Forwards Eighth Quarterly Update to Facility Startup Rept, Per Tech Spec 6.9.1.3.One Test Not Completed,As Indicated in Author .Addl Quarterly Updates Will Be Submitted as Required
ML20195F705
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 11/11/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8811220170
Download: ML20195F705 (2)


Text

Il I

c o

Dube har Compey Wu il T e.,

PUikx33fM li.e hr<id nt Charkar, N C 251.'1 I Wlev Pnd nrion (l01)3 ?]- ml DUKE POWER November 11, 1988

\\

\\'

Document Control Desk Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Catawba Nucicar Station, Unit 2 Docket No. 50-414 Eighth Quarterly Update to Startup Report Gentlemen In accordance with Section 6.9.1.3 of the Catawba Nuclear Station Technical Specifications, pica-o find attached ihe eighth quarterly update to the Unit 2 Startup Report. As indic.sted in my August 15, 1988 letter to NRC, one test is not complete. Additional quarterly updates to the Startup Report will be submitted as required by Technical Specifications.

Very truly yours, A

i-Hal B. Tucker JGT12.D1/lcs Attachment xcf H. L. Ernst, Regional Adtcinistrator U. S. Nuclear Regulatory Co:nrrission Region II 101 harlotta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. W. T. Orders NRC Resident Inspector Catawba nuclear Station t

t g/pJh GG11220170 831111 PDR ADOCK 05000414 g

PDC.

/ g l

  • a o.

STARTUP REPORT QUARTERLY UPDATE CATAWBA UNIT 2 CYCLE 1 NOVEMBER 11, 14R8 TESTING COMPLETED DURING QUARTER None.

STATUS OF TESTING NOT COMPLETE STEADY STATE PIPING SYSTEMS OPERATIO!OL VIBRATION MEAF'JREMENT - TP/2/A/1200/21 This test is described in Section 10.5 and 11.5 in the Startup Report.

It ',s complete except for retesting of piping associated with the Diesci Generator Fuel 011 and Lube 011 systems. Additional restraints were installed during the EOC-1 refueling outage.

However, further modifications have been found to be necessary. These modificationi involve the replacement of rigid o! tows with flexible elbows. Design Engineering is current ly evaluating sources at ;talified parts.

It has been determined by Design Enginoc"ing that a Nucicar Station Modification will be necessary to perform this piping replacement.

Completion of the test is dependent on these modifications.

t i