Amend 111 to License DPR-35,revising Tech Spec 4.5.A.3.d to Explicitly Specify LPCI Pump Performance Necessary to Comply W/Current LOCA Analysis
ML20236U774
Person / Time
Site: Pilgrim
(DPR-35-A-111)
Issue date: 11/30/1987
From: Fairtile M
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20236U776 List:
References
NUDOCS 8712030365
Download: ML20236U774 (4)


Text

I

@ Cac k,

' UNITED STATES j

+

g NUCLEAR REGULATORY COMMISSION 5

'j WASHINGTON, D. C. 20555 -

\\...../

j BOSTON EDISON COMPANY DOCKET NO. 50-293 PILGRIM NUCLEAR' POWER STATION' i

AMENDMENT TO FACILITY OPERATING LICENSE 1

l Amendment _No.111

.]

License No. DPR-35 j

j i

1.

The Nuclear Regulatory Commission (the Commission)'has found that:

A.

The application for amendment by Boston Edison Company (the licensee) l dated July 8, 1987, as supplemented on August 5, 1987 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;

]

B.

The facility will coerate in conformity with the application, the i

provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and i

safety of the public, and (ii) that such activities will be conducted 1

in compliance with the Commission's regulations; i

i D.

The issuance of this anendment will not.be inimical to the

-l common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Connission's regulations and all applicable requirements have been satisfied.

j 2.

Accordingly, the license is amended by changes to the Technical i

Specifications as indicated in the attachment to this license amendment, i

and paragraph 3.B of Facility Operating License No. DPR-35 is hereby 1

anended to read as follows:

)

i j

I 8712030365 871130 DR ADOCK 050002 3

y 4

l

~!

(2) Technical Specifications I

The -Technical Specifications contained in Appendix A, as revised-J throuch Anendment No.111, are hereby incorporated in' the license.

-l The licensee shall operate._the facility in accordance with'the

{

-Technical Specifications.

j 3.

This license amendment is effective 30 days after the date of issuance.

FOR THE NUCLEAR REGULATORY Com ISSION j

j Q s k h 5ttS itE(p fiorton B. Fairtile,.Actina Director Project Directorate I-3 1

Division of Reactor Projects I/II 1

Attachment:

Changes to the Technical Specifications Date of Issuance:

November 30, 1987 i

i u

y 1

J

'I

}

.l ATTACHMENT TO LICENSE AMEN 0 MENT NO. lli

/

l FACILITY OPERATING LICENSE NO. DPR-35 DOCKET NO. 50-293 Replace the following pages of the Appcndix A Technical Specifications with the enclosed pages.

The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.- The corresponding overleaf pages are provided to maintain document _ completeness.

Remnve Pages Insert Pages 104 104-1 l

1 i

I l

4 i

'l I

LIPfTING CONDITf0N FOR OPERATf0N SURVEILLANCE REQUIREMENT 3.5.A Core Sorav and LPCI Subsystem 3 4.5.A Core Sotav and LPCI Subsystems (cont'd)

(cont'd)

Check Once/ day.

Calibrate Once/3 months Test Once/3 months 2.

From and after the date that one 2.

When it is determined that one of the core spray subsystems is core spray subsystem is-made or found to be inoperable inoperable, the operable core-for any reason, continued reactor spray subsystem, the LPCI operation-is permissible during subsystem and the diesel the succeeding seven days, generators shall be demonstrated provided that during such seven to be operable immediately.

The days all active components of the operable core spray subsystem-other core spray subsystem and shall be demonstrated to be active components of the LPCI operable daily thereafter.

subsystem and the diesel generators are operable.

3.

The LPCI Subsystems shall be 3.

LPCI Subsystem Testing shall be as-operable whenever irradiated fuel follows:

is in the reactor vessel, and prior to reactor startup from a

a. Simulated Once/ Operating Cold Condition, except as Automatic Cycle specified in 3.5. A.4, 3.5. A.5 and Actuation 3.5.F.5.

Test

b. Pump Once/ month j

Operability

c. Motor Operated Once/ Month and valve Once/ cycle from operability the Alternate Shutdown Panel
d. Pump Flow Once/3 months.

O Each LPCI pump shall pump 4800 j

gpm at a head across the pump of at least 380 ft.

Amendment No. M, 67, 111 104 f