ML20244D167
| ML20244D167 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 04/14/1989 |
| From: | Cooper R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20244D169 | List: |
| References | |
| NUDOCS 8904210188 | |
| Download: ML20244D167 (2) | |
See also: IR 05000461/1989012
Text
_-
.
-
.
.
-
s
1
.
APR 141989
l
l
Docket flo. 50-461
Illinois Power Company
ATTil: 11r. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. H. fleisler of
this office on 11 arch 1-3 and flarch 31, 1989, of activities at Clinton Power
Station, Unit 1, authorized by fiRC Operating License No. flPF-62 and to the
discussion of our findings with lis. K. Baker at the conclusion of the
inspection. The purpose of this inspection was to verify the installation of
additional remote shutdown capability.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the flRC
Public Document Room.
He will gladly discuss any questions you have concerning this inspection.
Sincerely,
g42gg $8
i
DEIGIEALEIGNEDEYEICFJlpW7 CCOE:
.
0
R. U. Cooper, Chief
Engineering Branch
Enclosure:
Inspection Report
No. 50-461/89012(DRS)
See Attached Distribution
f~' '>
VW
Ffdf
RIII
RIII
^I I
R
e
w
R&
pnL
ler/mp
Gardner
C
er
p/n
i
yes
Msi
'
3
W/
_
_ _ _ - _ - _ _ _
k
.
.
.. ..
.
.
Illinois-Power Company
2
APR 141989
. Distribution
,
cc w/ enclosure:
.
D. P. itall,-Vice President
,
.J. S. Perry, Assistant-
.
Vice President-
-R. D. Freeman,. Manager,
Nuclear Station
Engineering Department:
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division, Sargent & Lundy
Engineers
David Rosenblatt, Governor's
Officetof Consumer. Services
Sheldon Zabel, Esquire,
Schiff, Hardin, & Waite
L. Larson, Project Manager,
General Electric Company
Chairman of DeWitt County
Illinois Department of
Nuclear Safety
D. Scnopfer, Project llanager,
Sargent & Lundy Engineers
1
1
l
,
L
b