Forwards Insp Repts 50-321/89-04 & 50-366/89-04 on 890225-0320 & Notice of Violation
ML20245A191
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/12/1989
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20245A193 List:
References
NUDOCS 8904250096
Download: ML20245A191 (2)


See also: IR 05000321/1989004

Text

- _ - _ _

.t .' . '

.

APR 1a 1999

'

)

Docket Nos. 50-321 and 50-366

License Nos. DPR-57 and NPF-5

Georgia Power Company

ATTN: Mr. W. G. Hairston III

Senior Vice President-

Nuclear Operations

P.O. Box 1295

Birmingham, AL 35201

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-321/89-04 AND 50-366/89-04)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Messrs. J. Menning and R. Musser on February 25 - March 20,1989. The

inspection included a review of activities authorized for your Hatch facility.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. Violation 321/89-04-01, references to pertinent require-

ments, and elements to be included in your response are presented in the

enclosed Notice of Violation. Additionally, because all of the criteria for

categorization of licensee-identified violations were met with regard to items

321/89-04-02 and 366/89-04-03, two other violations are not being cited.

Therefore, no response to these two items is required. The details pertaining {

to these licensee-identified violations are described in the enclosed 1

Inspection Report.

'

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

I

8904250096 890412

PDR ADOCK 05000321

Q PDC

i g

I

,

E_--- ZEol

_ _ _ _ - _ _ - _

.

'- *

,, ,

Georgia Power Company 2

APR 1 2 1989

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL 5!GNED BY

ALAN R. HERDT

Alan R. Herdt, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encis:

R. P. Mcdonald, Executive Vice President,

Nuclear Operations

J. T. Beckham, Vice President, Plant Hatch

H. C. Nix, General Manager

0. M. Fraser, Site Quality Assurance

Manager

L. T. Gucwa, Manager, Nuclear Engineering

and Licensing

S. B. Tipps, Manager of Nuclear

Safety and Compliance

State of Georgia

bcc w/encis:

L. P. Crocker, NRR

M. V. Sinkule, RII

NRC Resident Inspector

DRS Technical Assistant

Document Control Desk

i

4

l

l

RII RII j

/T

LTrocine:tj

MYS

MSinkule -

1

04/// /89 04/pg/89  !

, I

4

-