TXX-6072, Interim Deficiency Rept CP-86-67 Re Design Calculations & Tests Used to Qualify Preoperational Piping Vibration Program.Initially Reported on 860926.All Test Results Evaluated to Verify Validity.Next Rept Expected by 861219

From kanterella
(Redirected from TXX-6072)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-67 Re Design Calculations & Tests Used to Qualify Preoperational Piping Vibration Program.Initially Reported on 860926.All Test Results Evaluated to Verify Validity.Next Rept Expected by 861219
ML20215M908
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/27/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-67, TXX-6072, NUDOCS 8611030444
Download: ML20215M908 (1)


Text

Log # TXX-6072 File # 10110 903.9 TEXAS UTILITIES GENERATING COMPANY BKYWAY TOWER . ese NORTH OLIVE STREEF. L.B. 88 . DALLAS. TEXAS 75351 October 27, 1986 EEll"Aff.YUnr T g ( 5 g i ] ,}, { N s

0CT 311986 Mr. Eric H. Johnson, Director j Division of Reactor Safety and Projects L_ ~'

U. S. Nuclear Regulatory Commission . - j 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 PRE-0PERATIONAL VIBRATIONAL TEST CRITERIA SDAR: CP-86-67 (INTERIM REPORT)

Dear Mr. Johnson:

On September 26, 1986, we verbally notified your Mr. Ian Barnes of a potential deficiency regarding the design calculations and tests used to qualify the Pre-operational Piping Vibration Program. This is an interim report of a potentially reportable item under the provisions of 10CFR50.55(e).

A TUGCo review of the CPSES criteria document " Pre-operational Vibration Test Program", Issue 1, June,1980, indicated that the mathematical formulas used to determine stress endurance limits, allowable deflection limits, and

, flexibility characteristics of certain piping systems may not have been accurate.

All vibration calculations and test results are being evaluated to verify the validity of the calculations in accordance with established TUGCo procedures.

We anticipate completing our review and verification process by December 3, 1986. Our next report will be submitted no later than December 19, 1986.

Very truly yours, 8611030444 e61027

[DR ADOCK 05000445 PDR W. G. Counsil BSD/amb c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Y s nn uro, or rrw noums n rcraic antem I O h

_-