ML20236T818
| ML20236T818 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/27/1987 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20236T820 | List: |
| References | |
| NUDOCS 8712020109 | |
| Download: ML20236T818 (3) | |
Text
_ _ - _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ - _ _ _ _ _ _
l jf# "*%
UNITED STATES NUCLEAR REGULATORY COMMISSION f
hf
' REGloN IV -
sf 611 RYAN PLAZA DRIVE, SUITE 1000
,8 ARLINGTON, TEXAS 76011 NOT 271987 In Reply Refer To:
Dockets: 50-458/85-27 50-499/85-24 50-498/85-28 50-499/85-25 Houston Lighting & Power Company ATTN:
J. H. Goldberg, Group Vice President, Nuclear P. O. Box 1700 Houston, Texas 77001 l
Gentlemen:
This refers to the investigations conducted by.the NRC Office'of Investigations, Region.IV Field Office of activities authorized by Construction Permits CPPR-128 and CPPR-129 for the South Texas Project.
The investigations were initiated to determine (a) whether a former EBASCO quality control calibration laboratory supervisor and coworkers had been intimidated by management and had subsequently falsified records and (b) whether a former EBASCO quality control inspector had been harassed.
Synopses of these investigations are enclosed.
The NRC staff has reviewed the investigatory findings and no violations or deviations were identified.
Should you have any questions concerning these-investigations, we will be pleased to discuss them with you.
Sincerely, I
(
W L. J ICallan, Director Divisdon of Reactor Projects
Enclosures:
See Attached 1
)
8712O20109 371127 ADOCK050g4y8 DR
'I e
________.___.____________..___________________m__=_______.m.
.m.
m
______m
1 Houston Lighting & Power, Co. 1 1.
NRC Investigative Report Title Page and Synopsis,
" South Texas Project: Alleged Intimidation of a l
QC Supervisor and Falsification of Calibration Laboratory Records," 01 Case No. 4-85-015, J
August 21, 1987 2.
NRC Investigative Report Title Page and Synopsis,
)
" South Texas Project: Alleged Harassment and Intimidation of a QC Inspector," 01 Case No. 4-85-018, August 21, 1987 cc:
Houston Lighting & Power Company ATTN:
M. Wisenberg, Manager Nuclear Licensing P.O. Box 1700 Houston, Texas 77001 Houston Lighting & Power Company ATTN: Gerald E. Vaughn, Vice President Nuclear Operations P.O. Box 1700 Houston, Texas 77001 Central Power & Light Company ATTN:
R. L. Range /R. P. Verret P.O. Box 2121 Corpus Christi, Texas 78403 i
City Public Service Board ATTN:
R. J. Costello/M. T. Hardt P.O. Box 1771 San Antonio, Texas 78296
{
l City of Austin
(
ATTN:
M. B. Lee /J. E. Malaski P.O. Box 1088 Austin, Texas 78767-8814 Texas Radiation Control Program Director i
i
.l
- ,1 I NOV 2 T Ig87 Houston Lighting & Power, Co. -
~2TN$$IM5I[(IEdi3 bec to DMB (IE06 bec to DMB (IE35 bcc distrib. by RIV:
- RRI-0PS R. D. Martin, RA
- RRI-CONST.
- SectionChief(DRP/D)
RPSB-DRSS
- MIS System
- RIV File-
- Lisa Shea, RM/ALF
- RSTS Operator R. Bachmann, 0GC
- H. Bundy
- P. Kadambi,: NRR Project Manager
- R. Taylor
- TSS
- R. Hall DRS
- D. Powers H. Scott M. Emerson
- w/766 RIV:E0 DR D:DRP DPowers:vsg LCo stable LJCallan 11/19/87
.11/14/87
'11/g87 1//
'-----.---a
~-a u---.-suaa.a.u_
_