Forwards Insp Repts 50-324/89-02 & 50-325/89-02 on 890101-31 & Notice of Violation
ML20235W196
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/27/1989
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20235W199 List:
References
NUDOCS 8903100543
Download: ML20235W196 (2)


See also: IR 05000324/1989002

Text

-

e

i

,

,

/

d

.

,

,

.

FEB 2 71983

Docket No. 50-325 and 50-324

License No. DPR-71 and DPR-62

~

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-325/89-02 AND 50-324/89-02)

'This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

William H. Ruland on ilanuary 1-31, 1989.

The inspection included a review of

activities authorized for your Brunswick facility.

At the conclusion of the

inspection, the findings were discussed viith those members of your staff

identified in the enclosed inspection r6; ort.

Areas exainined during the ir.spection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

Violation 50-325,324/89-02-01, references to pertinent

requirements, and elements to be included in your response are described in the

enclosed Notice of Violation. A second violation (50-325,324/89-02-02) is also

identified in the enclosed Inspection Report, but is not cited; therefore, no

response to this violation is required

Your attention is invited to the unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

In accordance with Sectica 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Room.

.

8903100543 % 2M 24-

POR

ADOCK

PNV

O

\\ \\

IEcl

_ _ _ - _ .

_ _ _ _ _ _ _ _ .

_ _ -

t

t

.

,

Carolina Power and Light Company

2

fEB 2 71999

l

Should you have any questions concerning this letter, please contact us.

Sincerely,

-

,-v

gn_,pf.

g ; y ;a t4. 'f M 2 LI

David M. Vercelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cc w/encls:

R. B. Starkey, Project Manager

Brunswick Nuclear Project

J. L. Harness, Plant General Manager

State of North Carolina

bec w/encls:

NRC Resident Inspector

DRS Technical Assistant

{ocu{egontrolDesk

l

RII

RI

l

R arr

tj

H ante

02/JrJ/89

02/s1/89

_

._________-________________-___m