Amend 81 to License DPR-44,extending Limiting Condition on Diesel Generator Operability from 7 to 10 Days
ML20031F592
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/28/1981
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20031F584 List:
References
TAC-47446, NUDOCS 8110200180
Download: ML20031F592 (4)


Text

.A pn Motiq'o 4

UNITED STATES NUCLEAR REGULATORY COMMISSION s.,

g ng WASHINGTON, D. C. 20555

%%, V #p PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CTIY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 AMEN 0 MENT TO FACILITY OPERATING LICENS5 Amendment No. 81 License No. OPR-44 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Philadelphia Electric Company, et al. (the licensee) dated September 28, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reason:ble assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that suen activities will be conducted in ccmpliance with the Ccmmission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and i

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Spec-ifications as indicated in the attacament to this license amendment and paragraph 2.C,(2) of Facility Operating License No. CPR-44 is hereby amended to read as folicws:

(2) Technical Scecifications l

The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 81, are hereby incorporated in the license.

PECo shall operate the facility in accordance

'with the Technical Specifications.

8110200100 810920' PDR ADOCK 05000277 P

PDR

.A 2

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Jcha F. Stoli, Chief Oyerating Reactors ranch #4 I

Latvision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: September 28, 1981

ATTACHMENT TO LICENSE AMENDMENT NO. 81 FACILITY OPERATING LICENSE NO. 0P1-44 7

DOCKET NO. 50-277 s-Add the following temporary page.to the Appendix "A" Technical Specifications (TSs). This page is identified by amendment number and may be removed s

after October 1,1981, as described in TS 3.5.F.1-temporary.

i..

Insert Page 132 Temporary

'., k

'4,

'h g

i 1

e I

s s

3, q

s PBAPS Unit 2

~

1

\\q j

-+

s s

.%'-x Limiting C'ondition for Operation

', ;rx.

s

,g.

3.5.F.1 -Temporary With one diesel generator inoperable, continued reactor operation of l

Unit 2 during the interval from 7:00 PM EDT, September 28, 1981, to 7:00 Fl4 EDT, October 1,1981, is permissible providing the remaining s., _

i

"% provisions of TS,3.5.F.1 are complied with.

I j

Surveillance Reg,ut ement

]

' 4.5.F.1;. Tempdedi _, '.:

/

..s

', N iihe,.~three, remaining diesels will be demonstrated to be operable twice

-i

, a day'sith at least a 10-hour interval between tests. The remaining provisions cf TS 4.5.F shall not be affected by this temporary change,

^

t

%.g 3

I-%.

i s

m e

i

-m.-

.g ]

ir v

'M e,

Y L,

t*%

f l

M s

t

(,

1 L

>y 4

Amendment No. 81

- 132 Temporary -