Docket Nos.: 50-424 and 50-425 JUL 14 887 Mr. James P. O'Reilly Senior Vice President - Nuclear Operations Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302
Dear Mr. O'Reilly:
Subject:
Staff Review of Vogtle Units 1 and 2 Offsite Dose Calculation Manual, Revision 3 By letter dated April 28, 1987, Georgia Power Company (GPC) submitted Revision 3 to the Vogtle Units 1 and 2 Offsite Dose Calculation Manual (ODCM). The staff has reviewed this submittal to ensure that changes proposed and committed to GPC letters dated December 16, 1986, and January 8,1987, have been incorporated as requested in NRC letter dated January 13, 1987. Based on our review, we conclude that GPC has satisfactorily included the required information. Most of the other minor changes in Revision 3 are also improvements. However, in equa-tions 38 and 39, an upper-case sigma has been omitted prior to the "zk" subscript.
With this minor correction, we conclude that Revision 3 to the ODCM is acceptable.
GPC shoald initiate this correction to the ODCM is a timely menner.
Sincerely, h
N Melanie A. Miller, Project Manager Project Directorate II-3 Division of Reactor Projects, I/II cc: See next page Distribution:
r4400cket N ^
NRC PDR Local PDR PRC System PD#23 Peading MDuncan MMiller BJYoungblood Readir.g OGC-Bethesda i
ACRS (10) i JPartlow l
EJordan SVarga/Glainas JSwift n[
FCongel s
PB 3@RP-I/II PD II-3/DRP-I/II PD#II-5/DRP-I/IT MM rWiac
/sHDuncan BJYoungblood 07 87
(~ 07/ /^j/87 07/
/87 E872n!3'M b P
j
Mr. J. P. O'Reilly Georgia Power Company Vogtle Electric Generating Plant l
cc:
Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Commission Georgia Power Conipany P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /
Suite 225 Southern Company Services, Inc.
32 Peachtree Street, N.W.
P.O. Box 2625 Atlanta, Georgia 30303 3
)
i Bimingham, Alabama 35202 l
James E. Joiner Mr. Paul D. Rice Troutman, Sanders, Lockerman, Vice President & Project General Manager
& Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.
Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.
P.O. Box 2625 Carol Stangler Bimingham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr.
Atlanta, Georgia 30307 l
Bruce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.
l Washington, D. C.
20037 l
Mr. G. Bockhold, Jr.
Vogtle Plant Manager Georgia Power Compeny i
l Route 2, Box 299-A Waynesboro, Georgia 30830 i
Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Conway 4l Senior Vice President and Project Director Georgia Power Company Rt. 2, P. O. Box 299A Waynesboro, Georgia 30830 w