- _ - _ _
. t
.' .
.
'
APR 1a 1999
)
'
Docket Nos. 50-321 and 50-366
Georgia Power Company
ATTN: Mr. W. G. Hairston III
Senior Vice President-
Nuclear Operations
P.O. Box 1295
Birmingham, AL 35201
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-321/89-04 AND 50-366/89-04)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Messrs. J. Menning and R. Musser on February 25 - March 20,1989.
The
inspection included a review of activities authorized for your Hatch facility.
At the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed Inspection Report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
Violation 321/89-04-01, references to pertinent require-
ments, and elements to be included in your response are presented in the
enclosed Notice of Violation.
Additionally, because all of the criteria for
categorization of licensee-identified violations were met with regard to items
321/89-04-02 and 366/89-04-03, two other violations are not being cited.
Therefore, no response to these two items is required. The details pertaining
{
to these licensee-identified violations are described in the enclosed
1
Inspection Report.
'
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No.96-511.
I
8904250096 890412
ADOCK 05000321
Q
i
g
I
,
ZEol
E_---
_ _ _ _ - _ _ - _
.
' *
-
,,
,
Georgia Power Company
2
APR 1 2 1989
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL 5!GNED BY
ALAN R. HERDT
Alan R. Herdt, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
1.
2.
NRC Inspection Report
cc w/encis:
R. P. Mcdonald, Executive Vice President,
Nuclear Operations
J. T. Beckham, Vice President, Plant Hatch
H. C. Nix, General Manager
0. M. Fraser, Site Quality Assurance
Manager
L. T. Gucwa, Manager, Nuclear Engineering
and Licensing
S. B. Tipps, Manager of Nuclear
Safety and Compliance
State of Georgia
bcc w/encis:
L. P. Crocker, NRR
M. V. Sinkule, RII
NRC Resident Inspector
DRS Technical Assistant
Document Control Desk
i
4
l
l
RII
RII
j
/T
MYS
1
LTrocine:tj
MSinkule
-
!
04/// /89
04/pg/89
,
I
-
4