ML20237K120

From kanterella
Jump to navigation Jump to search

Responds to Util 870707 Request for Schedular Extension for Installation of 0-4000 Psi RCS Pressure Indication Required by Reg Guide 1.97,Rev 2.NRC Approved Schedule for ATWS Implementation During Third Refueling Outage
ML20237K120
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/20/1987
From: Joshua Wilson
Office of Nuclear Reactor Regulation
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
RTR-REGGD-01.097, RTR-REGGD-1.097 TAC-65786, NUDOCS 8708270062
Download: ML20237K120 (2)


Text

_ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ ___ _

I August 20, 1987 Docket No. 50-382 Mr. J. G. Dewease Senior Vice President -

Nuclear Operations I Louisiana Power and Light Company i 317 Baronne St., Mail Unit 17 l New Orleans, Louisiana 70160

Dear Mr. Dewease:

SUBJECT:

RCS PRESSURE INSTRUMENTATION RANGE (TAC NO. 65786)

By letter dated July 7, 1987, Louisiana Power and Light Company (LP&L) requested a schedular extension for installation of 0-4000 psi Reactor Coolant System (RCS) pressure indication required by Regulatory Guide (R.G.) 1.97, Revision 2 to cover the range that could exist during a severe ATWS by the end of the third refueling outage rather than by the end of the second refueling outage as previously planned. It was originally intended that the pressure indication installation schedule be consister.t with the implementation of the ATWS Rule (diverse scram and turbine trip systems) which was also scheduled for the second refueling outage.

Our staff has reviewed your request for a schedular extension and notes that the Commission has now approved a schedule for ATWS implementation during the third refueling outage. The R.G. 1.97 RCS pressure instrumentation needed for ATWS mitigation will thus be installed and operational with the rest of the ATWS instrumentation. Also, until installation is complete, Waterford 3 has, as part of its reactor protection system instrumentation, four channels of Class IE RCS pressure instrumentation with a range of 0-3000 psi. This instrumentation is considered satisfactory for interim operation until the rest of the hardware required to meet the ATWS Rule is installed during the third refueling outage.

Therefore, the staff concludes that your request for an extension of the schedule for installation of the 0-4000 psi RCS pressure instrumentation is acceptable. If you have any questions concerning the staff's review, please contact me at (301) 492-9403.

Sincerely, 8708270062 870820 JJ/

fDR ADOCK 050 2 James H. Wilson, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects cc: See next page DISTRIBUTION

  • Docket File

_ NRC PDR Local PDR PD4 Reading F. Schroeder P. Noonan J. Wilson J. Calvo OGC-Bethesda E. Jordan J. Partlow ACRS (10)

B. Marcus PD4 Plant File LTR NAME: LTR. TO DEWEASE TAC 65 86 O PD4/LA PD4/FQ y) $ 8 B' PD4/D / M.

PNoon JWils9 .sr JJoyce JCaivo '

8/11/8 8//f/6 8//cf/87 8/2c/87

y.

Mr. Jerrold G..Dewease Waterford 3 Louisiana Power & Light Company cc:

W. Malcolm.Stevenson, Esq. Regional Administrator, Region IV Monroe & Leman U.S. Nuclear Regulatory Commission 1432 Whitney Building Office of Executive Director for New Orleans, Louisiana 70103 Operations 611 Ryan Plaza Drive, Suite 1000 Mr. E.-Blake .

Arlington, Texas 76011 '

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW. Carole H. Burnstein, Esq.

Washington, D.C. 20037 445 Walnut Street New Orleans, Louisiana 70118 Mr. Gary L. Groesch Post Office Box 791169 Mr. Charles B. Brinkman, Manager New Orleans, , Louisiana 70179-1169 Washington Nuclear Operations Combustion Engineering, Inc.

Mr. F. J. Drummond 7910 Woodmont Avenue, Suite 1310 Project Manager - Nuclear Bethesda, Maryland 10814 Louisiana Power & Light Company Mr. William H. Spell, Administrator 317 Baronne Street- .

New Orleans, Louisiana 70160 Nuclear Energy Division Office of Environmental Affairs Mr. K. W. Cook Post Office Box 14690 Nuclear Support and Licensing Manager Baton Rouge, Louisiana 70898 Louisiana Power & Light Company 317 Baronne Street President, Policy Jury New Orleans, Louisiana 70160 St. Charles Parris Mahnville, Louisiana 70057 Resident Inspector /Waterford NPS

' Post Office Box 822 Killona, Louisiana 70066 Mr. Ralph T. Lally Manager of Quality Assurance Middle South Servies, Inc.

Post Office Box 61000 New Orleans, Louisiana 70161 Chairman Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 i

L '

l l

L  !

_ _ _ . _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - - _ - - _ _.