ML20236Y184

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-341/87-44 on 870908-1023 & Notice of Violation.Response to Violation 341/87044-07 Should Address Issue of Multiple Surveillance Interface Between Operations & Other Onsite Organizations
ML20236Y184
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/09/1987
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20236Y185 List:
References
NUDOCS 8712110163
Download: ML20236Y184 (2)


See also: IR 05000341/1987044

Text

,

-

. . . . . ,

DEC 0 91987

Docket No. 50-341

The Detroit Edison Company

ATTN:

B. Ralph Sylvia

Group Vice President

Nuclear 0perations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to'the special' safety inspection conducted by Mr. D. S. Butler of

this office on September 8, through October 23, 1987, . of activities at the

Enrico Fermi Nuclear. Power. Plant, Unit 2. authorized by NRC Operating License

!

No. NPF-43 and to the' discussion of our findings with Mr. D. R. Gipson at

.the conclusic, of the inspection.

This special; inspection was conducted to

evaluate the' surveillance program for channel calibrations, logic system

functional tests, reactor protection system response times, and emergency

core cooling system response times.

The enclosed copy of our inspection report identifies areas-examined during

l

.

.the inspection.

Within.these areas, the inspection consisted of a selective

.

exami. nation of procedures and representative records, observations, and

I

interview!. with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice.

A written response

is required.

In your response'to violation 341/87044-07, please address the

issue of multiple surveillance interface between operations and other onsite

organizations.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of-

this letter, the enclosures, and your response to this letter will be placed

in the'NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

i

'

as' required by the Paperwork Reduction Act of 1980, PL 96-511.

!

8712110163 871209

DR

ADOCK 050

3 1

.

/8/

-

--

._

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

%

'

OEC001987

]

,

The Detroit Edison Company

2

We will gladly discuss any questions you have concerning this inspection.

i

i

Sincerely,

CRIGlHAL SIGHED BY GE0gan: g my

Geoffrey C. Wright, Chief

Operations Branch

Enclosures:

1.

Notice of Violation

i

2.

Inspection Report

!

No. 50-341/87044(DRS)

!

cc w/ enclosures:

'

Lewis P. Bregni, Licensing

P. A. Marquardt, Corporate

Legal Department

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public' Service Commission

Harry H. Voight, Esq.

Michigan Department of

Public Health

Monroe County Office of

Civil Preparedness

(

2

R

RIII

e.

RII

-

Butler /mnj

Phillips

Gree $mr

Wright

IR8

,

___,_mm_.____

_ _ _ _ _ _ _ _ . _ . - _ _ _ _ _ . . _ _ _ _ _ _ _