. m
,
APR 28 1FJ
Docket No. 50-424
License No. NPF-68
GeorgiyPower Company
ATTN:/ Mr. James P. O'Reilly
Senior Vice President-Nuclear
Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT N0. 50-424/86-105
On August 11, 1986, through August 15, 1986, the NRC performed an inspection at
the Vogtle job site of Readiness Review Module 22, " Independent Design Review"
(IDR).
The objective of that inspection was to ensure that the IDR's results
and conclusions were technically acceptable as well as to verify that the
resulting corrective actions were appropriate.
Also, IDR open items from
previous inspection reports were reviewed.
The results of this inspection are
documented in the attached inspection report and were discussed with your staff
at our inspection exit meeting.
During this inspection all previous IDR inspection report open items were
closed. NRC's assessment of the validity of the results and conclusions of the
IDR and the appropriateness of corrective actions will be addressed by the
evaluation report that is being prepared for Module 22.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8705040
f h 24
A
Virgil L.
Ownlee, Chief
8
Reactor P jects Branch 2
Division of Reactor Projects
Enclosure:
NRC Inspection Report
(cc w/ encl: See page 2)
1.2oI
,
,
... . ._. .e,
-
Georgia Power Company
2
g g ; jgy
icc w/ enc 1:
GR. E.. Conway, Senior Vice President &
-Project Director
p C. Whitney,~ General Manager Project
Support
d ' P. D. Rice, Vice President, Project
Engineering
/iR.H.Pinson,VicePresident, Project
Construction
/C.W. Hayes,VogtleQuality
Assurance Manager
DIG.B.Bockhold,GeneralManager,
Nuclear Operations
/ L. Gucwa, Manager, Nuclear Safety
and Licensing
,J. A. Bailey, Project Licensing
Manager
/3B.W. Churchill,Esq.,Shaw,
Pittman, Potts and Trowbridge
/ lJ. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
/lJ.G.Ledbetter, Commissioner,
Department of Human Resources
/,C. H. Badger, Office of Planning
and Budget
YID.Kirkland,III, Counsel,
Office of the Consumer's Utility
Council
V D. Feig, Georgians Against
Nuclear Energy
/sM.B.Margulies,Esq., Chairman,
Atomic Safety and Licensing Board
Panel
dlDr.O.H. Paris,AdministrativeJudge
Atomic Safety and Licensing Board
Panel
/ f G. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
(bec w/ encl: See page 3)
,
I
__,-
,.
._=
-_
__
__ _
,
,-
,
,
. , - .
,
. .-,. . . .x.
Georgia Power Company
3
"
E pcc w/ enc 1:
'
,fl.M. Hill,IE
'J. Miller,NRR
JM-
. Brach, EDO-
M. Sinkule, RII
'E. Christnot, RII
yNRCResidentInspector
Document Control Desk
State of Georgia
s.
.'
RII
RII
.4/b
/Ak
EChristnot
MSinkule
4/2]]87
4/Jy87
<-.