Forwards Insp Rept 50-424/86-105 on 860811-15.No Violations Noted.Nrc Assessment of Validity of Results & Conclusions of Independent Design Review & Corrective Actions Will Be Addressed by Evaluation Rept Being Prepared for Module 22
ML20209H784
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/28/1987
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20209H789 List:
References
NUDOCS 8705040121
Download: ML20209H784 (3)


See also: IR 05000424/1986105

Text

.

.

.. -',

. m ,

APR 28 1FJ

Docket No. 50-424

License No. NPF-68

GeorgiyPower Company

ATTN:/ Mr. James P. O'Reilly

Senior Vice President-Nuclear

Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT N0. 50-424/86-105

On August 11, 1986, through August 15, 1986, the NRC performed an inspection at

the Vogtle job site of Readiness Review Module 22, " Independent Design Review"

(IDR). The objective of that inspection was to ensure that the IDR's results

and conclusions were technically acceptable as well as to verify that the

resulting corrective actions were appropriate. Also, IDR open items from

previous inspection reports were reviewed. The results of this inspection are

documented in the attached inspection report and were discussed with your staff

at our inspection exit meeting.

During this inspection all previous IDR inspection report open items were

closed. NRC's assessment of the validity of the results and conclusions of the

IDR and the appropriateness of corrective actions will be addressed by the

evaluation report that is being prepared for Module 22.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

8705040

PM A

f h PM

24 Virgil L. Ownlee, Chief

8 Reactor P jects Branch 2

Division of Reactor Projects

Enclosure:

NRC Inspection Report

(cc w/ encl: See page 2)

1.2oI

,

, *

... . ._. .e,

-

Georgia Power Company 2 g g ; jgy

icc w/ enc 1:

E.. Conway, Senior Vice President &

GR.-Project Director

p C. Whitney,~

Support

General Manager Project

d ' P. D. Rice, Vice President, Project

Engineering

/iR.H.Pinson,VicePresident, Project

Construction

/C.W. Hayes,VogtleQuality

Assurance Manager

DIG.B.Bockhold,GeneralManager,

Nuclear Operations

/ L. Gucwa, Manager, Nuclear Safety

and Licensing

,J. A. Bailey, Project Licensing

Manager

/3B.W. Churchill,Esq.,Shaw,

Pittman, Potts and Trowbridge

/ lJ. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

/lJ.G.Ledbetter, Commissioner,

Department of Human Resources

/,C. H. Badger, Office of Planning

and Budget

YID.Kirkland,III, Counsel,

Office of the Consumer's Utility

Council

V D. Feig, Georgians Against

Nuclear Energy

/sM.B.Margulies,Esq., Chairman,

Atomic Safety and Licensing Board

Panel

dlDr.O.H. Paris,AdministrativeJudge

Atomic Safety and Licensing Board

Panel

/ f G. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

(bec w/ encl: See page 3)

!

,

I

__,- ,. ._= -_ __ __ _ ,

,- ,

,

.,-. ,

. .-,. . . .x.

Georgia Power Company 3

"

'

E pcc w/ enc 1:

UE. Reis, OGC

,fl.M. Hill,IE

JM-

'J. Miller,NRR

. Brach, EDO-

M. Sinkule, RII

'E. Christnot, RII

yNRCResidentInspector

Document Control Desk

State of Georgia

s.

.

'

RII RII

.4/b

EChristnot

/Ak

MSinkule

4/2]]87 4/Jy87

<-.