Forwards EGG-NTA-7761, Conformance to Reg Guide 1.97:Quad Cities-1 & -2, Interim Technical Evaluation Rept Partially Accepting Licensee Responses to Generic Ltr 82-33.Comments on Unjustified Reg Guide 1.97 Exceptions in Rept Requested
ML20238D264
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/03/1987
From: Ross T
Office of Nuclear Reactor Regulation
To: Butterfield L
COMMONWEALTH EDISON CO.
Shared Package
ML20237J323 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 GL-82-33, TAC-51124, TAC-51125, NUDOCS 8709110076
Download: ML20238D264 (3)


Text

..

Sept' ember 3, 1987 DISTRIBUTION

-Docket E11es9 NRC & Local PDRs Docket Nos. 50-254 PDIII-2 Rdg. File and 50-265 GHolahan TRoss

! LLuther 0GC-Bethesda' i l

Mr. L. D. Butterfield, Jr. Edordan l Nuclear Licensing Manager JPartlow l Commonwealth Edison Company ACRS(10)

Post Office Box 767 PDIII-2 Plant File Chicago, Illinois 60690

Dear Mr. Butterfield:

SUBJECT:

INTERIM REPORT ON CONFORMANCE OF "0ST ACCIDENT MONITORING INSTRUMENTATION AT QUAD CITIES 1 & 2 WITH R.G. 1.97, REVISION 2.(TAC NOS. 51124 AND 51125)

In response to Generic Letter 82-M , Commonwealth Edison Company (Ceco) submitted several letters which audressed Quad Cities compliance with Regulatory Guide (R.G.) 1.97, " Instrumentation for Light-Water Cooled Nuclear Power Plants to Assess Plant and Errors Conditions During and Following an Accident", and established implementation schedules. A detailed review of these letters was conducted by the Idaho National Engineering Laboratory (INEL). An interim report (EG&G-NTA-7761) 1 documenting this review and referencing applicable CECO submittals.was l prepared by INEL for the NRC as part of a technical assistance program. '

The NRC staff has subsequently evaluated the INEL interim report-(enclosed herein) and referenced letters. ,

It is the staff's determination that CECO has explicitly committed to conform with R.G.1.97 at Quad Cities Station, except for those items which CECO specifically identified as otherwise. For certain items, CECO's justifications for exception to R.G.1.97 were considered accept-able. However, there were some items that INEL'ano the staff could not conclude were acceptable based upon the justification provided. These unjustified R.G.1.97 exceptions continue to. remain outstanding. . CECO  !

should address all outstanding, unjustified exceptions (specified in the  ;

enclosed interim report) by a written response to the NRC within sixty l days. Furthermore, CEC 0 should also review the enclosed interim report j l

y 8709110076 870903 PDR ADOCK 05000254 p PDR l

- . _ _________ _ o

. Mr. L. D. Butterfield, Jr. -2 September 3, 1987 and provide comments for any incorrect assumptions or commitments presumed by IhEL which were beyond the intent of previous CECO letters.

Upon receipt of this requested response, assuming all outstanding items, are adequately justified, a safety evaluation from the staff will be forthcoming.

f'?b, Thierry M. R(oss, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated cc:

See next page I

0FC  : PDIII-2  : PDIII-2  : PDIII-2  :  :  :

. . . . . .: :TRoss/ . . . . . _ _ _ j_/d_: ___:________. g __:..__. 7_.

NAME

______:-_______________:______..______:_y LLuthe m : R 17e  :  :  :

DATE : 9/ 0 3 /87  : 9/r3 9 /87  : 9 / 57 /87 :  :  :

m 1

L'* Mr. L. D. Butterfield, Jr. Quad Cities Nuclear Power Station Commonwealth Edison Company Units 1 and 2 cc:

Mr. Stephen E. Shelton ,

Vice President Iowa-Illinois Gas and Electric Company i P. O. Box 4350 Davenport, Iowa 52808 Mr. Richard Bax Station Manager Three First National Plaza

1. Suite 5200 Chicago, Illinois 60602 Mr. Nick Kalivianakis Plant Superintendent Quad Cities Nuclear Power Station 22710 - 206th Avenue - North Cordova, Illinois 61242 I Resident Inspector U. S. Nuclear Regulatory Commission 22712 206th Avenue North Cordova, Illinois 61242  ;

Chairman Rock Island County Board of Supervisors 1 1504 3rd Avenue Rock Island County Offfice Bldg.

Rock Island, Illinois 61201 s i

Mr. Michael E. Parker, Chief Division of Engineering Illinois Department of Nuclear Safety 1035 Outer Park Drive 5th Floor Springfield, Illinois 62704 Regional Administrator, Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 l