Georgia Power Company Post Offica Box 282
/
Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southern Company Services,Inc.
fbst Offico Box 2625 Birmingham, Alabama 35202 1.iepnene 205 8'""
Vogtle Project January 13, 1987 Director of Nuclear Reactor Regulation Files X7BC35 Attention:
Mr. B. J. Youngblood Log:
GN-1320 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 CONFIRMATORY ITEM 25:
IE BULLETIN 80-06 CONCERNS Dear Mr. Denton From the SER, Confirmatory Item 25 states:
"A test, to verify that the actual installed instrumentation and controls are in compliance with the requirements of IE Bulletin 80-06, will be conducted as part of the preoperational tests. On the basis of the applicant's commitment to such testing, the staff considers this issue resolved subject to confirmation that the test has been done."
This testing has been completed as part of preoperational test 1-300-01 which verified position upon resetting from the ESFAS initiation signals.
The test results confirm that the ESF equipment performs in accordance with IE Bulletin 80-06 and remains in the emergency mode as designed.
The steam generator blowdown isolation valves and the main / bypass feedwater control valves, which changed state af ter reset of the ESFAS signals, performed as designed due to the nature of the test configuration.
During a normal configuration'the design is such that these items would not have changed state after ESFAS reset.
Based on the results of the testing described above, GPC considers Confirmatory Item 25 to be resolved.
If your staff requires any additional information, please do not hesitate to contact me.
Sincerely,,
a.B J. A. Bailey Project Licensing Manager i
JAB /ddd
/
/
B701160255 870113 0
i PDR ADOCK 05000424 k
E PDR
_~
W Mr. Denton January 13, 1987.
Page Two xc:
R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig B. W. Churchill, Esquire R. W. McManus M. A. Miller (2)
L. T. Gucwa B. Jones, Esquire Vogtle Project File G. Bockhold, Jr.