0CAN078706, Forwards Rev 9 to QA Manual - Operations
| ML20236E399 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/22/1987 |
| From: | Enos J ARKANSAS POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20236E402 | List: |
| References | |
| 0CAN078706, CAN78706, NUDOCS 8707310357 | |
| Download: ML20236E399 (2) | |
Text
r T
i 10CFR50.71 ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 [501) 3774000 July 22, 1987 BCAN078706 COPY N1 DOCUMENT LONTROL DESK US NRC tMSHDKiiDN. DC 2M55
SUBJECT:
Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-268 License Nos. DPR-51 and NPF-6 Quality Assurance Manual - Operations, Revision 9 Gentlemen:
In accordance with 10CFR50.71, attached is your copy of Revision 9 to the Quality Assurance Manual - Operations (QAMO).
The changes made in Revision 9 to the sub,iect manual nave been evaluated as required by i
10CFR50.54(a) to determine if quality commitments have been reduced.
{
Results of our evaluation have determined that these changes do not reduce j
any commitments in the Quality Program description previously accepted by the NRC.
Revision 9 pertains primarily to organizational changes and changes to reflect our current practices in implementing the requirements of l
1 this manual.
The Record of Revisions section of the manual identifies all changes implemented by this Revision.
Please replace the affected pages in your controlled copy of the QAM0 l
according to the instructions provided and indicate receipt of this revision by signing below and returning this transmittal letter to Ms. Sally Benson, Nuclear Engineering and Licensing Section, P.O. Box 551, Little Rock, AR 72203.
l l
Very truly yours, t
J. Ted Enos, Manager Nuclear Engineering and Licensing JTE:SAB:lw Attachments l
l Cc, y No.
Signature Date h
8707310357 870722 DR ADDCK 05000313 PDR vevoca vioote souTs uviuties sysTeu
RECORD OF REVISIONS l
Repiace the following pages of the Quality Assurar.ce Manual - Operations with the attached pages.
The revised pages are identified by revision number and vertical lines indicating the areas (s) of change.
Insert the j
approval page for Revision 9 in your QAMO in front of the approval pages for Revisions 8, 7, and 6.
Remove pending changes NEL-116-57 dated 11/26/86, NQ-86-00154 dated i
11/10/86 and associated pages (2-8, 7-1, 7-2, 16-1, 16-2 and Form 1000.06E).
I Remove Page(s)
Insert Page(s)
Approval Signature, Rev. 9 1 thru 6 1 thru 8 TC-1 thru TC-8 TC-1 thru TC-8 A-1 and A-2 A-1 and A-2 B-5 B-5 C-1 thru C-8 C-1 thru C-8 C-10 C-10 1-1 thr. 1-23 1-1 thru 1-23 2-1 thru 2-9 2-1 thru 2-9 3-1 3-1 3-4 and 3-5 3-4 and 3-5 4-1 4-1 4-3 4-3 5-2 thru 5-4 5-2 thru 5-4 1
6-2 6-2 7-2 7-2 7-5 7-5 10-3 10-3.
10-5 and 10-6 10-5 and 10-6 j
11-3 11-3 13-2 13-2 13-4 13-4 15-2 15-2 16-1 thru 16-4 16-1 thru 16-4 18-6 18-6 F-1 thru F-7 F-1 thru F-7 T2-1 T2-1 T3-1 and T3-2 T3-1 and T3-2 AA-2 and AA-3 AA-2 and AA-3 AB-3 thru AB-12 AB-3 thru AB-12 l
l
-