newman, Esquire
1615 L Street, N.W.-
Washington, DC 20036
Houston Lighting & Power Company
ATTN:
S. L. Rosen, Vice President
Engineering and Construction
P.O. Box'289
'
Wadsworth, Texas 77483
Houston Lighting &-Power Company
ATTN:
R. W. Chewning, Chairman
Nuclear Safety. Review Board
P.O. Box 289
Wadsworth, Texas 77483
' City Public Service Board,
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 1771
San Antonio, Texas 78296
Licensing Representative
Houston Lighting & Power Company
Suite 610
Three Metro Center
.
Bethesda, Maryland 20814
l
,
t
Texas Radiation Controlz Program Director
bcc distrib. by RIV:
(IE01)
- DRP'
- RRI
-*Section Chief (DRP/D)
- DRS
- MIS System
- RPB-DRSS
Lisa Shea, RM/ALF
- RIV File
R. Bachmann, 0GC
- RSTS Operator
- G. Dick, NRR Project Manager (MS:
13-D-18)
- R. D. Martin
- w/766
i
__ _ _ _ . _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _
._