Omaha Public Power District 1623 Harney Omaha, Nebraska 68102-2247 402/536 4000 April 11, 1989 LIC-89-379 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, DC 20555
References:
1.
Docket No. 50-285 2.
Generic Letter 87-12, " Loss of Residual Heat Removal (RHR)
While the Reactor Coolant System (RCS) is Partially Filled",
dated July 9, 1987 3.
Generic Letter 88-17, " Loss of Decay Heat Removal," dated October 17, 1988 4.
Engineering Evaluation of Fort Calhoun Station loss of Shutdown Cooling at Mid-Loop Conditions, dated September 1988 5.
Letter from OPPD (K. J. Morris) to NRC (Document Control Desk) dated January 4, 1989 (LIC-88-1106) 6.
Letter from 0 PPD (K. J. MorH s) to NRC (Document Control Desk) dated February 10, 1989 (LIC-89-045)
Gentlemen:
SUBJECT:
Response to NRC Generic Letter 88-17 On February 10, 1989, Omaha Public Power District (0 PPD) provided a summary of actions and proposed enhancements in response to the recommendations in Generic Letter 88-17, " Loss of Decay Heat Removal." This letter provides a confirmation that the two modifications listed in reference 6 (1) tygon tubing; and 2) installing a second control room RCS refueling level instrument) will be completed during the 1990 refueling outage.
Planning has been progressing on both modifications.
It has been determined that the engineering can be completed and we believe the materials can be procured on a schedule so that these modifications can be installed during the 1990 refueling outage.
OPPD believes the actions described above and in references 5 and 6 will provide for complete compliance with Generic Letters 87-12 and 88-17.
89042i0067 890411 PDR ADOCK 05000285 P
FDC b
0 unpioumengngu;i opponunau 4sse4
U. S,I Nuclear Regulatory Commission
' - LIC-89-379
. Page 2
~
This response is being submitted under oath pursuant'to the provisions of
'Section 182a of the Atomic Energy Act of 1954 as-amended.
If you have further -
questions concerning this' matter, please contact me or members of my staff.
Sincerely, WkM A K. J. Morris I
v Di. vision Manager j
Nuclear Operations KJM/jak c:
LeBoeuf, Lamb, Leiby & MacRae R. D. Martin, NRC Regional Administrator P. D. Milano, NRC Project Manager P. H. Harrell, NRC Senior Resident Inspector l
l l
i 1
I
1 I.' ' l. -
VNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In'the Matter of
)
)
- Omaha Public Power District
)
Docket No. 50-285 (Fort Calhoun Station
).
Unit No. 1)
)
l AFFIDAVIT W. G. Gates, being duly sworn, hereby deposes and says that he is the Plant Manager - Fort Calhoun Station of the Omaha Public Power District; that as sech he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached.information concerning the response to NRC Generic Letter 88-17; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information, and belief.
W$M W. G. Gates Plant Manager Fort Calhoun Station STATE OF NEBRASKA)
)
ss COUNTY OF DOUGLAS)
Subscribed and sworn to before me, a Notary Public in and for the State of Nebraska on this
// ra day of April, 1989.