Amend 25 to License NPF-5,extending Limiting Condition of Operation of Diesel Generator Operability from 72-h to 18 Days
ML20244B643
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/18/1981
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Georgia Power Co, Oglethorpe Power Corp, Municipal Electric Authority of Georgia, City of Dalton, GA
Shared Package
ML20039F892 List:
References
NPF-05-A-025, TAC 47446 NUDOCS 8201140022
Download: ML20244B643 (5)


Text

h{hi.lfO'" f??? ( '

.fi?lx. v x.,.

iJ w

m,(

n W'

?

[**%g b

r

UNITED STATES -

jf7 O M" / qliy iL NUCLEAR REGULATORY COMMISSION

~g' wasHWCTON, D. C. 20555 g ?:

' 4 pM..'. p

-GEORGIA' POWER COMPANY y

s f

OGLETHORPE POWER CORPORATION'.

y J

MUNICIPAL ELECTRIC AUTH0RITY OF GEORGIA.

~

CITY.0F DALTON,-GEORGIA-d

,s DOCKET NO. 50-366-p "EDWIN I. HATCH NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE D

H 7

' Amendment No. 25 License-No.'NPF-5 y

lr

1. :The Nuclear Regulatory Commission (the Commission) has found that:.

T

' A. ' The application for amendment 'by Georgia Power Company, et al.,.

(the' licensee)' dated December 18,1981, complies with the standards and requirements:of the Atomic Energy Act of'1954, as amended (the;

f Act) and the Commission's rules and regulations
set forth in 10 CFR Chapter.I;

~

+

f A The facility will~ operate in conformity with the application',-

H the provisions of the Act, and the rules and regulations of the Commission;

,.a :

C.

There is reasonable assurance 1(1) that' the activities authorized by this. amendment can be conducted without endangering the nealth

' ~ ^j c.

.and safety of the public, and (ii) that suchlactiv t es.will be ii conducted in compliance with the Commission's regulations;=

[

0.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public;-

l

'[

and

Y' "I-E.

The issuance of this amendment is in accordance with 10 CFR Part 1

J 51 of the Commission's regulations and all' applicable requirements j

ll have been satisfied.

d 2.

Accordingly, the license is amended by changes to the Technical Spec-l 1

ifications as indicated in the attachment to this license amendment 5

W :

'and paragraph 2.C.(2) of Facility Operating License No. NPF-5 is hereby amended to read as follows:

i 1

m,,

(2) Technical ' Specifications I

The Technical. Specifications contained in Appendices A and B,- as revised through Amendment No.25, are hereby incorporated in the license. The licensee shall operate the facility in

'accordance with the Technical Specifications,

]

i i nb\\\\%ti?2 M j

sam;.

3e

_. i

f i t

'I l

-o 3

l l

2-t

'3, This pendment is effective as of thn date of issuance.

1 J.CR THE NUCLEAR RE LATORY COMMISSION

'{

\\

(

l t

Joh F. Stolz, Chief-ating Reactors Branch #4 e

Division of Licensing

)

{

Attachment:

Changes to the fechaical-Specifications j

i

't Date of issuance.: December 18, 1981

-f i

a j

f i

l i

i l

I 1

I

.j I

I l

4

~

i i

i I

'I 1

'i.

'l t

)

l

=_

=

f[. [

5,_,%.~

..,.,'s.

- e.,

.,s,

~

~W

'E-

,~ - 2.. -- 7;-

u-

7 7 ;,>

M

.. s i

1 7

.s

[g#, g...

m.

m.<*:e ay E'?

sO a

X

.6

,Vi.

l. f,,, -

f

.g y

.,.;r-l,;

,s 3 1

?

!f V

l ATTACHMENT.'TO LICENSE AMENDMENT N0; 25<

L,.

4 l(; R

.. - ;v t

~ ;

\\

' ' FACILITY ' OPERATING LICENSE NO. NPF 5

D.

4

~

L

,,t.

a e<,

n

. \\

\\

1,

f.

'c [

h P 'l r

/-

00CKET NO. 50-166

> 1:n -

\\

,, ?~'

g t

[.)

F:(

' Replace the,following pages of the Appendix "A" Technical Specifications with the enclosed pages. Tne' revised pages: are identified by Amendment d

number and contain vertical lines indicatin'g the area of change. - The '

dj overleaf pages:are provided to maintain document completeness.,

1

)

r

. Remove Insert' l

a l

'3/4 8-1 3/4 8-1,

3/4 8-2 3/4 8-2 l

7-

,.i I

r

+

J a

1 a

i

. s_,

k

)

, ' ~

9 i

w

\\,

i f-n, l.

g,,y 1

(4

{

be

1,' '

'(

a 4

,l

't l

i 1

1

,'l-j

' l i

y 2

)

i i

m-L_----.-..-._--.u..

^

6._

/

4-

.]

,' r ~. c -

' ELECTRICAL. POWER SYSTEMS j.y q ';

LIMITING CONDITION FOR OPERATION (Continued) j 1_,

t i

ACTION (Continued) l ax cb-

- cuits and three diesel generators ** to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the' time of initial loss or be in at least HOT SHUTDOWN.

j 4

.within the~-next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following l

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

i 4

c.

With two cf the above req 0 ired offsite A.C. circuits inoper-N' n

able, demonstrate the OPERABILITY of three diesel generators foy performing. Surveillance Requirement 4.8.1.1.2.a.4 within one hour and at laast once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, unless the diesel ~ generators are already operating; restore at least one l

of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> cr be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

f

~With only one offsits source restored, restore at least two offsite c 4cuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT SHUT 00WN within the J

1 next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

6 With two of the above required diesel generators inoperable.

l demonstrate the OPERABILITY of tha remaining A.C. sources by 1;

performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 1

within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; 11

' restore at least one of the' inoperable diesel generators to OPER/3LE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or he in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and'in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore three diesel generators ** to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at. least HOT SHUTUOWN within'the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

]'

i

. SURVEILLANCE REQUIREMENTS i!.

)

4.8.1.1.1 Each of the above required independent circuits between the i

Offsite transmission network and the onsite Class lE distribution l('

j syst6,n shall be:

a.

Deteimined OPERABLE at least once per 7 deys by verifying correct breeker alignments and indicated power availeblity, i

and b.

Demonstrated OPERABLE at least once per 18 months during shutdown by transferring, manually and automatically, unit power supply from the nonnal circuit to the alternate, circuit.

-l For the less of the 2C dinel generator from 12/16/01 thru 1/3/82, b

lC restore diesel generators 2A and 18 to Operable status. The provisions of Specification 3.0.4 do not apply for this change.

l

)

.i HATCH UNIT 2 l

)'

3/4 8-2 Amendment No, ?S 1

t

- c

'3/4.8 '_ ELECTRICAL, POWER SYSTERS

(

I 3/4.8.1 A.C, SOURCES l

A.C. SOURCES - OpERATIM

. L1MITING CONDITI0i4 FOR OPERATION i

3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPE W LE:

\\

a.

Two physically independent circuits bet'veen the offsite trans-mission network and the onsitt Class IE, distribution system, and b.

Three separate and independent diesel generators, each with:

>{

I 1.

A separate dey tank containing e misdmum of 900 gallons

)

}

of fcel, I

1 i^

2.

A separate fuel storage tank c.pntaining a minimum of

{

32,000 gallons of fuel, and 3.

A separate fuel transf6r pump

'j i

APPLICABILITY: CONDIT,10NS 1, 2, and 3.

1 J

ACTION:

i i

a.

With either one offsite circuit 6r one diesel generator of the l

above required A.C. electrical power sour.ces inoperable, W

demonstrate the OPEkA81LITY of the remaining A.C. sources by i

jl performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2 a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter;* restore at least two offsite circuits and three diesel generatcrs** to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTD6dN within the following

~j 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, j

l e

I b.

With one offrite circuit and cre diesel generator of the above

)

required A.C. electrical power sources inoperable, demonstrate the j

OPERABILITY of the remaining A.C. sources by perfonning Gurved11ance

~

Requirements 4.8.1.1.1.a and 4.8,,1,1.2.a.4 within one hour and at 3

least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereaftsr; restore at least one of the inoperable sour:es to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ana in COLD SHUTD3WN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore at least two offsite cir-l 1

  • For tne loss of the 2C diesel generator from 9:00 a.m. ES712/16/81 thru

)

{

9:00 a.m. EST 1/3/82, perform Surveillance Requirement 4.8.1.1.'..a at j

least once per B hours, and perform Surveillance Requirement 4.8.1.1.2.a.4 l

at three day staggered intervals for diesel generators 2A and 18. The pro-3 visions of Spec'ification 3.0.4 do not apply for this change.

    • For the loss of the 2C diesel generator from 12/16/81 thru 1/3/82, restore i

diesel generators 2A and 18 to Operattle status. The provisions of Specift-cation 3.0.4 do not apply for this change.

,1 HATCH - UNIT 2 3/4 8 1 Amendment No. 25 t_

_3

n.

y ;p 4,

..ch%l, _ y"I t"

\\.//)-O y ]9fq

~

l T

+

r 1

g;fy.

i C

pk, 7590-01 a-d y

v

>(

-f f,

1.

+

1 g

oy q

gb7

' UNITED STATES' NUCLEAR ~ REGULATORY COMISSION y

i m.

DOCKET NO.-50-366 a

t.

-a i

' GEORGIA POWER COMPANY, ET AL.

'1 d

\\

i

]n f NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY 1

OPERATING LICENSE l

-j

-{

g.

cc The U.S. Nuclear' Regulatory Commission (the Commission) has issued h

1 n

Amehdment Mo'. 25 to Facility Operating Lfcense No, NPF-5, issued.to

']

a o

1 Ge' rgia Powr Company, Ogle 2horpe Power Corporation, Municipal Electric j

o

E Association of. Georgia,' and City of. Dalton, Georgia, which revised

+

d Techr.ical 5 specifications for operation of the Edwin I. Hatch fluclear Plant j

s q

Unit 'No,'2 -(the facility) located in Appling County, Georgia. The

'j q

- amendment is effective as of the.date of. issuance.

d 0

The amendment consists of temporary changes to the Technical 1

,s.

pi Specifications, ' The 1imiting cordition 'for. Operation on :diepel generator'

}

operability is extanded from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />' to 18 days scarting at 9@0 AM EST cn December 19 1981 and expirbg at 9iOO _ AH on January 3.,1982, wl 3

mS

L l1; The application for amendment complies with the standards and-

, I q

1 requireinants of the Atomic Energy Act of 1954, as amenos.,1 (the Act).. and t

s f

i the Commission's rules and' regulations. The Commission has made appropriate

[

findings as required by the Act and the Commission's rules and regulations d

h f

1 in'10 CTk Chapter I, which are set forth in the license arrendment. Prior y

[

public notice of this smendment was not required since the amendment does.

.)

y not involve a significant hazards consideration.

j. a t

i The Commission has determined that the issuance of this amendment will u

K not result in any significant environmental impact and that pursuant to 10 j

CFR Section 51,5(d)(4) an environmental impact statement, or negative declaration i

l' pi.

o. g r/, n _,

y

.9 1

7g, W w <.<a -...,, _ _..:.

s__ t r

-}

fth%@hbh1 b';[

U-IhM/@l ;W ' S, WiM *i.. : _ :

m

,3'

c;

[h,9#hR. f,,, ". s h

34 ypJ[!C 0

M M

y

.t "y; ' ' ' '

7,

,f o

.?

7590-Olu,

1 w

9:

i.

\\.:,:/

2..

1 g

l >1 H

and enviroreentai-impact appraisai rieed not be prepared. in connection w'th; i

en r

a' Jissuant.e of this. amendment, '

3 s.

.+-.

>?

For further' details Ewith[ respect to th'is action,Lsee (1) the.-application 3;

l

'for' amenEment dated December 18, 1981, (2) Amendment No. 25.to Licende j

No. NPF-L, and (3) the Commissions letter to. Georgia Power Company dated y

"s

-December 18, 1981. All of these items are available-for public' inspection.'

.at the Connission's' Public Document Room,1717 H' Street, N.W.,'Wa' hington, s

W

'O.C., and'at the Appling County Public !.ibrary, 301 City Hall Drive,

, Baxley,. Georgia 31513. A copy of items (2) and (3) may be obtained upon legdest addressed to the 0.S. Nuclear Regulatory Commission, Washington,-

j D.C.

_20555, Attention e ' Director, 'Divis'16n of Licensing.

Dated at Bethesda, Maryland, this 18th day of December 1981.

i FOR THE NUCLEAR REQULATORY COMMISSION

-l w3 6

n k_

h~<

i

.Jdhn

. Stolz. Chief

'ppe ating Reactors Branch #4 l

i-Qi ision of Licensing j

n.

.i 1

J.

i w

1

)

a h

21 e_

M__-r4r

.m-r I

..,,x w

g.,

+

y y

M' R%

o UNITED STATES g.

T g

' NUCLEAR REGULATORY COMMISSION

,]

4 3,

j wAsHmorou, o. c.20sss

[

\\... [

. December 18, 1981 I

1 Docket No. 50-366

'E Mr.J;T.Beckham,Jr.

Vice President - Engineering

' i Georgia Power Company

'P. 0. Box 4645 4

Atlanta, Georgia 30302

]

1

.b

Dear Mr. <Beckham:

.Fj The Commission has issued the enclosed Amendnent No. 25 to Facility

. Operating License No. NPF-5 for the Edwin I. Hatch Nuclear Plant,.

l

.]:

Unit 2, The amendment consists of temporary changes to the Technical

't Specifications (TSs) in response to your application dated December 18, 1981.

i

)

' The. change to the TS extends the limiting conditions of operation on.

diesel generator operability from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 18 days. The' extension

starts at 9
00 AM EST on December 19, 1981 and expires at 9:00 AM EST

,s on January 3,1982.

1

.Your letter of December 18, 1981, informed us that one of the three diesel generators used as a ' source of emergency power at the Hatch j

Nuclear Station - Unit No. 2,'was inoperable. You stated that repairs could be accomplished if you could be granted a 15 day extension in-the applicable TS and thus avoid a shutdown of the Unit. You' stated i

that. the likelihood of a loss-of-coolant. accident during the 15 day L

extension period is. acceptably low.. In addition, you stated that the j

s l' Hatch Station is supplied offsite power from a very reliable electric J

grid with 5 incoming transmission ifnes. To compensate for the loss of one of the diesel generators, you plan to verify operability of the j

remaining diesel generators through an increased surveillance plan and i

q to increase surveillance to ensure operability of your.offsite power sources. We conclude that extended operation of Unit 2 for 18 days, total, is acceptable as the staff agrees with the rationale presented j

above and with the compensatory actions.

We have determined thet the amendment does not involve a change in l

effluent types or total amounts nor an increase in power level and will not retolt in any significant environmental impact. Having made this determination, we have further concluded that the amendment involves h.

an action which is insignificant from the standpoint of environmental i

[

impact and pursuant to 10 CFR Section 51.5(d)(4) that 'an environmental j

D impact statement or negative declaration and environ, mental impact i1 appraisal need not be prepared in connection with the issuance of this

}-

amendment.

j

'L obhrm: = ' --

I

,.1

, m

.o p,

% +.- 4

%g,..

QW'.

4 " =

..,v f y+.,' '

^

a

, y 1

- j.

.u

{.l

,1.

'1

+

j 4

h.

-i

-2 '.

g

+

G'

/We have concluded based on the considerations discussed above, that:

(1) because the amendment does not involve a significant increase in t-the. probability or conseqdances of accidents previously considered and-F'

.@i

= does not. involve a significant decrease in a safety margin, the amend-

/

-ment does not involve a significant hazards ' consideration,.(2) there is I

reasonable a:surance that the health and safety'of the public will not Qt..

be endangered by operation in the' proposed manner, and -(3) such activities will be conducted in compliance with the Commission's J,-

J{.i regulations and the issuance of this-amendment will'. not be inimical to.

~!

~

. the common defense and security or. to the health and safety of the public, A[ copy of a 'rel'ated Notice of ' Issuance is also enclosed.

.j

((

Sincerely I

4

/.

J 5 F. Stolz, Chief rating Reactors Bra

  1. 4

]

ivision of Licensing 4

a!.

Enclosures,:

1.

Amendment' No. 25 to NPF-5 2., Notice i

cc w/ enclosures:

p See next page 4

ii-J n.

1 g-3 4

,i 3

I

=

=- - __- _

- - ~-

G~

T

i..L._

]

q <.. i - i.

LEJ

[

~ Hatch 1/2 Yor Company 5'0-321/366 Georgia Po

.3 i

cc w/ enclosure (s):,

G. F.=Trowbridge, Esq.

Saaw, Pittman, Potts and Trowbridge

'1800 M Street N.W.

l Washington, D. C.

20036

~

.]

Ruble A. Thomas j

Vice President l

P. O. Box 2625 Southern Services, Inc.

cc w/ enclosure (s) & incoming dtd.:

]

Birmingham,' Alabama 35202 12/18/81

}-

Ozen Batum Charles H. Badger

{

P. O. Box 2625 Office of Planning and Budget l

4 Southern Services, Inc.

Room 610

- Birmingham, Alabama 35202

.270 Washington Street, S.W.

Atlanta, Georgia 30334 Chairman

(

Appling County Commissioners County. Courthouse Baxley, Georgia 31513 Mr. L. T..Gucwa i

Georgia Power Company Engineering Department 1

4 P. O. Box 4545 f

'j

- Atlanta, Georgia 30302 1

I Nr. Max Manry Georgia Power Company 1-Edwin I. Hatch Plant i

P. 0. Sox 442

~

Baxley, Georgia 31513 l

.l Regional Radiation Representative i.

EPA Region IV 345 Courtland Street, N.E.

Atlanta, Georgia 30308 I

Appling County Public Library

{

301 City Hall Drive i

Baxley, Georgia 31513

]

1 Mr. R. F. Rodgers U.S. Nuclear Reaulatory Conmission j

Route 1, P. O. Box 279 l

Baxley, Georgia 31513 j

i

~

q 1

i e==****vm,4 o,+

i. me wg

,,....,_.w.,..

,,,