Interview W/Ma Terpening,Pullman Higgins Employee Re NDE Work Performed by Padovano
ML20238D538
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 05/24/1983
From: Matakas R
NRC OFFICE OF INVESTIGATIONS (OI)
To:
Shared Package
ML20238D476 List:
References
FOIA-86-188 NUDOCS 8709110240
Download: ML20238D538 (1)


Text

l * - . >

l Interview with Mr. Michael A. TERPENING, Pullman Higgins -(P-H) NDE Technician'

)

Mr. Michael A. TERPENING P-H Level 2 NDE Technician, was interviewed by Investigator R. A. MATAKAS at Seabrook, NH, on May 24,1983. TERPENING is .l a Level 2 NDE Technician and has worked for P-H at the Seabrook Station 1

since June 1982. J TERPENING corroborated information provided by P-H NDE Technician Mike ]

ACREE (See Attachment (17)) regarding the reinspection-by ACREE of a small  !

j' stitch weld in the March - April 1983 time frame which was originally l inspected by PAD"0VANO.

TERPENING said that shortly after he reported to work at Seabrook (before he was certified) he had occasion to work a magnetic particle (MP) examination i with PAD 0VANO. He said that in this inshance, the weld was inaccessible and after noting this fact, PAD 0VANO pointed at the weld and said, " bang-bang" got you, and walked away. TERPENING said he could not recall the weld I designation and he did not' know if. PADOVANO performed an inspection on the weld at a later date. 1 Other than the current investigation. TERPENING said that he was not aware of any other actual or suspected falsification of records nor was he aware l of anyone in P H management or supervision who may have such. information.

f.. -

Reported'by: d[ -

R. A. Matakas, Investigator Office of Investigations Field Office, Region I l

i

/

(