Rev 3 to Procedure 3.M.3-6, Insp & Overhaul of 480 Volt Load Ctr BreakersML20236N787 |
Person / Time |
---|
Site: |
Pilgrim |
---|
Issue date: |
06/05/1981 |
---|
From: |
BOSTON EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20236N770 |
List: |
---|
References |
---|
FOIA-87-644 3.M.3-6, NUDOCS 8711170009 |
Download: ML20236N787 (5) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20092C4331995-09-0101 September 1995 Startup Test Rept for Pilgrim Nuclear Power Station Cycle 11 ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078N8421994-11-18018 November 1994 Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test 1999-06-16
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20127N2711992-11-24024 November 1992 Rev 4 to Pilgrim Nuclear Power Station Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20128M7701992-03-31031 March 1992 Amend 92-01 to Second Ten Year ISI Program ML20094P5411992-03-19019 March 1992 Rev 23 to Procedure 5.4.6, Primary Containment Venting & Purging Under Emergency Conditions, Revising Coversheet & Attachment 1,Sheet 3 of 5,page 8 of 20 ML20058E5281990-10-25025 October 1990 Rev 1 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20005F0791989-12-13013 December 1989 Rev 0 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program. ML20247N3611989-07-31031 July 1989 Rev 2 to Dcrdr Program Plan ML20245D6551989-04-21021 April 1989 Power Ascension Program Resumption Plan ML20235R3441988-12-28028 December 1988 Rev 26 to, Pilgrim Nuclear Power Station Secondary Containment Leak Rate Test ML20235R4671988-12-22022 December 1988 Rev 25 to, Pilgrim Nuclear Power Station Secondary Containment Leak Rate Test ML20155C0141988-09-28028 September 1988 Rev 3 to Appendices to Restart Plan ML20155F9041988-09-0707 September 1988 Rev 3 to Pilgrim Nuclear Power Station Plant-Specific Technical Guidelines for Emergency Operating Procedures ML20153H6481988-08-31031 August 1988 Ascension Program ML20235R3801988-08-0909 August 1988 Special Post-Startup Training Program to Satisfy Requirements of NUREG-1021,Section ES-109,Parts B.2.e & B.2.f for Reactor Operator Licensed Personnel & Parts D.2.e & D.2.f for Senior Reactor .. ML20150C0271988-05-26026 May 1988 Rev 2 to Vol 2 to Apps to Restart Plan ML20151F9481988-04-0606 April 1988 Rev 2 to Emergency Operating Procedure 1.3.4-13, Emergency Operating Procedures Verification Program ML20151C8111988-04-0606 April 1988 Rev 3 to Emergency Operating Procedure 1.3.4-10, Writers Guide for Emergency Operating Procedures ML20151F9681988-04-0606 April 1988 Rev 2 to Emergency Operating Procedure 1.2.4-14, Emergency Operating Procedure Validation Program ML20151C8151988-03-28028 March 1988 Emergency Operating Procedures Training Program Summary Description ML20153B1061988-03-14014 March 1988 Rev 1B to Inservice Testing Program for Pumps & Valves, Pilgrim Nuclear Power Station ML20236T2171987-11-20020 November 1987 Rev 3 to Pilgrim Nuclear Power Station Plant-Specific Technical Guidelines for Emergency Operating Procedures ML20236T2241987-11-20020 November 1987 Rev 3 to Apps to Pilgrim Nuclear Power Plant-Specific Technical Guidelines ML20236T2361987-11-20020 November 1987 Collection of Plant Operating Procedures Utilized to Develop,Process & Issue Plant-Specific Emergency Operating Procedures ML20236N7751987-11-12012 November 1987 Rev 1 to Procedure 3.M.1-1, Preventive Maint ML20236F0201987-10-26026 October 1987 Rev 1 to Vol 2 of Pilgrim Nuclear Power Station Apps to Restart Plan ML20155F9171987-10-16016 October 1987 Rev 1 to Procedure 1.3.4-13, Emergency Operating Procedure Verification Program ML20155F9111987-10-15015 October 1987 Rev 2 to Procedure 1.3.4-10, Writers Guide for Emergency Operating Procedures ML20235X2461987-10-15015 October 1987 Power Ascension Program ML20195H6341987-09-22022 September 1987 Rev 23 to Procedure 8.7.3, Secondary Containment Leak Rate Test ML20238E8311987-09-0101 September 1987 Revised Nuclear Operations Dept Procedures,Including Rev 5 to Procedure 5.7.4.1.1, Post-Accident Sampling Sys,Small Vol Liquid Sample from Jet Pump Flow Sensing Line & Rev 6 to Procedure 5.7.4.1.2, ...Undiluted Liquid Sample.. ML20236G4071987-07-30030 July 1987 Vol 1 to Pilgrim Nuclear Power Station Restart Plan. Rev 0 to Vol 2,appendices,encl ML20236F9531987-07-28028 July 1987 Matl Condition Improvement Action Plan ML20155F9201987-07-10010 July 1987 Rev 0 to Procedure 1.3.4-14, Emergency Operating Procedure Validation Program ML20204F7431986-06-16016 June 1986 Rev 1 to Temporary Procedure Tp 86-85, RHR Intersys Leakage Assessment & Controlled Leakoff ML20204F7301986-06-10010 June 1986 Rev 11 to Procedure 2.3.2.1, Panel Procedures Panel 903 Left ML20204F7481986-06-10010 June 1986 Rev 0 to Temporary Procedure Tp 86-84, RHR Discharge Piping Venting Procedure ML20137M4811985-08-21021 August 1985 Rev 1 to Procedure 5.7.5, Estimating Core Damage ML20138R4501985-07-19019 July 1985 Rev 0 to Procedure 1.3.4-10, Writers Guide for Emergency Operating Procedures ML20128N9341985-03-0606 March 1985 Rev 0 to Procedure 5.7.5, Estimating Core Damage ML20101S7121984-12-13013 December 1984 Rev 11 to Procedure 2.1.12, Daily Diesel Generator Surveillance ML20101S7201984-12-12012 December 1984 Rev 15 to Procedure 8.9.1, Manually Start & Load Each Diesel Generator Once Per Month 1999-03-23
[Table view] |
Text
_ . _ ,
i.
/ .
a6
,e e ,
4 3"
! hiison covwu ,
NUCLEAR' OPERATIONS DEPARTMENT FILCRIM NUC$. EAR POWER STATION Procedure No. 3.M.3-6 INSPECTION AND OVERHAUL OF 480V LOAD CENTER BREAKERS C :; - -
\ is
- Q v Lis[of Effective Pages
!.6,g r 1
3 .M .3-6-1 Rev. 3 3.M/3-642 Rev. 2 -
!"ll'4 ** ' 7 '.-
/16'/
2)}g Y i l)c ") as J cm e t' I
- 3. A3 0 "6 3 Rev. 3
'f&.bjf"' cc// tj, u,k w r'
. .? C h - !
, l Att"cchde'Et M M %
sh., /m + , L. /c<f - n,y ce +, e -
?
}3$$NYv.2 r
1
- .3 o,
j s , N: ,
j i i D';
s{ l 5..
a 4; d,' l l
'ic - !
w..
.' Approved i
_ -;( L.Pilg/imStatpnManager j i.
'h Date flZ lP/ '
J~ SEh? '
, 9, 9711170009 071112 3.M.3-6-1 Rev' . 3' .
- -/ PDR FOIA SORCIB7-644 PDR jjg
-. . . ~ .. . . , . . __
mu .a w.
e o
. w ead e.
.A k j PURPOSE The intent here is to give direction to the maintenance personnel for inspecting and/or overhauling of 480V L. C. Breakers. , 1 DISCUSSION Inspection and/or, overhaul will be accomplished in accordance with G.'E.
Hanual, GEK-7303, GEK-7302, GEI-50299, GEP-4149 ' and GEF-4150.
Information such as date of inspection or overhaul, breaker operation and component replacement will be entered'on the appropriate Visirec'ord Card. -
Proper isolation procedure will be followed and all electrical operation tests will be made at the breaker test station. ,
Following inspection and/or overhaul, and electrical operation tests, the breaker insulation level will be checked, utilizing the motorized ,
The results of this test vill be entered on the visirecord Card.
meggar. - l The breakers which will be covered Fy this procedure are as follows:
l
.$o AK-25 AK-50
% AK-15 A.52-101 A.52-106 A.52-103 gE
-7 ~ {a Q.z...* .
~" : 'J ,. .52-206 B.52-104 B.52-102 7 *t~ . C.52-201 g C.52-303 ,C .52-105 Y .: .c ,
D.52-203 D.52-202 i/ f;52-304 N
- 1 *
..52-305 E.52-204 E.52-301 403 F.52-205 F.52-401 1 2-405 G.52-302 '
G.52-500 -
- i t. . .
a i ,5' ~
t 4
~
.1
,- ( Yb Gw) 9
'ir
- 2. - .
- c-
,~,
a y.s.,
W
' ' _ - ~ _
a
.w.. c a. n. - - ~ ~ - -
,, .c I
t
'1 .
AK-25 AK-50 l
, AK-15 !
r 52-501 H.52-306 H.
, .m H.52-406
(
V 1.52-506 I.52-308 .
I.52-601,
'52-602' J.52-605 J.52-310 J. , -l l
K.52-402 K.52-701 j K.52-704 l L.52-404 L.52-801 L.52-705 ,
M.52-408 )
N.52-409 ,
- 0.52-410 I s
i P.52-503 ,
l 1 l 52-304 >l Q.
l
' R.52-603 f S.52-604 l l
T.52-606 ;
1
. U.52-702 ,
s uj 4 l
V.52-703 l
W.52-507 s X.52-803 i
., \
RR t 52-804 7-g;g,,. Y.
'm ic+;:.
' ( T+T Z.52-805
.';h- y@.
5 V a
1
~ k*g$d.. W AA.52-806 si g REFERENCES
.?.:o f ;.
U . TSAR' iSection 8
'M dEKh~"7303 1 "G 7302
.: EI 0299 i,T . 149 4
y [d5)-- :- -~g :!4150 PRECAUTIONS S k
{I r Safety Practice o
- 1.c
'J. -
- J:
..g7 gc y 1; : j.;
u- p::e... .pg
- y..
- y 4
- ,. . .. ..
. b;+.
,7..y
.Q;f,; I
- _ 17..c .. ..-
. , .~ ... . . ' . .'
- ' .g- iQ' 3.M.3-6-3 Rev. 3
,,; y .. ,
4 &
,1 h PROCEDURE s
to commencement.
A. Request pernission via WRP from Nuclear W. E. prior station.
B. Isolate via safety tags and remove the breaker to the test I '
C. Insure that the stored energy springs have been discharged. ,
D. Inspect'and/or overhaul the breaker in accordance with the applicable G.E. Manual.
E. Af ter reassembly of the breaker, test'to insure proper ciectrical operation, i
F. Make insulation level tests.
' )
G: Insert data in Visirecord File. /
l B. Release the breaker for operation to the' Watch Engineer and sign all safety tags,and the Work Request Permit.
e ?
" APPENDIX C\ . ,~ 9J , ' A . Check List No. 3.M.3-6A
>f gpe; , , , ,
tgj?.9' - >
< l
- n: ~ ,e. :n.
F , ,.,W'i.' ) 1
- .% i?. ) e a
- L <
- . .,
c:., .
7 yY. ?&N . .
.L +, ~
.v 'r
- 4.. f s.
'E. f' ' .
,p1
.M .?
<:;_j li-, ,
vP.
[ . . 'e :.
<. w. *
.. s.; - .
_ s
's
- (_. .
- 5'. . ,
e.'
y..
g,
(
- .h- I
. . l. ,
L.-
. :.~i '5.?.. . '
3.M.3-6-4 Rev. 2
. 3~ ,$ ,
'* . ______ . ~. h- :
~p umsm&. ,; aua F_
s n& c.w.,
9,..erww e** " "'
3,M.3-6.A
..e
. . w.4#. ..esa..ucm.m;a ,,,.,, ,, 3,,,,,,,
, i DATE: .
,0 6
g, TIME STARTED: - .
TItfE FINISHED: _
t STEP ACCEPTANCE f CRITEalA RE'SULTS AND !
/ ! INITIALS '
Request breaker isolation via a 1
1A W ' NOTES
_ RP throuch the W.E. i
~ ~ ~ ~
_1_B Remove station the breaker to the test I
. 2 eInsure.that the charging springs i
\
are discharged l
%_ 3 Removeand Inspect & irisoect take upthe on Arc all Chutes 4 i rnech anica l . conn ec tions i
,% f Inspect & clean arcing c
. (replace where necessary)ontacts ! ~
6_
Lubricate all moving parts __
( 7 Inspect all control wiring 8 > In accor, dance with G.E. Manual _
check 6 nake ad just. where rea. I{ '
- e. Thoroughly blow out or vacuum 1
{ Q)* all components of breaker j Lubricate the main contacts
./10 _
1 with cenducting grease
!_ 11 Reassemble items disassembled i d' urine' the above steps l
, Electrically operate the breaker 1 . '
,2' - - - -- from the test '
station to insure
. ~
l 13.M.Mr . . . ,. m ke insulation level' test uti- _
lizing the mojorized raencar on . . .
0.hh$
~
the 500V setting
, 27g3M.
~14 W s'T: _ Compute the Polarization Index
- 9V ' via the 1 and 10 min, - _
,115 .ig)'dW@4 Consult with the Maint. readings _
Superv.
,.gypyli
'"161531T. ,Qubicle
- i.1M S Return the breaker to WontheresultsoftheInsl.Tesh
~ ~
, 17 N ,Wie signing -
of the WRP. Release the breaker for service .
'e M. ACCEPT
._-.d.--. .--
rtE1-1=CTR+ICA,I; n_ u, ,* SUPERV. R'EMARIG su g IWAfCHUtNGINEER
.y .
. M- 3., ;
u .y: : ,
.:;. Q .7 c
~~7'&L $$,;15N . '
~(Q ,
r:r3 M ~ - RANG y;. ~
- J .. ,
.,4 j,7::.' ..n,i u .
,.).ryi s
l
_ _ _ _ _ - _ '