ML20237E211

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1987
ML20237E211
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/30/1987
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20237E213 List:
References
NUDOCS 8712280216
Download: ML20237E211 (14)


Text

.

p.-

DFERATING DATA REPORT DOCLET 50-369 DATE 12-15-87 OPERATING STATUS COMPLETED BY J. A. Reavis TELEPHONE 704/373-7567

1. Unit Name: McEUIRE 1
2. Reporting Period: NOVEMBER 1,1987-NDVEEER 30,1987
3. Licensed Thersal Ponet (MWt):

3411

=..

6. Noseplate Rating (Gross MWel:

1305e i Notes #Naseplate Rating 1

5. Design Electrical Rating (Net MWe):

1180 1 (Gross MWe) talculated as 1

6. Gaximus Dependable Capacity (Bross MWe):

1 1450.000 MVA x.90 poner 1

7. Maxieue Dependable Capacity (Net MWe):

1150 i factor per Page lii, I

8. If Changes Occur in Capacity Ratings (Itess Nuaber 3 Through 7) Since Last i NUREG-0020.

I I

=l Repert. Bive Reasons:

9. Pcwer Level 7o Which Restritted, If Any (Net MWe):
10. Reason for Restrictions, If any:...........___

This Montt Yr.-to-Date Cuaulative

11. Hours In Reporting Period 720.0 8,016.0 52,564.0
12. Nusber Of Hours Reactor Was Critica!

437.8 6,113.5 36,141.4

13. Reactor Reserve Shutdown Hours

--0--

--0--

--0--

14. Hours Ber:erator On-Line 392.7 5,997.7 35,625.2
15. Unit Reserv: $%,down hours

--0 ~

- --0--

16. Gross Thersai E.iergy Benerated (MWH) 1,101,430 19,863,732 102,817,942
17. Gross Electrical Energy Generated (MWH) 378,008 6,867,734 35,602,911
18. Net Electrical Energy Generated (MWH) 353,936 6,586,529 33,903,322
19. Unit Service factor 53.2 74.B 67.8
20. Unit Availability factor 53.2 74.0 67.6
21. Unit Capacity Factor (Using MDC Net) 42.8 71.5 55.1
22. Unit Capacity Factor (Using DER Net) 41.7 69.6 54.6
23. Unit forced Dutage Rate 4.4 4.9 13.1
26. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At End Of Report Feriod. Estitated Date of 5tattup:_..................._................................
26. Units In Test Status (Prior to Consercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICliY COMMERCIAL DPERATICN 8712280216 871130 T$f f /

PDR ADOCK 05000369 !

./

R DCD

6 AVEPAGE DAILI UNIT POWER LEVEL DDCKET NO.

50-369 UNIT McGuire !

DATE December 15,1987 COMPLETED BY L A. Reavis TELEFHONE 704-373-7567 MONTH.

N0'.' EMBER DAY AVERASE DAILY POWER LEVEL DAY AVERASE DAILY POWER LEVEL (MWE-Net 1 (MWE-Net) 1 0

17 991 2

0 18 1150 3

0 19 426

...... =. -

.......=

4 0

20 411 5

0 21 1097

=

6 0

22 1135 7

0 23

!!30 B

0 24 1106 9

0 25 1053 10 0

26

!!24 11 0

27 1121 1

12 0

2B 1120 13 0

29 1123 14 38 30 1126 15 -

291 16 637 i

1

_____-w_-u._.

_ E 8 R_3 6I 5. -

V E

NE S

9RL A

t st -

I I

.)

I C

OR E

T T

C

- at rG 3U1 9_ 0 4

T N

I P T

S S

G reoE C

E S

E E

N N

GaepR

- GL 0C2 7

E R

NH P

T T

I O

ph eU 5_t_

q 1_

j1 ROR EG T

I t eSRN I

RTU TI R

ET ET S

T i r O

C XH D

T NS NS E

A bP yt

.EEYE CNE E

O I

rn E

I E T

T i

OMTBN OR DS D

BC BU N

h rt el I

NAA O

DI EEM R

E RO RQ N

E xonvi NDDH NTT GGA E

E UE UE O

M EfEEF

)

T EP ACN AAR P

P TR TR I

U 4

ET TE AE TMH S

T R

(

KI EL E

V UAP K

R ER ER A

T CN LE S

E ODA A

E RE RE L

S OU PT U

R I

O V

UR UR A

N D

M A

P GFD S

O SU SU C

I O

C NO ST ST S

m C

I E

E E

EC EC E

R a

LRN N

N RA RA A

r EI I I

I PF PF R

E mc UAB B

B U

U E

L aSl FPR R

R WN WN W

C r

EEU U

U OA OA O

U ccx RRT T

T LM LM P

N SiE t

- a S

l l N

aamr O

T d uuoe N

N N

N N

N X

U onnth I

T E

I I

I I

I X

R h aaut

)

C 2

5 NE B

B B

B B

X T

t MMAO U

8 OD R

R R

R R

X S

e-(

D 9

PO U

U U

U U

X N

M1 234

)

MC T

T T

T T

X I

3 E

1_

O R

(

r C

R e

E b

E W

m S MD A

A A

A A

E E

)

O e

4 Y EO H

H H

H H

I I

P v

S TC

(

o J_

D N

A E

S T

S NT R N

EN O W

H CE PO

)

O T

I V EN n

D N

LE R i

T O

a U

M l

H T N p

S T

TD U WX x

)

R 3EO FH O/

4 1

E T

O MH OS DR

(

t

(

I P

l s

N E

ee

)

U R

2 B

F B

B B

B B

rt RE AS ON u

(

l l r i o N

8 5

a O

0 4

F e c

S I

T R 9

0 t ngr 1

nanor AU RO 3

enit UH mel a pt el D

ninuurir ouif geme sqaeepd p

)

TYPE S

S S

S S

S S

aEMRRO 1

e-(

RABCDE

)

2 4

4 5

5 6

6 1

(

1 1

1 1

1 1

E 1

1 1

1 1

1 1

d 3

T 1

1 1

1 1

1 1

e A

l f

D 7

7 7

7 7

7 7

d u o

8 8

8 8

G 8

8 ed 1

ce rh e

oc g

p p

p p

p FS a

8 9

NO P

9 0

1 2

3 FS

)

2 3

3 3

3 1

l

(

_E 8 R_3 9R/

V E

RN T

A AE B

E S

t st -

6I 5

.)

I C

A(

S C

CS O

T M

- at rG 3 U 1_A_0 4

T N

H I

R E

reoE

- G/

C E

CE M

N NP P

N L

G a e pR 0C2 7

E R

V E

O OI O

B ph eU 5_M_1_ J_ (

ROR LL H

R P

O t eSRN I

I I

RTU AA C

T TT M

ST R

ir O

C GV A

A U

RS P

bP yt

.EEYE CNE U

Y T

TX P

UE i

rn OMTBN OR FL R

N NU CU E

h rt el NAA O

DI I O A

E EL N

X Q V

xonvi EE L

_NDDH NTT RR D

M MF I

EfEEF

)

T EP ACN TT N

U U

A R

A 4

ET TE AE NN O

R RH R

E V

(

KI EL E

V EO C

T TG D

RR CN LE S

E CC E

S SI UE R

OU PT U

R S

N NH R

SR O

D M

A P

ME I

I E

SU N

O C

OG R

T T

ET R

m C

RR O

R RES A

RC E

a FA F

A AS E

PA V

r H

E EET H

F O

mc MC D

L LR KU G

aSl AS L

C C

R CN r

EI O

U UOE C

AA 4

ccx LD H

N NTP BM SiE t

S l l a N

aamr O

T d uuoe N

X X

U U

X X

X onnt h I

T E

E X

R R

X X

E h aaut

)

C 7

5 NE V

X T

T P

X V

tMMAO U

8

(

OD L

X S

S M

X L

e-D 9

PO A

X N

N U

X A

M1 234

)

E 1

MC V

X I

I P

X V

3 R

O

(

r C

R e

E b

E W

m S MD G

G E

E J

A B

)

O e

4 Y EO C

H H

H H

I I

P v

S TC

(

o N_

D NA E

S T

S NT R N

EN O W

H CE PO

)

O T

I V EN n

D N

LE R i

T O

a U

M l

H T N p

TD U WX x

S T

)

R 3EO FH O/

E 1

T O

MH OS DR

(

t

(

I P

s N

E ee

)

U R

2 A

F B

B A

B A

rt REASON u

(

l r i o N

7 a

O 7

F e S

c I

TR 7

t ngr AU 1

nanor RO enit o UH mel at D

pt el ninuuri i

ouif gemeh s q a e e

)

TYPE F

F 5

F F

5 F

aEMRRO 1

e-(

RABCDEF

)

2 9

0 0

0 2

3 4

(

2 2

2 2

2 2

1 E

1 1

1 1

1 1

1 d

T 1

1 1

1 1

1 1

e 3

A l

D 7

7 7

7 7

7 7

d u fo 9

8 8

8 8

8 8

ed ce 2

rh oc e

p P

p p

p p

FS g

NO a

0 4

5 6

7 8

9 FS P

1 3

3 3

3 3

3

)

1

(

y'.

I 1l l

lllilI

))d

)1) i s

e nas e

g.

ot n c

iae r

_7-tDc u

3_

_6-c i

o S 9-ufL)

S I 7-ro R)

V-t rE1 e

_1-A 3-snoL6 m

-7E7-noF(

l a

_E 9 R_3-E I i O

S 2 R /-

V E

S t st -

6 I 5-

.)-

I C

M

- at rG 3 U 1 A_0-4-

T N

E reoE

- G /-

C E

L G a e pR I

0 C 2-7 E

R B

pheU 5 M 1 J_ (-

ROR O

t eSRN t

RTU R

ir

(

i O

C P

bP yt b

.EEYE CNE rne i

i OMTBN OR E

hrt el h

NAA O

DI V

xonvi x

NDDH NTT L

EfEEF E

)

)

T

.EP ACN A

4 5

E T.

TE AE V

(

(

KI EL E

V CN LE_

S E

R OU PT U

R O

D M

A P

N O

C R

m)

C E

an V

ri O

mca G

aSl r

p 4

ccx SiE t(

S l l a N

aamr O

T duuoe I

N X

onnth T

E E

haaut

)

C 7

5 NE V

tMMAO U

8 OD L

e-(

D 2

PO A

M1 234

)

MC V

3 E

1 R

O

(

r C

R e

n E

.b E

o W

m SMD B

)

i O

e 4

YEO H

t P

v STC a

(

o n

N_

D i

N m

A E

a S

T x

S NTR E

N ENO W

H CEPO e

)

O T

I VEN n

s D

N LER i

n T

O a

e

)

U M

l c

n H

TN p

ni i

S T

)

TD UWX x

oL a

R 3EOFHO/

E i

l T

O MHOSDR

( t t&

p

(

I P

s c

x N

E ee i g E

)

U R

2 A

rt rn

(

REASON u

ti

)

(

l r snern io eivoi N

a Raira O

Fe rt rl I S c

yT a E p TR t ngr r

x AU nanort rE RO enit oso(

UH mel at it D

pt el anar ninuurire ouif gemeh sqaeepd pt

)

1 TYPE F

aEMRROAOO e-(

RABCDEFGH

)

2 6

(

2 E

1 d

3 T

1 e

A l

f D

7 du o

8 ed 3

ce rh e

oc g

p FS a

ND P

0 F5

)

4 1

(

,(

t!l l\\l, l

l DOCKET NO:

50-369 UNIT:

McGuire 1 DATE:

12/15/87 NARRATIVE

SUMMARY

Month: November, 1987 McGuire Unit 1 began the month of November off line for its End of Cycle 4 Refueling Outage. The unit returned to service on 11/14 at 0705, and was taken off line at 2058 the same day due to a Turbine Overspeed Trip Test. The unit then returned to service at 0327 on 11/15 and following several startup related power holds, reached 100% full power at 1730 on 11/17. The unit remained at 100% until 1115 on 11/19, when it was removed from service due to an unidentified Reactor Coolant System leak. The unit returned to service at 0501 on 11/20, and following several startup related power holds, returned to 100%

full power at 0837 on 11/21. On 11/22 at 1146, the unit reduced power to 98%

due to problems with the "C" Heater Drain Pump. The unit returned to 100% power later that day, and at 0843 on 11/21 reduced power to 97% to perform a Turbine Back' Pressure Excursion Test. At 1430 on 11/24, the unit was reduced to 91% due to problems with the #4 Governor valve. The unit finished the month operating at 96% power, limited by problems with the #4 Governor valve.

I-I-

l MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown: November, 1988 3.

Scheduled restart following refueling: January, 1989 l

4.

Will refueling or resumption of operation thereafter require a technical l

specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

293 1

8.

Present licensed fuel pool capacity:

1463

{

Size of requested or planned increase:

)

4 9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August, 2010 l

DUKE POWER COMPANY DATE: December 15, 1987 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

s,'

e l

DPERAT!kS DATA REPORT 1

l DOCKET 50-370 DATE 12-15-87 0FERATING STATUS COMPLETED BY J. A. Reavis l

5 TELEPHONE 704/373-7567

1. Unit Name: Mc6UIRE 2
2. Reporting Period: NOVEMBER 1, 1987-t0VEMBER 30,1987
3. Licensed Thermal Power (MWt):

3411

4. Naseplate Rating (Gross MWe):

.1305t i Notes *N$slp~iate Rating 1

5. Design Electrital Rating (Net MWe):

1190 I (Bress MWe) calculated as 1

6. Maximus Dependable Capacity (Stoss MWe):

I 1450.000 MVA x.90 pcwer 1

. 7. Raximus Dependable Capacity (Net MWe):

1150 I factor per Page lii, I

8. If Changes Occur in Capacity Ratings (Items Wuster 3 Through 7) Since Last i NURE6-0020.

I Report. Give Reascns:

1

- t

)

_-....=_

..............= -

.9. Power Level To Which Restricted, if Any (Net MWe):

10. Reason for Restrictions, If any: _._._,

z..........._.

This Month Yr.-to-Date Cumulative

!!.HoursinReportingPeriod 720.0 0,016.0 32,990.0

12. Number Df Hours Reacter Was Critical.

690.8 6,312.9 23,711.9

13. Reactor Reserve Shutdown Hours

--0--

--0-- 14. Hours Generator On-Line 686.5 6,224.7 23,094.9

15. Unit Reserve Shutdown Heurs -

--0--

--0--

16. Gross Thersal Energy Generated (MWH) 2,091,145 20,090,345 74,790,746
17. Srcss Electrical Energy Benerated (MWH) 722,930 7,027,P00 26,217,190
18. Net Electrical Energy Senerated (MWH) 692,100 6,746,10B 25,109,533
19. Unit Service Factor 95.4 77.7 70.2
20. Unit Availability Fatter 95.4 77.7 70.2
21. Unit Capacity Factor (Using MDC Ntt) 83.6 73.2 65.6 22.- Unit Capacity Factor (Using DER Net) 81.5 71.3 64.7
23. Unit Forced Outage Rate 4.7 3.5 15.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

M

25. If Shut Down At End Of Report Feriod. Esticated Date of Startups._. _.,

I

26. Units In Test Status (Prior to Cossercial Operation):

Forecast Achieved l

l l

l.

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATIDN l.

1' l

l

4 a

g AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

.50-370 i

UNIT McGuire 2 DATE December 15,1987 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 1

1 i

MONTH N3VEMPER DAY-AVERAGE DAILY F0WER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)

(MWE-Net) l l

l 1

1151 17

!!32 2

1152 1B 1135 3

1152 19 1130 4

1152 20

!!32 1

1.

l 5

296 21 1132

- =.................

6 141 22 1133

=

7 934 23 1135 9

1149 24 700 9

1149 25 622 10 1148 26 623 11 1146 27 623

=.....-

12 1148 28 624 13 1150 29 640 14 1151 30 769 15 1153 16 1137

-m_____._.____U_._______m____. _ _ _ _ _ _ _ _

_E B R_3_

0RL V

E I

T E

A O

E t st -

7I 5

.)

I C

R S

N C

M N

- at rG 3U1 A4 T

N T

I I

I reoE 0 C_1G LL7 0

C E

M B

N P

B GaepR 2

E R

E E

R O

M R

ph eU 5_M_

ROR N

H U

I U

U t eSRN

(

RTU C

T T

P T

i r I

O C

B A

bPyt

.EEYE CNE R

Y P

T N

P T

rn i

OMT BN OR U

R M

N I

M S

h rt el NAA O

DI T

A U

E A

U E

x onvi

- NDDH NTT D

P M

R PM U

EfEEF

)

T EP ACN P

N R

U D

E Q

4 ET TE AE M

O RI R

RL E

(

KI EL E

V U

C EA T

R EB R

CN LE S

E P

E TP S

E TO OU PT U

R S

AE N

TT AR R

D -

M A

P R

WR I

AU WP E

O C

E R

D EO D

H m

C T

O ET R

H EL C

a AM F

EI A

E EO T

r WU FU E

' G FR A

mc DU D

C L

N T

P aSl 1

EC L

' R C

CA

' N S

r EA O

AI U

2H AO I

ccx FV H

' C N

' C

' C D

SiE t

S l l a N

aamr O

T d uuoe N

N X

U U

X U

2 onnt h I

T E

I X

R R

R R

2 h aaut

)

C 7

5 NE B

X T

T O

T 2

t MMAO U

8 OD R

X S

S T

S 2

e-(

D 9

PO U

X N

N O

N 2

M1 234

)

E 1

MC T

X I

I M

I 2

3 R

O

(

r C

R e

E b

E W

m S MD H

G H

E J

H 2

)

O e

4 Y EO H

H H

H H

2 I

P v

S TC

(

o l

D N_

N A

E S. T S

NT R N

EN O W

H CE PO

)

O T

I V EN n

D N

LE R i

T O

a U

M l

H T N p

S T

TD U WX x

)

R 3ED FH O/

3 E

T O

MH OS DR

(

t

(

I P

s N

E ee

)

U R

2 A

F B

B B

A F

rt RE 4S ON u

(

l r io N

3 a

O 9

F e S

c I

TR 6

t ngr AU 2

nanor RO enit UH mel a D

pt el a ninuuri ouif geme sqaeepd p

)

TYPE F

F F

S F

F 5

aEMRRO 1

e-(

RABCDE

)

2 5

6 6

7 6

4 4

(

2 2

1 E

1 1

1 1

1 1

1 d

e 2

T 1

1 1

1 1

1 1

A l

f D

7 7

7 7

7 7

7 d u o

8 8

8 8

8 G

8 ed 1

ce rh e

oc g

p P

p P

P p

FS a

7 NO P

2 3

4 5

6 7

FS

)

3 3

3 3

3 3

1

(

_2_7 snoL6 m

_ A3 R

WR E7 O

B noF(

1 a

_E 8 R_3 E

T G

0 S

I i 0R[

V E

O NR t st -

7I 5

.)

I C

M O

- at rG I

3U1 A_0 4

T N

LT reoE

- G(

C E

P OA GaepR I

0C2 7

E R

M OR ph eU 5_M_1_J_(

ROR U

CE t eSRN t

RTU P

N i r

(

i O

C RE bP yt b

EEYE CNE N

OG i

r ne i

OMT BN OR I

T h rt el h

NAA O

DI A

AE x onvi x

NDDH NTT R

T H

)

EfEEF E

)

T EP ACN D

ST 4

5 E T T

E AE

(

(

K I E L E

V R

RD C N L E S

E E

OE O U P T U

R T T TP D

M A

P AU AP O

C EO RI m)

C H

ER an E

NT ri

' G E

mca N

GW aSl 1

CA O

r p

2H OL c cx

' C LF SiE t

(

l l S

a 1

N

aam O

T d uun _

N X

R onnt I

T

)

E R

M h a a u

't C

7 5

NE O

B t MMAO U

8

(

OD T

T e-D 9

PO O

K

)

M1 234 E

MC M

C 3

1 R

O

(

r C

R e

i I

n E

b E

o W

m SMD J

A

)

i O

e 4

YEO H

H t

P v

STC a

(

L i

n o

D N

i N

m A

E a

S T

x S

N T R E

N E NO.

W H

C EPO s

e O

T I

VEN r

D N

L ER i

n T

O a

e

)

U M

IIII l

c n

H T N p

ni i

S T

TD UWX x

oL a

)

R 3 EOF HO/

3 E

i l

T O

(

MHO SDR

(

t t &

p P

II s

c x

I N

E

)

ee i g E

U R

2 U

A rt r n

(

REASON u

t i

)

(

r sner n l

i o eivoi N

5 a

R air a O

5 F e rt rl S

c yT aE p I

T R 6

t ngr r

x AU nanort rE RO enit oso(

UH mel at it D

pt el anar ninuurir e I

ouif g emeh

)

saaeepd pt 1

T YPE F

F aEMRROAOO

(

e-

)

RABCDEFGH 2

9 0

(

2 3

E 1

1 d

2 T

e 1

1 A

l d

D 7

7 d u 8

8 ed 2

cr i

rh oc P

FS 8

ND 8

3 F 5

(

l

l

.a DOCKET NO:

50-370 UNIT:

McGuire 2 DATE:

12/15/87 NARRATIVE

SUMMARY

Month: November, 1987 McGuire Unit 2 began the month of November operating at 100% full power.

The unit tripped off line at 0647 on 11/05 following a Feedwater Pump Turbine trip.

The unit returned to service at 0943 on 11/06, and following several startup and non-startup related power holds, the unit reached 50% power, where it operated from 1200 on 11/24 to 2021 on 11/29, per Dispatcher's request. The unit then returned to 98%, limited by Heater Drain Pump motor problems. The unit tripped off line at 1727 on 11/30 due to low cooling water flow to the Main Generator Stator. The unit then remained off line for the balance of the month.

1 i

I 1

i l

1 1

I l

[

I i

l MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 2 2.

Scheduled next refueling shutdown:

May, 1988 3.

Scheduled restart following refueling: August, 1988 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

409 8.

present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

projected date of last refueling which can be accommodated by present licensed capacity:

August, 2010 DUKE POWER COMPANY DATE: December 15, 1987 Name of

Contact:

J. A. Reavis phone:

704-373-7567 i

l McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT I

l 1.

Personnel Exposure i

For the month of October, 4 individuals exceeded 10 percent of their i

d allowable annual radiation dose limit with the highest dose being 1.580 rem, which represents approximately 13.2% of that person's allowable annual limit..

2.

The total station liquid release for October has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for October has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

______m______

.