4
AUG 2 4 1987
-
Docket No.
50-293
Boston Edison Company M/C Nuclear
ATTN:
Ralph G. Bird
Senior Vice President - Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection No. 50-293/87-29
,
A ruutine radiological controls ir.,pection was conducted by R. L. Nimitz of
this office on July 13-17, 1987 at the Pilgrim Station.
The findings of the
inspection were discussed with you.
The inspection covered: the adequacy and implementation of your action
on previous NRC findings; in plant radiological controls; and several worker
1
concerns.
As discussed with you at the exit meeting, improvements are needed in the area
of close out of previous NRC findings.
Regarding the worker concerns, no significant deficiencies were identified.
However, one violation was identified in the area of radiological controls and
is included in the enclosed Appendix A.
The violation involved an individual
entering a posted High Radiation Area without the radiation work permit
required survey meter.
You are required to respond to this violation in
accordance with the enclosed Appendix A.
The response directed by this letter and accompanying Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter n %, reciated.
Sincerely,
g
Oricir.a1 Signed Y(
G708310170 870824
'
ADOCK 05000293
G
'
i
Thomas T. Martin Jirector
Division of RadiaYion Safety
and Safeguards
Enclosure:
NRC Region I Inspection Report No. 50-293/87-1T
OFFICIAL RECORD COPY
IR PILGRIM 87-29 - 0001.0.0
08/10/87
4
37
- - -
i
a
{
Boston Edison Company M/C Nuclear
2
M 2 4 1937
1
cc w/ enc 1:
K. P. Roberts, Station Manager
i
Paul Levy, Chairman, Department of Public Utilities
1
Chairman, Board of Selectmen
k
Plymouth Civil Defense Director
1
J. D. Keyes, Boston Edison Regulatory Af fairs
i
The Honorable E. J. Markey
Senator Edward P. Kirby
,
The Honorable Peter V. Forman
)
Sharon Pollard, Secretary of Energy Resources
Rachel Shimshak, MASSPIRG
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bec w/ encl:
Region I Docket Room (with concurrences)
l
Management Assistant, DRMA (w/o encl)
!
Section Chief; DRP
W. Raymond, SRI, Millstone
l
H. Eichenholz, SRI, Yankee
Robert J. Bores, DRSS
,
h
RI:DRSS
RI:DRSS
- 0 1
/
Nimitz/gcb
Shanbaky
Bely
/
8/1}/87
8/12/87
8/l'J/87
dN
h,OFFICIALRECORDCOPY
IR PILGRIM 87-29 - 0001.1.0
08/10/87
3
4
_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _
__;