Requests Description of How Proposed Dedicated Shutdown Capability for 4,160 Volt Switchgear Room Meets Each Requirement of 10CFR50,App R,Section Iii.L,In Order to Complete Review of
ML20236N169
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/10/1987
From: Wagner D
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
TAC-60839, TAC-60840, NUDOCS 8711160049
Download: ML20236N169 (2)


Text

sNovember 10, 1987 ,

, i N

. Docket Nos. 50-266 DISTRIBUTION:

and 50-301 . Docket ITies s OGC-Bethesda NRC PDR' ' " Edordan-Local PDR JPartlow i PDIII-3 r/f ACRS(10)

Mr. C. W. Fay, Vice President DWigginton PDIII-3 Gray File '

Nuclear Power Department GHolaban DKubicki Wisconsin Electric Power Company PKreutzer JCraig 231 W. Michigan Street, Room 308 DWagner Milwa e. Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

FIRE PROTECTION REQUIREMENTS - 4160 V0LT SWITCHGEAR ROOM (TAC 60839 AND 60840)

The staff is reviewing your April 15, 1987 letter which provided detailed-infor-  !

i mation regarding your proposed dedicated shutdown. system independent of the. J 4160 volt switchgear rooms. In order to complete our review, we request that you describe how the proposed dedicated shutdown capability for the 4160 volt switch-gear room meets each requirement of 10 CFR Part 50, Appendix R, Section III.L.

Include drawings as appropriate to demonstrate compliance, and consider staff guidance on alternate / dedicated shutdown capability discussed in previously issued Generic Letters (e.g. GL 86-10).

Pled e contact us if you have any questions concerning this request.

The information requested in this letter affects fewer than 10 respondents; l therefore OMB clearance is not required under Pub. L.96-511.

Sincerely, l l

~0dginaf Siened By:  !

J David H. Vagner, Project Manager j Project Directorate III-3 Division of. Reactor Projects i

Enclosure:

As stated t cc: See next page )

l i

l i

1 Office: d' 4 LA/PDIII-3 kJ PMTFblII-3 SPLB y .

% )

PD/PDIII-3 l

i Surname: PKreutzer D agner/tg bick hdC ig D ig inton l Date:

JO/g/87 A/ 9/87 c7/87 10/g/87 1 /t /87 8711160049 871110 l PDR ADOCK 05000266 F PDR E_- _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _

j

o Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 >

cc:

  • Mr. Bruce Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chairman -

Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241

.